Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.9 LAccepted-Finance K K M TOWER KANDHIKUPPAM POST BARGUR TALUK KRISHNAGIRI DISTRICT 635 108 | KRISHNAGIRI | TAMIL NADU | 635108 | L1 | Accepted-Finance Admitted | |
| 2 | L2₹34.3 L+₹36,651.47 (1.08%)Accepted-Finance | L2 | Accepted-Finance Admitted | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Original END and Documents Not Submitted. |
Tender Value
₹35.4 L
EMD Value
₹36,000
Closing Date
18 Aug 2022, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri DT AGAMT II 2021-22 -Bargur Block- Strengthening of Bund, Weir Repair and Revetment Work at Palepalli and Belavarthy Panchayat 4 works TN04KRI-383
2022_RDTN_245488_1
RocNo_42_2022_R10_22_07_2022
Open Tender
Civil Works - Water Works
Item Rate
180 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹36,000
DRDA Krishnagiri
6 Sept 2022
4 Aug 2022
18 Aug 2022
4 Aug 2022
18 Aug 2022
4 Aug 2022
5 Aug 2022
Amount
1.Strengthening of Bund, weir repair, Revetment work and Diselting of Tank @ Elathagiri Pudu Eri MI tank - Rs. 7.00 Lakhs
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth up to 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Formation of Fore Shore bund by dumping the earth excavated soil after bund strengthening etc complete
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Provision For Weir Repair Work
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1 : 3 : 6 mix using 40mm ISS metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mmHBG Metal for Foundation including Watering wherever Necessary and laid layers of not more then 15 cm thick ., complacting etc., complete complying with Standard Specifications and as Directed
Provision For New Revetment
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1 : 3 : 6 mix using 40mm ISS metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Rough stone dry packing for aprons and revetments, including all cost amd conveyance of men and materials etc., all complete
Provision for Boundary stones
Provision for name Board
2.Strengthening of Bund, weir repair,Revetment work and Diselting of Existing Channel to Vengatabadhi Nayakan MI tank @ Veerabatran Ngar -Rs. 9.38 /- Lakhs
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth up to 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Formation of Fore Shore bund by dumping the earth excavated soil after bund strengthening etc complete
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Provision For Weir Repair Work
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1 : 3 : 6 mix using 40mm ISS metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mmHBG Metal for Foundation including Watering wherever Necessary and laid layers of not more then 15 cm thick ., complacting etc., complete complying with Standard Specifications and as Directed
Palstering with CM 1:5 20mm Thick Over The Cement Concrete for Floor Fininsh Including Curing etc., Complete Complying with Standard Specifications and as directed by the departmental Officers Rate for 10m2
Provision For New Revetment
Rough stone dry packing for aprons and revetments, including all cost amd conveyance of men and materials etc., all complete
Provision for Boundary stones
Provision for name Board
3.Strengthening of Bund, New weir, Revetment work and Diselting of Tank @ Chinna thimminayanapalli Eri MI tank- Rs. 9.85 /- Lakhs
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth up to 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Formation of Fore Shore bund by dumping the earth excavated soil after bund strengthening etc complete
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Provision For New Weir
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1 : 3 : 6 mix using 40mm ISS metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mmHBG Metal for Foundation including Watering wherever Necessary and laid layers of not more then 15 cm thick ., complacting etc., complete complying with Standard Specifications and as Directed
Provision For Weir Repair Work
Palstering with CM 1:5 20mm Thick Over The Cement Concrete for Floor Fininsh Including Curing etc., Complete Complying with Standard Specifications and as directed by the departmental Officers Rate for 10m2
Pointing the RR Masonry with CM 1:3 Mix including cost and Conveyance of All Materials to site all Labour charges etc., all Complete
Provision For New Revetment
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1 : 3 : 6 mix using 40mm ISS metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Rough stone dry packing for aprons and revetments, including all cost amd conveyance of men and materials etc., all complete
Provision for Boundary stones
Provision for name Board
4.Strengthening of Bund, weir repair, Revetment work and Diselting of Tank @ Valluvarpuram Buttan Eri MI tank Rs. 9.20 /- Lakhs
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth up to 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Formation of Fore Shore bund by dumping the earth excavated soil after bund strengthening etc complete
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Provision For Weir 1 Repair Work
Palstering with CM 1:5 20mm Thick Over The Cement Concrete for Floor Fininsh Including Curing etc., Complete Complying with Standard Specifications and as directed by the departmental Officers Rate for 10m2
Cement concrete 1 : 2 : 4 mix using 20mmHBG Metal for Foundation including Watering wherever Necessary and laid layers of not more then 15 cm thick ., complacting etc., complete complying with Standard Specifications and as Directed
Provision For Weir 2 Repair Work
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1 : 3 : 6 mix using 40mm ISS metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Palstering with CM 1:5 20mm Thick Over The Cement Concrete for Floor Fininsh Including Curing etc., Complete Complying with Standard Specifications and as directed by the departmental Officers Rate for 10m2
Cement concrete 1 : 2 : 4 mix using 20mmHBG Metal for Foundation including Watering wherever Necessary and laid layers of not more then 15 cm thick ., complacting etc., complete complying with Standard Specifications and as Directed
Provision For New Revetment
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cutoff Wall
Cement concrete 1 : 3 : 6 mix using 40mm ISS metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Rough stone dry packing for aprons and revetments, including all cost amd conveyance of men and materials etc., all complete
Provision for Boundary stones
Provision for name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sri Gowri Association
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .