Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance B 184 SECOND FLOOR GUPTA JI PLAZA NHPC CHOWK FARIDABAD HARYANA 121010 FARIDABAD HARYANA 121010 | FARIDABAD | HARYANA | 121010 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 3RD FLOOR GOVIND PLAZA FAIZABAD ROAD CHINHAT TIRAHA LUCKNOW UTTAR PRADESH 226028 | LUCKNOW | UTTAR PRADESH | 226028 | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical NON-RESPONSIVE |
| 5 | Rejected-Technical A 109 SECTOR 10 NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | Rejected-Technical NON-RESPONSIVE |
Tender Value
₹21.4 L
Closing Date
1 Feb 2021, 4:00 pmClosed
Er. K.K. Padotra
Office of the Deputy General Manager, JKPCC Ltd., Unit Mechanical, Rail Head Complex Jammu.
Design, Supply, Installation, Testing and Commissioning of 20 KLD Combined Effluent Treatment Plant for Indira Gandhi Dental Hospital Jammu on turnkey basis.
2021_PWDJK_114309_1
e-NIT No. 44/MECH of 2020-21 Dt. 21-01-2021.
Open Tender
Miscellaneous Works
Item Rate
45 days
JAMMU
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
Yes
Convener, purchase committee, Directorate of ISM
Exempted
19 Feb 2021
22 Jan 2021
2 Feb 2021
22 Jan 2021
1 Feb 2021
22 Jan 2021
Amount
Design, Supply, Installation, Testing and Commissioning of 20 KLD Combined efflunt Treatment Plant for Indira Gandhi Dental Hospital Jammu. Plant in of modular construction/packaged all in one. The treatment process will consists of four stages. I.e Stage 1: Primary Treatment :Screen chamber, oil & grease removal. Stage 2: Secondary or biological treatment Inlet chamber, chemical reaction tank, flocculation & tube settler Stage 3: Tertiary treatment:Filter feed tank, hypo dosing system, pressure sand filter & activated carbon filter.Stage 4: Sludge Treatment Sludge holding tank, sludge drying beds & sludge press machine. BASIC DATA ON INPUT RAW WASTE WATER Total Suspended Solids (TSS) : 250 - 450 mg/lit BOD5 : 250 - 350 MG/LIT COD : 500 - 700 mg/lit pH : 6.0 - 8.5 oil/Grease : upto 30-40 mg/lit Inflow time :24HRS Peak factor :3 Temperature :Ambient.BASIC DATA TREATED WATER Total Suspended Solids (TSS) : ˂100 mg/lit BOD : ˂30 MG/LIT COD : ˂250mg/lit pH : 6.5 - 8.5 oil/Grease : upto ˂10 mg/lit. It also includes CIVIL WORKS i.excavation and earth work, construction of foundations , construction of the requisit under ground collection tank of 20KLD in RCC , sludge drying beds, oil and grease trap and other allied civil works required as per site condition as per requirement. SITC of Coagulation Tank, Flocculation Tank, Dosing Tanks, Aeration Tank,Air blowers, MBR Tank, MBR Module, MBR Skid, Final Treated water tank . The Plant shall be complete with a central Electrical Power and Control panel fully pre/site wired and with all power and control cables to all pumps and equipment including all instrumentation, water level controllers and other control panel.Job includes cooper plate earthing of all equipments of plant etc. The Complete Treatment process, Technical paramenters and the items/equipments are as per Annexure A attached.
Comprehensive Annual Maintainance contract for 3 years from the date of expiry of Warranty as per annexure A.
Greenagers Enviro Solutions and Services Pvt. Ltd.
Enhance Ecotech Solution Pvt Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .