SE Const Circle UPJN U Kanpur
SE Const Circle UPJN U Kanpur
Sewer Line Shifting work New Sewer Line laying and Jointing along Makdikhera Drain Kanpur as Deposit work Including Supply of all labour materials T and P etc Complete and Commissioning Testing Handing Over to Nagar Nigam
2026_UPJNM_1171252_1
808/W-1/305 Dated 17.07.2026
Open Tender
Civil Works
Percentage
90 days
Makdikheda
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
EE CD First UPJN U Kanpur
₹6 L
Yes
SE Const Circle UPJN U Kanpur
21 Jul 2026
21 Jul 2026
7 Aug 2026
21 Jul 2026
7 Aug 2026
21 Jul 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and erecting 2.00 meter high temporary barricading at site as per drawing /direction of Engineer-in-charge which includes writing and painting ,arrangement for traffic diversion such as traffic signals during construction at site for day and night ,glow lamps, reflective signs ,marking, flags, caution tape as direction by the Engineer-in-charge.The barricading provided shall be retained in position at site continously i/c shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion .Rate include its maintenance for damages, painting, all incidentals, labour material, equipment and works required to execute the job.The barricading shall not be removed without prior approval of Engineer-in-charge. | 150 | M | 161.2 | ₹24,180 |
| 2 | Dismantling/taking out existing cc interlocking paver blocks from footpath/central verge,including removal of rubbish etc. disposal of unservicable material to the dumping ground ,for which payment shall be made seperately and stacking of serviceable material with in 50 metres lead as per direction of Engineer -in-charge
(i) Interlocking Road | 194.98 | Sqm | 59.67 | ₹11,634.46 |
| 3 | Excavation for depth below G.L for laying sewer,manhole,gully pits,chamber,sump etc in ordinary soil (earth,sand,loam and clay) including cutting of joints pits,trimming,dressing,leveling,refilling of trenches in 20cm layers watering and ramming the same including removal of surplus earth or other dismantled material up to a distance of 50m from the centre of trenches
i) 0.00 to 1.5 m. BGL | 292.5 | Cum | 280.23 | ₹81,967.28 |
| 4 | ii) 1.5 to 3.0 m. BGL | 37.32 | Cum | 351.5 | ₹13,117.98 |
| 5 | Provision for 8 km extra trip for surplus earth disposal beyond 50 M lead | 248.68 | Cum | 244.67 | ₹60,844.54 |
| 6 | TIMBERING WORK
providing and fixing open timbering in trenches upto 3m depth consisting of 40mm thick approved country wood plank for poling board 125x75mm indian sal wood waler and 100mm diameter sal wood ballies for shuttering at 1.50m c/c including removal after laying of sewer(measurement to be taken of the face area timbered).
i) 0.0 to 3.0 m. BGL | 271.65 | sqm | 693.87 | ₹1,88,489.79 |
| 7 | Supply and carting of RCC NP-3 Pipe including all taxes, labour required, transportation, loading, unloading, stacking and fittings etc (including cost of laying,jointing,testing and commissioning).
200 mm dia | 150 | M | 647.66 | ₹97,149 |
| 8 | RCC works as per CPHEEO manual including supply of all materials, labour, shuttering for bedding, T&P etc. required for proper completion of the work in bedding & hauncing as per CPEEHO manual.
1.50-3.00 m BGL | 15.68 | Cum | 15,288.67 | ₹2,39,726.35 |
| 9 | Carting and laying of Following dia RCC NP-3 Pipe including supply of all materials, labour, T&P etc. required for the proper completion of work. (As per direction of Engineer -in-chage.)
200 mm dia -1.5 to 3.0 m. BGL | 150 | M | 578.98 | ₹86,847 |
| 10 | Supply and carting of M.S.Pipe with epoxy Coating including all taxes, labour required, transportation, loading, unloading, stacking and fittings etc (including cost of laying,jointing,testing and commissioning).
450 mm Dia | 345 | M | 16,865.63 | ₹58,18,642.35 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.46 MB
BOQ_2198590.xls
BOQ • 0.29 MB
tdmakdikheda.pdf
Tender Documents • 3.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].