Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC AT STATION ROAD PHUSRO DIST BOKARO | L1 | Accepted-AOC TECHNO COMMERCIALLY QULIFIED | |
| 2 | Rejected-Technical MAIN ROAD PHUSRO | - | Rejected-Technical DOCUMENTS NOT VERIFIED | |
| 3 | Rejected-Technical AT STATION ROAD PHUSRO NEAR RAILWAY STATION PO PHUSRO BAZAR DIST BOKARO 829144 | BOKARO | JHARKHAND | 829144 | - | Rejected-Technical DOCUMENTS NOT VERIFIED |
Tender Value
Refer Docs
EMD Value
₹2,050
Closing Date
16 Aug 2022, 12:00 pmClosed
AKHIL UJJWAL,PE (ENM),SDOCM
OFFICE OF THE PROJECT OFFICER.SDOCM,DHORI AREA
Making hose nipples repairing of valves for day to day requirement for water supply installed at Kalyani,Sharda colony andTuriyo in r/o SDOCM
2022_CCL_252788_5
SDOCM/PE(EnM)/etender/22-23/07 dt.07.08.2022
Open Tender
Miscellaneous Works
Item Wise
10 days
SDOCM
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,050
18 Oct 2022
8 Aug 2022
17 Aug 2022
8 Aug 2022
16 Aug 2022
8 Aug 2022
8 Aug 2022 - 16 Aug 2022
Amount
6” G. I. Pipe cutting by gas for making flexible hose nipple for suction.
6” G.I Pipe nipple new making for flexible hose by its 18” long X 1½” width gas cutting, pipe dia reducing by hydraulic press machine & after reducing re-jointing by inside & outside welding & steps making on lathe for tight fitting in flexible hose.
6” G. I flange full round welding in double layer inside & outside with nipple leakage proof.
6” Flexible hose clamp set new making with bending & both side drilling for bolting.
Clamp bolts new with nut and washer for hose tightening.
6” NRV complete dismantling, dhapa worn-out seat C.I welding, machining, centre pin & bush new making & fixing, bye pass pipe line new provide & fixing.
6” Sluice valve dismantling, spindle new making with check nut,“U” clamp new making, dhapa seat facing, re-assembling, new bolting.
6” foot valve dismantling, dhapa seating plate, dhapa plate, weight plate new making, lather new fixing, new bolting, assembling.
4” NRV complete dismantling, dhapa worn-out seat C.I welding, machining, centre pin & bush new making & fixing, bye pass pipe line new provide & fixing.
4” H.D Sluice valve dismantling, spindle new making with check nut, “U” clamp new making, dhapa seat facing, re-assembling, new bolting.
4” foot valve dismantling, dhapa seating plate, dhapa plate, weight plate new making, lather new fixing, new bolting, assembling.
3” H.D Sluice valve dismantling, spindle new making with check nut, “U” clamp new making, dhapa seat facing, re-assembling, new bolting.
Total impact of GST for the purpose of CTC
M/S SARVOTTAM SALES & SERVICES
TECHMECH ENGINEERING WORKS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .