Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.2 LAccepted-Finance 11 126 GWAL TOLI KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹9.2 L | 1 | Accepted-Finance L-1 |
| 2 | 2₹9.2 L+₹3,339.39 (0.36%)Rejected-Finance HOUSE NO 95 26 HALIM COMPOUND PEACHBAG KANPUR | KANPUR | UTTAR PRADESH | ₹9.2 L+₹3,339.39 (0.36%) | 2 | Rejected-Finance L-2 |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹9.3 L
EMD Value
₹92,761
Closing Date
15 Jul 2026, 3:00 pmClosed
CHIEF ENGINEER, KMC
Motijheel
Supply and fixing of bolard from star Bankery to Saraiya trun and taj darbar to galla godam turn Under Zone-02
2026_NNKAN_1167602_1
1124/AA-2/25-26
Open Tender
Civil Works
Fixed-rate
45 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹92,761
18 Jul 2026
13 Jul 2026
15 Jul 2026
13 Jul 2026
15 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation in trenches for foundations pipes Cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in distance of 50 mtr. | 25.2 | cum | 215 | ₹5,418 |
| 2 | Providing and laying Cement concrete (1:6:12,1 Cement:6 fine sand:12 Brick ballast nominal size 40mm) and curing complete, including cost of form work in foundation and floors. | 6.72 | cum | 4,380 | ₹29,433.6 |
| 3 | Supply and fixing of bolard including all labour all work. | - | nos | 1,309 | - |
| 4 | P/A wall putty of 1mm thick including all work. | 59.4 | sqm | 135 | ₹8,019 |
| 5 | Finishing walls with two coat of acrylic smooth exterior paint of best quality including supply of all material labour and T and P etc required for proper completion of the work. | 59.4 | sqm | 132 | ₹7,840.8 |
| 6 | Cartage of Earth up to 3 Km incluidng all completion of work. | 20.16 | cum | 116.96 | ₹2,357.91 |
| 7 | Add 18% G.S.T | 1 | tax | 1,41,499.68 | ₹1,41,499.68 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.31 MB
BOQ_2189745.xls
BOQ • 0.28 MB
100stamp.pdf
Tender Documents • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .