| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹10.8 L+₹70,180 (6.97%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹11.1 L+₹1.1 L (10.7%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHARMA ELECTRIC WORKS L1 | M/S JITENDRA KUMAR L2 | P K ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00Cartage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). | ||||||
| 1.01 | PCC/ST poles 8.5/11 Mtr. | 218 | Nos. | 700 ₹1,52,600 Lowest | 800 ₹1,74,400 | 850 ₹1,85,300 |
| 2.00 | Cartage of line material viz Cable, Conductor/ GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps, cable, Stone pad & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective end, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). | 200 | Qtl. | 50 ₹10,000 Lowest | 60 ₹12,000 | 65 ₹13,000 |
| 3.00Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. | ||||||
| 3.01 | PCC/ST poles 8.5/11 Mtr. | 188 | Nos. | 800 ₹1,50,400 Lowest | 800 ₹1,50,400 Lowest | 850 ₹1,59,800 |
| 4.00Erection of double pole on following poles including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. | ||||||
| 4.01 | PCC/ST poles 8.5/11 Mtr. | 15 | Nos. | 2,400 ₹36,000 | 2,500 ₹37,500 | 2,200 ₹33,000 Lowest |
| 5.01 | (a) Erection & Grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work. | 158 | Nos. | 250 ₹39,500 Lowest | 260 ₹41,080 | 280 ₹44,240 |
| 5.02 | (b) Providing and fixing of stay insulator. | 6 | Nos. | 10 ₹60 Lowest | 11 ₹66 | 12 ₹72 |
| 6.00Laying, sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. | ||||||
Tender Value
₹9.9 L
EMD Value
₹10,000
Closing Date
26 Jul 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC-I ALIGARH
LAL DIGGI ALIGARH
Various work under deposit scheme and other related work against sanctioned packages in the jurisdiction of EDD-Talanagari, Aligarh.
2025_DVVNL_1058492_1
EDCA-15/2025-26
Open Tender
Electrical Works
Item Rate
15 days
EDD-TALANAGARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL WEBSITE
₹10,000
20 Aug 2025
19 Jul 2025
26 Jul 2025
19 Jul 2025
26 Jul 2025
19 Jul 2025
Amount
Cartage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
PCC/ST poles 8.5/11 Mtr.
Cartage of line material viz Cable, Conductor/ GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps, cable, Stone pad & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective end, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
PCC/ST poles 8.5/11 Mtr.
Erection of double pole on following poles including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
PCC/ST poles 8.5/11 Mtr.
(a) Erection & Grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work.
(b) Providing and fixing of stay insulator.
Laying, sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
ACSR Weasal Conductor.
ACSR Dog Conductor.
ABC Conductor 3x50+1x35+1x16 Sq.mm./3x95+1x70+1x16 Sq.mm./ 3x120+1x95+1x16 Sq.mm.
Grouting of PCC/ST poles 8.5/11 Mtr. Long as per RESPO norms
Making the plinth of Steel poles.
Drilling and cutting of tee off channel, V cross arms, Top channel, cross bracing angle, MS garding angle, Dropper chanel, Stone pad. as per specification of UPPCL construction manual including including loading and unloading at the both ends.
Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work.
Chopping of tree branches which are touching to HT/LT lines.
Providing & Fixing of Clamps of LT, Cross Arm Holding, F-Clamp, Stay Clamp, Danger board clamp with Nut & Bolts.
Carriage & Mounting from site to Store/store to site following capacity transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work.
10/16 KVA T/F
25 KVA T/F
63 KVA T/F
100 KVA T/F
250 KVA T/F
Safe carriage of LT distribution box (three phase) from store centre Sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESPO norms.
Safe carriage of 3x70/3x120/3X185/3x300 Sq.mm.33 KV/11 KV XLPE Cable from Store Center to respective site of work including loading & unloading at both ends for proper completion of work.
Laying of 3x70/3x120/3X185/3x300 Sq.mm.33 KV/11 KV under ground cable by straight through after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost.
Guarding of 11 KV Line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P etc. required for proper completion of work.
Carriage & Installation of 33KV/11 KV CT-PT Pole Mounted metering unit on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of size 1/8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 KV line shall be connected to unit as per instructions of SDO/AE(M). The M.S. Strip & earth rod shall be included in the scope of work.
Safe carriage & Installation of 33KV/11 KV pilfer proof metering cubicle from store centre, Sarsol to site of work.
Filling of 3x70/3x120 Sq.mm. 11 KV XLPE heat shrinkable cable jointing kits indoor & outdoor type including the cost of labour T&P carrier etc for proper completion of work.
Dismantling and removal of existing following material from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work.
CT-PT Pole Mounted metering unit
ACSR Weasal Conductor (Scrap)
T-off Channel with Clamp (Scrap)
V-type steel cross arm
Demounting & carriage of following capacity transformer due to damage of PCC/ST poles in storm including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work.
25 KVA T/F
63 KVA T/F
Body and neutral earthing of 100/250 KVA distribution Transformers installed by digging of pit up to water level depth (approx. 100’) and then inserting 1-1/4" dia G.I. pipe of "B" grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer including the cost of arrangement of all material, labourer, T&P, carrier etc. required for proper completion of work.
Construction of 100/250 KVA Transformers of Plinth of size 5’x5x4’ above ground level and one ft. below the ground level of 9”. After excavation of 4” earth, brick ballast shall be provided and rammering will be done properly after that a retaining wall of 9” width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. After this brick ballast shall be provided up to 6” from the earth level and proper rammering shall be done. One No. jall of 12 mm M.S. tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement, sand and stone ballast shall be laid on the top of the Plinth. The 12 mm thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervising Engineer. It including the cost of all material, labour T&P, carrier etc. required for proper completion of work.
FABRICATION & ERECTION OF FENCING AND CONSTRUCTION OF RETAINING WALL AROUND 100/250 KVA CAPACITY TRANSFORMERS. The complete 11/0.4 KV Substation shall be provided with two meter height fencing and retaining wall around the substation. One No. Gate with proper locking arrangement for entry of personnel shall also be provided. The fencing shall be made of 50x25 mm x10 SWG rectangular welded mesh of wire mesh in length. Wire mesh shall be fixed on panels made of 50x50x6 mm M.S. Angle. The wire mesh on panels will be supported by 25x3 mm M.S. flat on all the bracings diagonally and 50x6 M.S. Flat horizontally at the center of the panel. The panel will be joined by bolts & nuts of appropriate size with each other and on the main support on corners including supply of all material, labour, carrier and T & P etc. required for proper completion of work. The painting of complete fencing shall also be done with one coat of red oxide primer and two coat of synthetic green paint. For construction of retaining wall around the fencing, excavation of earth shall be done in foundation in ordinary soil including disposal of surplus earth at some suitable distance. The dimension of excavation shall be 1m wide, 0.45 m deep and suitable length as per wire mesh. After excavation of earth a cement concreted pad shall be laid in foundation. Concreting shall be done with Ist class brick ballast, coarse sand and cement in proportion of 8:4:1. First class brickwork shall also be done in foundation and super structure in 1:6 Cement and coarse sand including necessary cutting and moulding of bricks in foundation depth of wall 0.30 m, thickness of wall 0.35 m & superstructure brick work thickness of wall 0.23 m & depths 0.30 m including supply of all material, labour, carrier and T & P etc. required for proper completion of work.
M/S JITENDRA KUMAR (BID ID -5376905)
P K ENTERPRISES (BID ID -5376869)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .