Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹2.4 LAccepted-Finance | ₹2.4 L | Ist | Accepted-Finance L-1 Bidder |
| Sl No | Description | Qty | Unit | PRAGATI CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.01(A) SUPPLY | ||||
| 1.02 | Joint box (48 Fibre) | 2 | No | 10,000 ₹20,000 |
| 1.03 | FODP 48F Indoor Type, rack mounted with FCPC coupling and pig tails(5mtrs each) | 2 | No | 15,000 ₹30,000 |
| 1.04 | Pre-connectorized Optical Fiber Patch Cords (10 Meters) pack of 06 Patch Cords | 5 | No | 7,000 ₹35,000 |
| 1.05(B) ERECTION | ||||
| 1.06 | Installation, Termination, Testing & Commissioning of Fibre optic approach cable for 48F OPGW alongwith all necessary hardware sets including ties/clips/cleats, conduits, ducts, supports, fittings, accessories etc. and its entire associated works as per supervising engineer. | 1 | KM | 1,00,000 ₹1 L |
| 1.07 | Installation, Termination, Testing & Commissioning of FODP 48F: Indoor type, rack mounted with FCPC coupling and pig tails (5mtr each) as per instruction supervising engineer. | 2 | No | 20,000 ₹40,000 |
| 1.08 | Splicing & Installation of Joint Box (48 Fibre) as per instruction of supervising engineer | 2 | No | 8,000 ₹16,000 |
| 1.09Note- a) Any additional requirement of works, minor consumables, T&P, manpower, hydra, crane, welding machine, etc. not mentioned shall be met by contractor at his own cost. b) Parallel teams of skilled and unskilled labour shall be deployed on each equipment in a bay so that the shutdown time may be optimized and work shall be completed in minimum possible time. c) The contractor shall ensure safety of the manpower involved in the job by providing proper safety equipments such as safety shoes, safety jackets, safety belt, helmets etc. and ensure all safety compliance during work. d) At the place where digging is required will be digged and then levelled by contractor after proper completion of work. e) Working of all protection and operation of equipments/ bays will treated as completed work. | ||||
Updated dates
Tender Value
₹2.4 L
EMD Value
₹3,000
Closing Date
12 Nov 2025, 12:00 pmClosed
SE, ETC, Varanasi
Bhikharipur, DLW, Varanasi
SUPPLY AND ERECTION WORK TO PROVIDE CONNECTIVITY OF 132KV SUBSTATION AHRAURA TO SLDC LUCKNOW/MODIPURAM THROUGH LILO OF 132 kV MIRZAPUR-CHUNAR LINE
2025_UPTCL_1078985_2
Short Term E-Tender No. 38/2025-26/ETC-I/VNS
Open Tender
Electrical Works
20 days
132KV SUBSTATION AHRAURA
Fee/EMD/PAN/GST Registration and experience for execution of work as per specification
2 documents required · 2 mandatory
₹590
SE, ETC, Varanasi
₹3,000
2 Feb 2026
30 Oct 2025
13 Nov 2025
30 Oct 2025
12 Nov 2025
1 Nov 2025
Amount
(A) SUPPLY
Joint box (48 Fibre)
FODP 48F Indoor Type, rack mounted with FCPC coupling and pig tails(5mtrs each)
Pre-connectorized Optical Fiber Patch Cords (10 Meters) pack of 06 Patch Cords
(B) ERECTION
Installation, Termination, Testing & Commissioning of Fibre optic approach cable for 48F OPGW alongwith all necessary hardware sets including ties/clips/cleats, conduits, ducts, supports, fittings, accessories etc. and its entire associated works as per supervising engineer.
Installation, Termination, Testing & Commissioning of FODP 48F: Indoor type, rack mounted with FCPC coupling and pig tails (5mtr each) as per instruction supervising engineer.
Splicing & Installation of Joint Box (48 Fibre) as per instruction of supervising engineer
Note- a) Any additional requirement of works, minor consumables, T&P, manpower, hydra, crane, welding machine, etc. not mentioned shall be met by contractor at his own cost. b) Parallel teams of skilled and unskilled labour shall be deployed on each equipment in a bay so that the shutdown time may be optimized and work shall be completed in minimum possible time. c) The contractor shall ensure safety of the manpower involved in the job by providing proper safety equipments such as safety shoes, safety jackets, safety belt, helmets etc. and ensure all safety compliance during work. d) At the place where digging is required will be digged and then levelled by contractor after proper completion of work. e) Working of all protection and operation of equipments/ bays will treated as completed work.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
Documents.pdf
Tender Documents • 0.76 MB
BOQ_1993952.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid