Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹5,800
Closing Date
13 Jul 2026, 2:00 pm3d left
E.E.W.S(S)
135 P A SHAH ROAD KOL-68
MAINTENANCE OF WATER SUPPLY NETWORK BYCUT AND FLUSH METHOD, CHANGING SV, NRV OF EXISTING TUBEWELL AND ANCILLARY WORK OF GANGULI BAGAN, B GHATA RD, D P P ROAD AND OTHER LOCATION IN WARD NO.100, BR.-X.
2026_KMC_1030374_1
KMC/WS/EE/S/100/26-27/01/1st Call
Open Tender
MECHANICAL
50 days
GANGULI BAGAN, B GHATA RD, D P P ROAD
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,800
3 Jul 2026
3 Jul 2026
15 Jul 2026
3 Jul 2026
13 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DI SPUN PIPE 100 MM(4'') (TYTON JOINT) CONFORMING TO IS 8329/2000 CLASS K-7 SUITABLE FOR PUSH-ON-JOINT (RUBBER GASKET JOINING) WITH INSIDE CEMENT MORTAR LINING AND OUTSIDE BITUMINOUS/ SYNTHETIC RESIN COATING COMPATIBLE WITH THE METALLIC ZINC COATING AS PER CLAUSE A-8 | 20 | MTR | 1,014.41 | ₹20,288.2 |
| 2 | D.I. PIPE (CLASS K7) DIA 150MM (TYTON JOINT) CONFORMING TO IS 8320/2000 CLASS K-7 SUITABLE FOR PUSH -ON-JOINT (RUBBER GASKET JOINING) WITH INSIDE CEMENT MORTER LINING AND OUTSIDE BITUMINOUS /SYNTHETIC RESIN COATING COMPATIBLE WITH THE METALLIC ZINC COATING AS PER CLAUSE A-8. | 10 | MTR | 1,412.71 | ₹14,127.1 |
| 3 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.12 Supplying sign-board made of 25 mm thick sal plank with frame on all side of sal batten 50 mm x 32 mm with nailed on post 3.15m x 100mm x100mm and fitting fixing such with digging holes of dia 300 mm and depth 750 mm in all sorts of soil and repacking and consolidating the gap aroundthe post with cement concrete (1 : 3 : 6) painting 2 coats including cost of nails, bolts and nuts etc. complete in all respect as per direction of theEngineer-in-charge. Payment of concrete and painting to be made separately. (i) 600 mm. x 450 mm. size of board. | 3 | EA | 427 | ₹1,281 |
| 4 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.10 Hire and labour charges for coir rope fencing 25 mm dia rope single on 120 mm dia bamboo posts 1.40 m above G.L and 600 mm below G.L, 1.50 m apart including digging holes complete. | 35 | MTR | 17 | ₹595 |
| 5 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.14 Signalling arrangement at both sides of site to avoid any accident during working period 4 nos. red flags during sunlight at 4 corners and 2 nos light (lamp) in other than sunlight. | 10 | DAY | 202 | ₹2,020 |
| 6 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 25 | %M3 | 119.27 | ₹2,981.75 |
| 7 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.5 Cutting & picking up existing metalled black top portion of road surface to an average depth of 300 mm by using Jack hammer with all necessary tool and plant including reening the serviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Charge. | 2 | M3 | 636 | ₹1,272 |
| 8 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.2 Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.(Payment to be made based on the basis of measurement of finished quantity of work.(a) With earth obtained from excavation of foundation | 25 | %M3 | 77.54 | ₹1,938.5 |
| 9 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.3 All types of Ductile Iron (D.I) Specials (viz. Bend. Tee. Taper. Tail piece etc), size conforming to I.S. Specification No. 9523/2000 with cement mortar lining (inside) and bituminous coating (outside). (25% of payment will be held up till successful hydraulic testing) a) All Socket Tee 100 mm to 300mm dia. | 42 | KG | 128 | ₹5,376 |
| 10 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.3 All types of Ductile Iron (D.I) Specials (viz. Bend. Tee. Taper. Tail piece etc), size conforming to I.S. Specification No. 9523/2000 with cement mortar lining (inside) and bituminous coating (outside). (25% of payment will be held up till successful hydraulic testing)c) Tail Piece 100 mm to 300mm dia. | 175.2 | KG | 144 | ₹25,228.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_2530081.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid