| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97.0 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹1.3 Cr+₹18.4 L (16.0%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
₹82.1 L
EMD Value
₹1.6 L
Closing Date
10 Feb 2021, 6:55 pmClosed
EE PHED No.1 Rohtak
PHED No.1 Jhajjar Road Rohtak
Recall NANDAL Estimate for Augmentation of Water Supply Scheme Providing Functional Households Tap Connection Laying of Pipe Line and Renovation of Existing Structure of Water Works at Village Construction of S and S Tank and Repair of existing S
2021_HRY_157978_1
DNIT Approved vide SE No. 16 dt. 05.01.2021
Open Tender
Civil Works
Works
365 days
VPO Nandal
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹1.6 L
Yes
11 Mar 2021
29 Jan 2021
11 Feb 2021
29 Jan 2021
10 Feb 2021
29 Jan 2021
Amount
Desinging , Testing , Commissioning of water purification plant of 0.50 MLD capacity at exist Water Works Nandal, all other installation etc. comprising of DI pipe from raw water main/pump, inlet box of WTP and to CWT to C.W. suction well, inlet channel, Alum dozing, Flash mixing, Clari floculator, filter box, over head Reservoir for back wash including pump sets and electric control panel, waste water tank including pump sets and electric control panel, DI pipes, DI specials, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of floe measurement and sand bed with automation complete in all respects as per NIT (Sluice valve of make IVC/ VAG ) / WTP Nandal water works (0.50 MLD WTP)
Operation and maintenance for complete scope of work mention in the DNIT ( Disinfection material supplied by the PHED) as per Schedule-IV for a period 5 year after 12 month during defect liablity period 3 months trial run will be charged to the A/Mtc estimate
Operation and maintenance during defect liability period (Operation only)
Operation and maintenance during 1st year after defect liability period
Operation and maintenance during 2nd year after defect liability period
Operation and maintenance during 3rd year after defect liability period
Operation and maintenance during 4th year after defect liability period
Operation and maintenance during 5th year after defect liability period
Supply and fixing of G.I Nipple 1/2" X 4" complete in all respect and the entire satsfaction of Engineer-in- Charge (Make Jindal/Parkash/Tata) complete in all respect
Supply and fixing of G.I Socket 1/2" complete in all respect and the entire satsfaction of Engineer-in- Charge (Make Jindal/Parkash/Tata) complete in all respect
Supply and fixing of G.I Elbow 1/2" complete in all respect and the entire satsfaction of Engineer-in- Charge (Make Jindal/Parkash/Tata) complete in all respect
Bidder Name
Amount
SATVIR SINGH CONTRACTOR(GSTN-06ABNPS8716P1ZO)
Amarjeet Sindhu(GSTN-NA)
Amarjeet Sindhu
Amarjeet Sindhu
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .