Executive Engineer (Civil) Tender KTK Circle
Executive Engineer (Civil) Tender BSNL KTK Circle Room No 324, 3rd Floor, O/o CGMT, Doorasamparka Bhavan, No.1 Swamy Vivekananda Road Bengaluru 560008
Demolishing and Reconstruction of Dilapidated Compound wall on front side of TE Building at HAVERI
2024_BSNL_198792_1
13/NIT/BSNL/CD/HBL/2024-25
Open Tender
Civil Works - Buildings
Item Rate
90 days
Hubballi
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
The Accounts Officer (Cash) BSNL Hubballi
₹10,280
3 Jul 2024
19 Jun 2024
2 Jul 2024
21 Jun 2024
29 Jun 2024
21 Jun 2024
21 Jun 2024 - 28 Jun 2024
Amount
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
In cement mortar
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material disposal of unserviceable material within 50 meters lead as per direction of engineer incharge.
In cement mortar
Taking out M.S. Grill/Gate carefully and stacking in the designated place etc., completeas per the direction of Engineer-in-charge.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:5:10 (1 cement : 5 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 10 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA) )
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering,shuttering and finishing:
1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concete excluding the cost of centering shuttering , finishing and reinforcement- All work up to plinth level
1:1.5:3 (1Cement : 1.5 Coarse sand : 3 Stone aggregate 20mm nominal size.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc. and removal of form work for
Foundation footings, bases of columns
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Column pillars, piers, abutments, Posts and Struts
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Random rubble masonry with available stones (received after demolishing existing stone work) in foundation and plinth including levelling up with cement concrete 1;6:12 (1Cement 6 Coarse sand : 12 graded stone aggregate 20mm nominal size. Up to plinth level
Cement mortar 1:6 (1 cement : 6 coarse sand)
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1;6:12 (1:Cement 6 : Coarse sand : 12 graded stone aggregate 20mm nominal size. Up to plinth level
Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 3.5 in foundation and plinth in:
Cement mortar 1:6 (1 cement : 6 coarse sand)
15 mm cement plaster on the rough side of single or half brick wall of mix :
1:6 ( 1 cement : 6 fine sand )
12 mm thick plain cement mortar bands in cement mortar 1:4( 1cement : 4 fine sand)
Raised band
6 mm cement plaster of mix :
1:3 (1 cement : 3 fine sand)
Finishing walls with water proofing cement paint of required shade
New work (Two or more coats applied @ 3.84 kg/10 sqm)
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade
Two or more coats on old work
Fixing available MS Compound Grill/Gate with necessary repais like straightening, welding and providing hold fast with MS angle of size 40x40x6mm, wherever required, including embeding the hold fast in RCC columns including lifting and fixing in position, etc., complete as directed by the Enigineer-in-charge.
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. sqm 12.55
Easening of MS Gate, including greesing, welding wherever required, and make easy movement and as per directions of Engineer in charge.
Cutting roots of trees rooted in foundation of the compound wall with suitable tools, carrying the rubbish to the dumping place and making clear the site to make easy for pile foundation as directed by the Engineer- in - charge.
SRI BASAVARAJ G PATIL
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .