Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 CrAccepted-AOC | ₹6.3 Cr Quoted ₹6.9 Cr | L1 | Accepted-AOC Due to lowest amount |
| 2 | L2₹7.0 Cr+₹9.5 L (1.37%)Rejected-AOC 28 29 GALI NO 05 MAHABIR PARK 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | ₹7.0 Cr+₹9.5 L (1.37%) | L2 | Rejected-AOC Due to 2nd lowest amount |
| 3 | L3₹7.0 Cr+₹10.1 L (1.45%)Rejected-AOC 519 1A UPPER GROUND FLOOR MAIN ROAD VISHWAS NAGAR SHAHDARA DELHI 110032 | DELHI | SHAHDARA | DELHI | 110032 | ₹7.0 Cr+₹10.1 L (1.45%) | L3 | Rejected-AOC Due to 3rd lowest amount |
| Sl No | Description | Qty | Unit | aay kay enterprises L1 | suryacon engineers L3 | Suresh Kumar L2 |
|---|---|---|---|---|---|---|
| 1.00 | Searching of sewer manholes with metal detector / through pipe internal survey and hiring of JCB machine for excavation and dismantling of RCC slab/footpath and providing requisite labour etc. complete in all respect to the entire satisfaction of Engineer-in-charge. | 200 | Each | 2,000 ₹4,00,000 | 1,500 ₹3,00,000 | 1,000 ₹2,00,000 Lowest |
| 2.00 | Providing CCTV survey by Pan Till Camera with zooming and rotating 360 degree of pipe line after desilting and proper cleaning of existing storm water line for inspection and condition of pipe line and submit the soft/hard copy of the result showing the location and date of survey complete in all respect to the entire satisfaction of engineer-in-charge. | 14,620 | Metre | 200 ₹29,24,000 Lowest | 225 ₹32,89,500 | 200 ₹29,24,000 Lowest |
| 3.00 | Operation and Maintenance of Master Sewer line of badshapur east zone of various sizes (Approx. 29.26 KM or more) including patrolling and resolve all complaints (overflow, blockage by high power super sucker machine/ jetting machine, settlement of sewer line, changing of missing manhole cover with in 04 hrs.) | 30 | Per Month | 2,50,000 ₹75,00,000 Lowest | 4,52,000 ₹1,35,60,000 | 2,50,000 ₹75,00,000 Lowest |
| 4.00 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026)
21.113.7 For 600mm i/d sewer line | 6,520 | Metre | 2,350 ₹1,53,22,000 | 2,000 ₹1,30,40,000 Lowest | 2,465 ₹1,60,71,800 |
| 5.00 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge
and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item
also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of
workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per
satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026)
21.113.7 For 900mm i/d sewer line | 3,350 | Per Mtr. | 3,450 ₹1,15,57,500 | 2,600 ₹87,10,000 Lowest | 3,900 ₹1,30,65,000 |
| 6.00 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026) 21.113.7 For 1000 mm i/d sewer line | 1,600 | Per Metre | 3,700 ₹59,20,000 | 3,000 ₹48,00,000 Lowest | 4,200 ₹67,20,000 |
| 7.00 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026) 21.113.7 For 1200 mm i/d sewer line | 1,200 | Per Metre | 4,500 ₹54,00,000 | 3,600 ₹43,20,000 Lowest | 6,000 ₹72,00,000 |
| 8.00 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026) 21.113.7 For 450 mm i/d sewer line | 1,850 | Per Metre | 1,600 ₹29,60,000 | 900 ₹16,65,000 Lowest | 1,800 ₹33,30,000 |
| 9.00 | Strengthening/Rehabilitation of existing sewer system by cured in Place Pipe (CIPP) lining using hot water/steam curing of resin-impregnated felt, including site. survey, De-silting by mechanical means, provision of pumping and bypass arrangements, disposal of siltidebris. supply of all materials, labour, TandP, temporary power with DG acts, safety provisions (gas detectors, ventilators etc.), traffic control, barricading, lighting, Insurance, site clearance and disposal of malba: designing, manufacturing, supplying and installation of CIPP iner, dewatering, cleaning, surface preparation. repair of sewer and brickwork, stabilization, maintenance of gradient, grouting, repair/raising/construction of manholes. with PVC coated Cl covers, removal of obstructions, pre and post lining CCTV inspection, testing and commissioning, restoration of roads/surfaces, complete in all respects as per IS 11972:1987, IndSTT: 203-2022, sulting indian conditions and directions of Engineer-in-Charge.
As per Haryana Govt. GAZ.. notification dated 13/04/2026 HSR Item 21.111.4 for dia 800-900 mm | 220 | Metre | 75,000 ₹1,65,00,000 | 90,000 ₹1,98,00,000 | 57,000 ₹1,25,40,000 Lowest |
Tender Value
₹6.0 Cr
EMD Value
₹12.1 L
Closing Date
11 Jun 2026, 5:00 pmClosed
SAMUNDER SINGH
Division FMDA
Master Sewerage Scheme Faridabad- Desilting and Cleaning of Balance Master Sewer Line falling in Badshapur East including Operation and Maintenance for 2.5 Years for all sewer lines related to Badshapur East Side of NH-44 zone.
2026_HRY_527253_1
2026763AF2CB FCFD 4052 84CE A3796D86D2851851002
Open Tender
Civil Works
Works
915 days
Faridabad (MC)
2 documents required · 2 mandatory
₹1,180
₹12.1 L
Yes
FMDA Office, SCO-28-32, Sector-12, Faridabad
4 Aug 2026
5 Jun 2026
12 Jun 2026
5 Jun 2026
11 Jun 2026
5 Jun 2026
5 Jun 2026 - 7 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Searching of sewer manholes with metal detector / through pipe internal survey and hiring of JCB machine for excavation and dismantling of RCC slab/footpath and providing requisite labour etc. complete in all respect to the entire satisfaction of Engineer-in-charge. | 200 | Each | - | - |
| 2 | Providing CCTV survey by Pan Till Camera with zooming and rotating 360 degree of pipe line after desilting and proper cleaning of existing storm water line for inspection and condition of pipe line and submit the soft/hard copy of the result showing the location and date of survey complete in all respect to the entire satisfaction of engineer-in-charge. | 14,620 | Metre | - | - |
| 3 | Operation and Maintenance of Master Sewer line of badshapur east zone of various sizes (Approx. 29.26 KM or more) including patrolling and resolve all complaints (overflow, blockage by high power super sucker machine/ jetting machine, settlement of sewer line, changing of missing manhole cover with in 04 hrs.) | 30 | Per Month | - | - |
| 4 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026)
21.113.7 For 600mm i/d sewer line | 6,520 | Metre | - | - |
| 5 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge
and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item
also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of
workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per
satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026)
21.113.7 For 900mm i/d sewer line | 3,350 | Per Mtr. | - | - |
| 6 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026) 21.113.7 For 1000 mm i/d sewer line | 1,600 | Per Metre | - | - |
| 7 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026) 21.113.7 For 1200 mm i/d sewer line | 1,200 | Per Metre | - | - |
| 8 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026) 21.113.7 For 450 mm i/d sewer line | 1,850 | Per Metre | - | - |
| 9 | Strengthening/Rehabilitation of existing sewer system by cured in Place Pipe (CIPP) lining using hot water/steam curing of resin-impregnated felt, including site. survey, De-silting by mechanical means, provision of pumping and bypass arrangements, disposal of siltidebris. supply of all materials, labour, TandP, temporary power with DG acts, safety provisions (gas detectors, ventilators etc.), traffic control, barricading, lighting, Insurance, site clearance and disposal of malba: designing, manufacturing, supplying and installation of CIPP iner, dewatering, cleaning, surface preparation. repair of sewer and brickwork, stabilization, maintenance of gradient, grouting, repair/raising/construction of manholes. with PVC coated Cl covers, removal of obstructions, pre and post lining CCTV inspection, testing and commissioning, restoration of roads/surfaces, complete in all respects as per IS 11972:1987, IndSTT: 203-2022, sulting indian conditions and directions of Engineer-in-Charge.
As per Haryana Govt. GAZ.. notification dated 13/04/2026 HSR Item 21.111.4 for dia 800-900 mm | 220 | Metre | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_606233.xls
BOQ • 0.28 MB
AD0162318.pdf
Additional Documents • 5.03 MB
C_527253.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .