| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹1.6 L (1.19%)Admitted-Finance | ₹1.4 Cr+₹1.6 L (1.19%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M Rajagopal L1 | M/s-U. TECH SERVICE L2 |
|---|---|---|---|---|---|
| 1.00PART-A Design, Supply, Installation, Testing and Commissioning of 8 Passenger(544Kgs) Machine Roomless Elevator with Glass Cabin & SS Framed Glass Door, M.S Steel Structure, Glass Gladding | |||||
| 1.01 | Design, Supply, Installation of One Number 8 Passenger MRL Lift with Glass Cabin and Framed Glass Door. Motor HP/KW 3.6 KW (Gear Less Machine) Drive Rating 5.5 KW Controller Type Full Collective Rope Steel Core,10 mm Travelling Cable Induction Prevented flat 24 core Guide rails 16 mm (imported) Rated Speed (m/s) 1.5 m/s. Total Number of Landings /Stoppings Ground & Terrace -3 Doors Total Travelling Range Up to 26 meters (approximate). Size of the Lift Well (mm) 2210 mm W X 2020 mm D Depth of the Lift Pit (mm) 1500 mm from Ground floor finish level Overhead Required (mm) 4200 mm H from Top floor finish level Lift Car Size (mm) 1300 mm W X 1100 mm Door Opening size (mm) 800 mm X 2000mmH Automatic Rescue Device: Yes, Battery powered ARD Function Lift car will reach the Nearest floor in case of Power Failure. Inclusive of provision for connecting platform at 1st, 2nd, & top Landing and also inclusive of all civil works required as per site condition and as per drawing | 1 | set (complete all works) | 23,60,000 ₹23,60,000 Lowest | 25,00,000 ₹25,00,000 |
| 1.02 | Supply, Fabrication ,Installation of MS Steel Structure(180X180X8)MM Thickness square tube with rust proof painting as per drawing and site conditions including supply of all materials, machineries, tools & plants, Designing, testing and submission of test report of structural connection like welding thickness and nut & bolt joints etc from authorised testing agency( The work should be fabricated registered proffessional fabricated company),transportation and all other charges etc complete | 24,000 | KG | 155 ₹37,20,000 | 154 ₹36,96,000 Lowest |
| 1.03 | Toughened Saint Gopian Clear Air Proof Glass Gladding (12mm Thickness with Spider Fitting –Dorma Make and Saingobin Glass) as per drawing and site conditions including supply of all materials, machineries, tools & plants, transportation and all other charges etc complete | 2,984 | Sqft | 1,550 ₹46,25,200 Lowest | 1,700 ₹50,72,800 |
| 1.04Pit Civil Work, Scaffolding, Minor Builder works, Water Proofing work, 3 Phase shaft electrical works & Bulk Head Fixing) as per drawing and site conditions including supply of all materials, machineries, tools & plants, transportation and all other charges etc complete | |||||
| 1.05 | Construction of Lift pit inclusive of providing & laying PCC, RCC, steel & form work, Earthwork excavation, back filling. Also plastering the exposed surface, waterproofing & painting, making of 3nos lift door opening in existing LH tower including dismantling, repairing works, finishing works etc. Measurement shall be taken surface area (vertical) of lift wall outer to outer size 2.02m x 2.38m all as per drawing including cost of supply of all materials ,tools & plants, curring, scaffolding and all other charges etc complete | 234 | Sqft | 1,730 ₹4,04,820 | 1,600 ₹3,74,400 Lowest |
| 1.06 | Steel scaffolding for structural work, glass fixing lift errectin work etc complete and de-errection of scaffolding after completing all works. | 1 | Job | 1,73,000 ₹1,73,000 | 1,50,000 ₹1,50,000 Lowest |
| 1.07 | Shaft Electrical work, bulkhead fitting inside of lift. All electrical works incuding cable for lift operation etc complete. | 1 | Job | 1,73,000 ₹1,73,000 | 1,50,000 ₹1,50,000 Lowest |
| 2.00PART-B Providing outside balcony for visitor at 26.3m height in Kanniyakuamri Lighthouse Tower. | |||||
| 2.01 | Demolishing of R.C.C. work by mechanical means, stocking of serviceable materials at designated location,disposing of unserviceable materials away from site including cutting of steel reinforcement bars including cost of all labour, tools & plants, transportation charges etc complete. | 16 | cum | 2,207 ₹35,312 | 150 ₹2,400 Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
29 Jun 2020, 3:00 pmClosed
The Director
5 20 JAFFER SYRANG STREET CHENNAI 600 001
Design Supply Installation Testing and Commissioning of 8 Passenger 544Kgs Machine Room less Elevator with Glass Cabin and SS Framed Glass Door MS Steel Structure Glass Gladding including RCC foundation Civil work Lift License and clearance etc
2020_DGLL_551366_1
MDS 7 WS(Lift) 2018
Open Tender
Civil Works
Item Rate
180 days
Kanyakumari
bonafide Regular Civil Engineering contractors with joint venture consortium with lift manufacturer having similar experience and satisfactory execution and completion of work
3 documents required · 3 mandatory
₹1,000
DIRECTORATE OF LIGHTHOUSES AND LIGHTSHIPS
₹3.0 L
Chennai
24 Aug 2020
10 Mar 2020
30 Jun 2020
10 Mar 2020
29 Jun 2020
10 Mar 2020
22 Jun 2020
Amount
PART-A Design, Supply, Installation, Testing and Commissioning of 8 Passenger(544Kgs) Machine Roomless Elevator with Glass Cabin & SS Framed Glass Door, M.S Steel Structure, Glass Gladding
Design, Supply, Installation of One Number 8 Passenger MRL Lift with Glass Cabin and Framed Glass Door. Motor HP/KW 3.6 KW (Gear Less Machine) Drive Rating 5.5 KW Controller Type Full Collective Rope Steel Core,10 mm Travelling Cable Induction Prevented flat 24 core Guide rails 16 mm (imported) Rated Speed (m/s) 1.5 m/s. Total Number of Landings /Stoppings Ground & Terrace -3 Doors Total Travelling Range Up to 26 meters (approximate). Size of the Lift Well (mm) 2210 mm W X 2020 mm D Depth of the Lift Pit (mm) 1500 mm from Ground floor finish level Overhead Required (mm) 4200 mm H from Top floor finish level Lift Car Size (mm) 1300 mm W X 1100 mm Door Opening size (mm) 800 mm X 2000mmH Automatic Rescue Device: Yes, Battery powered ARD Function Lift car will reach the Nearest floor in case of Power Failure. Inclusive of provision for connecting platform at 1st, 2nd, & top Landing and also inclusive of all civil works required as per site condition and as per drawing
Supply, Fabrication ,Installation of MS Steel Structure(180X180X8)MM Thickness square tube with rust proof painting as per drawing and site conditions including supply of all materials, machineries, tools & plants, Designing, testing and submission of test report of structural connection like welding thickness and nut & bolt joints etc from authorised testing agency( The work should be fabricated registered proffessional fabricated company),transportation and all other charges etc complete
Toughened Saint Gopian Clear Air Proof Glass Gladding (12mm Thickness with Spider Fitting –Dorma Make and Saingobin Glass) as per drawing and site conditions including supply of all materials, machineries, tools & plants, transportation and all other charges etc complete
Pit Civil Work, Scaffolding, Minor Builder works, Water Proofing work, 3 Phase shaft electrical works & Bulk Head Fixing) as per drawing and site conditions including supply of all materials, machineries, tools & plants, transportation and all other charges etc complete
Construction of Lift pit inclusive of providing & laying PCC, RCC, steel & form work, Earthwork excavation, back filling. Also plastering the exposed surface, waterproofing & painting, making of 3nos lift door opening in existing LH tower including dismantling, repairing works, finishing works etc. Measurement shall be taken surface area (vertical) of lift wall outer to outer size 2.02m x 2.38m all as per drawing including cost of supply of all materials ,tools & plants, curring, scaffolding and all other charges etc complete
Steel scaffolding for structural work, glass fixing lift errectin work etc complete and de-errection of scaffolding after completing all works.
Shaft Electrical work, bulkhead fitting inside of lift. All electrical works incuding cable for lift operation etc complete.
PART-B Providing outside balcony for visitor at 26.3m height in Kanniyakuamri Lighthouse Tower.
Demolishing of R.C.C. work by mechanical means, stocking of serviceable materials at designated location,disposing of unserviceable materials away from site including cutting of steel reinforcement bars including cost of all labour, tools & plants, transportation charges etc complete.
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to nine story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin-charge . The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding for prepare of all mid balcony at 26.3m level.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved including cost of supply of all materials, labours, track hire charges, tools, ladders and all other charges etc. complete.
Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means without damaged adjacent structures including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge including cost of all labour, tools & plants etc complete.
Dismantling doors, windows and clerestory windows (steel or wood) shutter Of area beyond 3 sq. metres, including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead including cost of all labour, tools & plants, all other charges etc complete.
Providing and laying "1:2:4 (1 cement : 2 coarse sand (zone-III)/ M.sand : 4 graded stone aggregate 20 mm nominal size).in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level ,including cost of supply of all materials, labours, tools, ladders and all other charges etc. complete. For placing of concrete in holes of UCR masonry wall after position of structural member
Centering and shuttering including strutting, propping etc. and removal of form work as per drawing including cost of all labour, tools & plants, transportation charges etc complete.
Suspended floors, roofs, landings, balconies and access platform as per drawing
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) for outside balconies as per drawing including cost of supply of all labour, tools & plants, transportation charges etc complete.
Supply and Fabrication of Thermo-Mechanically Treated bars of grade Fe-500D Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. For cantilever balconies including cost of supply of all labour, tools & plants, transportation charges etc complete.
Providing and fixing 50 mm G.I. pipes hand rail of approved size by welding etc. of balcony railing and similar works, including applying priming coat of approved steel primer. including cost of supply of all labour, tools & plants, transportation charges etc complete.
Structural ISMB 250/ channels steel work riveted, bolting, welded with 12 mm thick stiffner plate, 20mm dia studs as per drawing enclosed , framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as per drawing
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to all height of tower in Cement mortar 1:3 (1 cement :3 coarse sand) simultaneously pointing and providing and placing in position 2 Nos 6mm dia. M.S. bars at every third course of half brick masonry. wherever required as directed including cost of all materials, labour, tools, scaffolding, curing,and all other charges etc complete.
Painting with synthetic enamel paint Two or more coats on new work of approved brand and manufacture to give an even shade for Handrailing
Chequerred precast cement concrete tiles 22 mm thick in footpath &courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand).
15 mm cement plaster in 1:3 (1 cement: 3 fine sand)on half brick wall finished with a floating coat of neat cement of mix iExtra for plastering exterior walls of height from GL to 30m height as per site condition
Providing and laying Polished Granite stone (Polished Granite stone slab jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent.) flooring in required design and patterns, in linear as well as curvilinear portions of the building, all complete as per the architectural drawings, with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand), laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade, including rubbing, curing and mirror polishing etc. all complete as specified and as directed by the Engineer-in-Charge. In Service room area of LH tower (lift entering area at 26.30m LVL).
Providing and dadoing granite stone, Mirror polishing on marble work/Granite work/stone work where ever required to give high gloss finish complete (Polished Granite stone slab jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent.) flooring in required design and patterns, in linear as well as curvilinear portions of the building, all complete as per the architectural drawings, with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand / Msand approved quality), laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade, including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge in Service room area of LH tower.
Providing edge moulding to 18 mm thick Granite work including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-Charge
Designing, fabricating, testing, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building , for all heights and all levels etc. including: add 10% cost for working in lighthouse tower @26.3 m. including af all charges in all heights of lighthouse tower. (a) Structural analysis & design and preparation of shop drawings for pressure equalisation or rain screen principle as required, proper drainage of water to make it watertight including checking of all the structural and functional design. (b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in pan shape in metalic colour of approved shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral core sandwiched between two Aluminium sheets (each 0.5mm thick) composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium itemsThe Contractor shall provide curtain wall with aluminium composite panel cladding, having all the performance characteristics all complete , as per the Architectural drawings, as per item description, as specified, as per the approvedshop drawings washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved. (c) The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and drawing The item includes cost of all material & labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium items The Contractor shall provide curtain wall with aluminium composite panel cladding, having all the performance characteristics all complete , as per the Architectural drawings, as per item description, as specified, as per the approvedshop drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places." For covering outside projected balconies structural members at 26.30m
Painting to lighthouse tower to the exterior on existing painted surface with 2 coats of Synthetic enamel paint of approved 1st quality (Berger/luxo) / (Asian/Apcolite) and colour in alternate band including applying of one coat of cement primer wherever required in Lighthouse tower at all height after scrapping and cleaning the worn out paint as and wherever directed, including supply of all materials, labours, tools, rope,cradle, ladders, etc. complete.
M/s-U. TECH SERVICE
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.12 MB
TDKanyakumariLift.pdf
Tender Documents • 0.56 MB
Knykliftdrawing.pdf
Additional Documents • 2.02 MB
BOQ_578061.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .