Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.5 LAccepted-AOC | ₹62.5 L | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹62.7 L+₹16,927.80 (0.27%)Rejected-Finance ANAND NAGAR PERI PURE SHIVA BAKHTAWAR DIST GONDA | GONDIA | MAHARASHTRA | 441601 | ₹62.7 L+₹16,927.80 (0.27%) | L2 | Rejected-Finance Highest Amount Quoted |
Tender Value
₹63 L
EMD Value
₹5.2 L
Closing Date
20 Apr 2026, 12:00 pmClosed
Superintending Engineer,
Superintending Engineer, Badaun/Pilibhit Circle,P.W.D.,Bareilly
Utility Shifting (Electric Poll Transformers etc) work for Strengthening Widening work of Usawan Akabarpur Sathra Mathla Katra road (ODR) under Dataganj Vidhansabha
2026_CEBLY_1136646_1
3007/7NividaPD ET-8/26-27 dt 06-04-26
Open Tender
Electrical Works
Percentage
180 days
Budaun
Please refer Tender Documents
3 documents required · 3 mandatory
₹2,714
₹5.2 L
Yes
Bareilly
10 Jun 2026
13 Apr 2026
20 Apr 2026
13 Apr 2026
20 Apr 2026
13 Apr 2026
14 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | SHIFTING OF 11 KV LINE ROAD CROSSING
PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC ACSR RABBIT CONDUCTOR | 1 | KM | - | - |
| 1.02 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC FOR STP POLE 11 MTR LONG | - | No. | - | - |
| 1.03 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR CROSS BRACING M S ANGIL | - | SET | - | - |
| 1.04 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR BOLT & NUT | - | KG | - | - |
| 1.05 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR STONE PAD | - | NOS | - | - |
| 1.06 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR GARURDING ANGLE 50X50X5X2500 MM | - | NOS | - | - |
| 1.07 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR DROPPER CHANNEL 100X50MM | - | NOS | - | - |
| 1.08 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR TOP CHANNEL 100X50X2240 | - | NOS | - | - |
| 1.09 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR T, DEROPER,TOP CHANNEL CLAMP | - | NOS | - | - |
| 1.1 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR 11 KV POLYMERIC DISC INSULATOR With Fitting | - | NOS | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
T2.pdf
Tender Documents • 1.91 MB
BOQ_2122493.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .