Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.9 Cr+₹23.7 L (14.7%)Admitted-Finance 2 947 NELLAI NAGAR DHARMAPURI | DHARMAPURI | DHARMAPURI | TAMIL NADU | 636701 | ₹1.9 Cr+₹23.7 L (14.7%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹37.7 L (23.2%)Admitted-Finance MIG 354 4TH CROSS STREET MOGAPPAIR ERI SCHEME CHENNAI 37 | CHENNAI | ₹2.0 Cr+₹37.7 L (23.2%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical OLD NO 36 NEW NO 16 7TH EAST MAIN ROAD GANDHI NAGAR VELLORE 632 006 | VELLORE | VELLORE | TAMIL NADU | 632006 | - | - | Rejected-Technical BQR not satisfied |
| 5 | Rejected-Technical NO 15A NETHAJI NAGAR 8TH STREET ENNORE HIGH ROAD CHENNAI 600057 | CHENNAI | CHENNAI | TAMIL NADU | 600057 | - | - | Rejected-Technical BQR not satisfied |
| Sl No | Description | Qty | Unit | M s Kumaresan and co L1 | MANICKAVASAGAM L2 | ULTRAPOWER BUILDERS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete. Levelling the site | 720 | m3 | - | - | - |
| 2.00 | Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete Hard Gravelly soil | 1,352 | m3 | - | - | - |
| 3.00 | Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete SDR not requiring blasting | 338 | m3 | - | - | - |
| 4.00 | Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete Hard requiring blasting | 451 | m3 | - | - | - |
| 5.00 | Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete Hard rock requires wedging & chessling | 113 | m3 | - | - | - |
| 6.00 | Supplying and filling with good river sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete. | 90 | m3 | - | - | - |
| 7.00 | PCC M-10 with 20 to 40mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. | 273 | m3 | - | - | - |
| 8.00 | Providing RCC M25 raft using 12-20 mm HBG metal with out form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects | 190 | m3 | - | - | - |
| 9.00 | Plain cement concrete M 15 using 20mm HBG machine crushed metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete. (Chimney,PCC walls) | 410 | m3 | - | - | - |
| 10.00 | RCC M20 with 12 to 20mm HBG m/c metal with form work below GL including cost of all materials, cement, all labour, lead, lift, etc. complete. Raft concrete | 650 | m3 | - | - | - |
Tender Value
₹1.8 Cr
EMD Value
₹1.8 L
Closing Date
28 Nov 2019, 2:30 pmClosed
CE/TP-I/CHN
A-10, Thiru-Vi-Ka Indl Estate, Guindy, Chennai-32
Providing plinth for 230KV yard, RCC retaining wall, oil sump and allied civil works at Sathumadurai 230/110KVSS
2019_EB_147310_1
TP1-063/2019-20
Open Tender
Civil Works
Works
120 days
Sathumathurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.8 L
Yes
23 Jan 2020
16 Nov 2019
29 Nov 2019
16 Nov 2019
28 Nov 2019
16 Nov 2019
Amount
Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete. Levelling the site
Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete Hard Gravelly soil
Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete SDR not requiring blasting
Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete Hard requiring blasting
Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete Hard rock requires wedging & chessling
Supplying and filling with good river sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete.
PCC M-10 with 20 to 40mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete.
Providing RCC M25 raft using 12-20 mm HBG metal with out form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects
Plain cement concrete M 15 using 20mm HBG machine crushed metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete. (Chimney,PCC walls)
RCC M20 with 12 to 20mm HBG m/c metal with form work below GL including cost of all materials, cement, all labour, lead, lift, etc. complete. Raft concrete
Providing shoring and shuttering with country wood scantling at the time of excavation for foundation of towers including cost of all materials, labour, lead, lift, etc. complete.
Dewatering during the earthwork excavation including cost of all material,labour, lead, lift etc.,
Providing RCC M 20 using 20 mm HBG metal with form work for fire protection wall and cable duct side wall including cost of all material, lead, lift, etc., complete but excluding cost of all respects.
Providing MS/RTS reinforcement rod for RCC works including cutting, bending, tying and fixing in position as per drawing and specification including cost of all materials, all labour charges, lead, lift, etc. complete.
Plastering with CM 1:3-12mm thick for wall both interior and exterior faces including cost of all materials lead lift etc complete.
Colour washing two coats using white cement mixed with approved colouring pigments, including cost of all materials, labour, lead, lift, etc. complete.
Fabrication and supplying of 56 dia M28 / M20 foundation Bolt and nut of length 1.80m,threading for a length of 15 cm at top and hot dip galvanising of bolt including supply of 2 nos of GI nuts and washers and fixing in the position as directed by the engineer at site including assembling of template etc., cost of template, all material, labour, lead, lift etc., complete
Supply and fixing Labour charges for fixing MS Rail bit (90/120 LBS) on the transformer plinth including all labour charges and fixing proper grade alingment cutting rail bit, drilling lead and lift etc,complete.
Providing Anchor /Grip rod for foundation in the rock surface with drilling of 40 mm dia holes and fixing of 25 mm dia RTS rod 1.m length inside the holes and 1m length out side the holes with L shape bending including cost of all materials labour lead lift etc complete.
Supply and Fabrication and fixing of template for as per specification and drawing including cost of all materials,labour,lead,lift etc., complete
Labour charges for fixing of Template for as per specification and drawing including cost of all materials,labour,lead,lift etc., complete
Fabriaction, galvanising and supply of foundation bolts of various sizes and nuts with 2 nos. washer in Galvanized Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Suplying and labour for unwinding, laying and tensioning of 7.5x 2.5 cm 10 guage weldmesh fencing to a height of 1.80m as per standard specification and as instructed by the engineer at site including cost of all materials, G.I binding wire, J bolt etc., all labour,lead, lift, etc. complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
MANICKAVASAGAM
ULTRAPOWER BUILDERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_177314.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .