Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹9.1 L
EMD Value
₹20,140
Closing Date
14 Dec 2020, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER
HQ CE (P) VARTAK PIN - 931716 C/O 99 APO
Supply of Stores
2020_BRO_598918_1
30303/14TF/42TF/763TF/E PRO/45/E3ES
Open Tender
Miscellaneous Goods
Supply
60 days
Refer NIT Para 16
As per Tender
3 documents required · 3 mandatory
₹0
₹20,140
6 Jan 2021
24 Nov 2020
16 Dec 2020
25 Nov 2020
14 Dec 2020
28 Nov 2020
26 Nov 2020 - 27 Nov 2020
90 days
Supply of store
Rotary Booster Pump with Y Stamer: Technical Specification: (a) Rotary Booster Fuel pump integrated Y Stainer. (b) Pump Inlet : 1", Bung Size: 2" suitable for 210 litre barrel. Pump outlet: 3/4". (c) Pump should empty fuel barrel in 3 mins. (d) Geared 2 vane rotary pump. (e) Should discharge 3 times per rotation, i.e. for every turn of the handle the rotor should turn 3 times. (f) MOC: Aluminium die cast pump with sintered gear driven die cost zinc rotor & vanes. (g) Crank shaft mounted on ball bearings. (h) Should contain Y stainer to decrease the contamination of dirt and dust. (j) 1.8 m discharge hose with metal nozzle, spring and hose clamp. (k) Must contain Nozzle holder. (l) Die Cast Aluminium handle with security locking latch. ( m) WETTED COMPONENTS: Steel, Aluminium, Zinc, NBR, PVC Nitrile, Polyacetal.
Rotary Booster Pump with Metered Dispenging Nozzle Technical Specification: (a) Rotary Booster Fuel pump integrated with 2 m Anti static fuel hose and Metered Fuel Control Nozzle & Y stainer. (b) Pump Inlet : 1", Bung Size: 2" suitable for 210 litre barrel. Pump outlet: 3/4". (c) Pump should empty fuel barrel in 3 mins. (d) Geared 2 vane rotary pump. (d) Should discharge 3 times per rotation, i.e. for every turn of the handle the rotor should turn 3 times. (e) MOC: Aluminium die cast pump with sintered gear driven die cost zinc rotor & vanes. (f) Crank shaft mounted on ball bearings. (g) Should contain Y stainer to decrease the contamination of dirt and dust. (h) Anti- static Fuel Hose Size: 3/4" (inlet/outlet). Length:2 mtr. (j) Fuel Control Nozzle -Metered.. (Inlet/outlet): 3/4". (k) Fitted with digital fuel meter. (l) Die Cast Aluminium nozzle with built -in swivel at inlet . (m) Polyamide turbine measuring mechanism. WETTED COMPONENTS: Polyamide, Aluminium Steel, Nitrile Rubber. (n) Flow rate: 7- 75 LPM. Max working Presuure: 50 PSI. Water Resistant: IP55
Shanti Om Engineers
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .