Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.1 L+₹3,712.50 (0.61%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹6.1 L+₹7,447.50 (1.23%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹6.4 L+₹36,242.50 (5.98%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹6.5 L+₹43,378.50 (7.15%)Rejected-Finance NO 27 NATTAR STREET MURUNGAPAKKAM PUDUCHERRY 605 004 | PONDICHERRY | PUDUCHERRY | 605004 | L5 | Rejected-Finance L5 |
Tender Value
₹6.4 L
Closing Date
15 Nov 2021, 3:30 pmClosed
The Commissioner, Ariyankuppam Commune Panchayat
Ariyankuppam Commune Panchayat office, Cuddalore main road, Ariyankuppam
Reconstruction of the damaged U drain at Jeevarathinam street at Veerampattinam in Ariyankuppam Commune Panchayat
2021_DLA_8679_1
ACP/e-Tenders/05/2021-22
Open Tender
Civil Works
Item Rate
120 days
Veerampattinam
Refer tender notice and tender document
3 documents required · 3 mandatory
₹525
Exempted
4 Apr 2022
5 Nov 2021
15 Nov 2021
5 Nov 2021
15 Nov 2021
5 Nov 2021
Amount
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead - in cement mortar
Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50m - all kinds of soil
Providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering.- All work upto plinth level -1:5:10 (1 cement: 5coarse sand : 10 graded stone aggregate 40mm nominal size
Centring and shuttering including strutting , propping etc. and removal of form work for - foundations, footings, bases for columns
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size)
Brick work with common burnt clay F.P.S. (non modular ) bricks of class designation 7.5 in foundation and plinth in - cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix 1:4 (1 cement :4 course sand)
Centering and shuttering including strutting , propping etc and removal of form for - Suspended floors , roofs , landings , balconies and access platform
Reinforced cement concrete work in beams, suspended floors , roofs having slope up to 15degree landings , balconies , shelves , chajjas , lintels , bands , plain window sills , staircases and spiral stair cases upto floor five level excluing the cost of centering ,shuttering, finishing and reinforcement , with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size)
Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars (ISI BRAND OF APPROVED MAKE) Fe - 415 or more
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc .complete - 40mm thick with 20mm nominal size stone aggregate
MEGAVARNAN V
Prebagar
T.MOORTHY
N Vazhumuni
S Ilango
N Sakthivelu
V Madiajagane
V Azakesan
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_8885.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .