| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC 00 HANSH NAGAR RADHA RAMAN ROAD MAINPURI MAINPURI UTTAR PRADESH 205001 | MAINPURI | UTTAR PRADESH | 205001 | ₹2.1 L | L1 | Accepted-AOC RECOMMENDED BY TC |
| Sl No | Description | Qty | Unit | S K ENTERPRISES L1 |
|---|---|---|---|---|
| 0.00SCOPE OF WORK for complete work is as under- 1. Disconnection and removal of cables followed by cleaning of cable trays. 2. Layout of cable from and to: • Ring collector to HT Panel. • HT Panel to Main motor 1 • HT Panel to Main Motor 2 • Drag generator to DWTP • DWTP to Drag motor and walk motor • Proper lugging of cable, followed by ferruling and forming proper connection • Final testing | ||||
| 1.01 | Total Labour cost including contractor's profit (Exclusive of GST) for Complete job in PAWAN DRAGLINE as per SCOPE OF WORK and NIT | 1 | Job | 1,67,500 ₹1,67,500 Lowest |
| 1.02 | Total charge(Exclusive of GST) for Providing of Tools & Tackles for Complete job in PAWAN DRAGLINE as per SCOPE OF WORK and NIT | 1 | Job | 4,500 ₹4,500 Lowest |
| 1.03 | Total charge(Exclusive of GST) for Providing of To & fro transportation of manpower & tools for Complete job in PAWAN DRAGLINE as per SCOPE OF WORK and NIT | 1 | Job | 3,300 ₹3,300 Lowest |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - |
Tender Value
Refer Docs
EMD Value
₹2,600
Closing Date
29 Jul 2026, 11:00 amClosed
GM (Excavation), Dudhichua Area
Office of the GM (Excavation), Dudhichua Project PO Khadia, Distt. Sonebhadra, UP - 231222
Offloading work for Replacement of burnt HT and LT cables in PAWAN 24 96 Dragline of Dudhichua Project
2026_NCL_362004_1
DCH/GM (Excv)/Tender/Dragline /2026-27/19
Open Tender
Excavation Department Work
Item Rate
365 days
NCL, Dudhichua Project
Please refer Tender documents
5 documents required · 5 mandatory
₹2,600
20 Aug 2026
14 Jul 2026
31 Jul 2026
14 Jul 2026
29 Jul 2026
15 Jul 2026
14 Jul 2026 - 22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0SCOPE OF WORK for complete work is as under- 1. Disconnection and removal of cables followed by cleaning of cable trays. 2. Layout of cable from and to: • Ring collector to HT Panel. • HT Panel to Main motor 1 • HT Panel to Main Motor 2 • Drag generator to DWTP • DWTP to Drag motor and walk motor • Proper lugging of cable, followed by ferruling and forming proper connection • Final testing | |||||
| 1.01 | Total Labour cost including contractor's profit (Exclusive of GST) for Complete job in PAWAN DRAGLINE as per SCOPE OF WORK and NIT | - | Job | - | - |
| 1.02 | Total charge(Exclusive of GST) for Providing of Tools & Tackles for Complete job in PAWAN DRAGLINE as per SCOPE OF WORK and NIT | - | Job | - | - |
| 1.03 | Total charge(Exclusive of GST) for Providing of To & fro transportation of manpower & tools for Complete job in PAWAN DRAGLINE as per SCOPE OF WORK and NIT | - | Job | - | - |
| 2Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.71 MB
ANNEXURES.pdf
Tender Documents • 0.69 MB
ITB_COC_ATC.pdf
Tender Documents • 0.82 MB
BOQ_374896.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .