Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 CrAccepted-Finance | ₹7.4 Cr | L1 | Accepted-Finance Lowest Bid |
| 2 | L2₹7.4 CrAccepted-Finance | ₹7.4 Cr | L2 | Accepted-Finance Higher Bid |
| Sl No | Description | Qty | Unit | M/S ITA TRADERS L1 | M/S T.L. CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00SH : FORMATION CUTTING | |||||
| 2.00Excavation in Soil by Manual Means. | |||||
| 3.00 | Excavation in Hilly Areas in Soil by Manual Means (Excavation in soil in Hilly Area by Manual Means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification | 43,946.7 | Cum | 395.6 ₹1.7 Cr | 396.35 ₹1.7 Cr |
| 4.00 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders. | 21,973.35 | Cum | 105.48 ₹23.2 L | 105.55 ₹23.2 L |
| 5.00Excavation in Ordinary Rock by Manual Means | |||||
| 6.00 | Excavation in Hilly Area in Ordinary Rock by Manual Means (Excavation in Ordinary Rock using Manual Means including loading in a truck and carrying of excavated material to embankment site with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.) | 14,648.9 | Cum | 650.26 ₹95.3 L | 651.55 ₹95.4 L |
| 7.00Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres | |||||
| 8.00 | Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres | 14,648.9 | Cum | 295.65 ₹43.3 L | 295.65 ₹43.3 L |
| 9.00 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock) | 14,648.9 | Cum | 122.6 ₹18.0 L | 122.61 ₹18.0 L |
| 10.00SH:- CROSS DRAINAGE | |||||
Tender Value
Refer Docs
EMD Value
₹7.4 L
Closing Date
9 Apr 2026, 11:00 amClosed
Executive Engineer
Office of the Executive Engineer, PWD, Tali Division.
Co Road from Niobia to Zara in Kra Daadi District (13 Km), Ph-II (Sh Carpeting, Cross Drainage, Breast Wall, CC Drain, Retaining wall etc.
2026_PWDAP_3346_1
TD/W-12/RIDF/2025-26/ 06
Open Tender
Civil Works
547 days
Kra Daadi
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
EE, PWD, Tali Division
₹7.4 L
16 Apr 2026
27 Mar 2026
9 Apr 2026
27 Mar 2026
9 Apr 2026
27 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH : FORMATION CUTTING | |||||
| 2Excavation in Soil by Manual Means. | |||||
| 3 | Excavation in Hilly Areas in Soil by Manual Means (Excavation in soil in Hilly Area by Manual Means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification | 43,946.7 | Cum | - | - |
| 4 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders. | 21,973.35 | Cum | - | - |
| 5Excavation in Ordinary Rock by Manual Means | |||||
| 6 | Excavation in Hilly Area in Ordinary Rock by Manual Means (Excavation in Ordinary Rock using Manual Means including loading in a truck and carrying of excavated material to embankment site with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.) | 14,648.9 | Cum | - | - |
| 7Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres | |||||
| 8 | Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres | 14,648.9 | Cum | - | - |
| 9 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock) | 14,648.9 | Cum | - | - |
| 10SH:- CROSS DRAINAGE | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
TenderDocuments.pdf
Tender Documents • 6.44 MB
BOQ_3542.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid