Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹75,264Admitted-Fee/PreQual/Technical/Finance | -23.20% | ₹75,264 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹76,734+₹1,470 (1.95%)Admitted-Fee/PreQual/Technical/Finance | -21.70% | ₹76,734+₹1,470 (1.95%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹98,000
EMD Value
₹2,940
Closing Date
27 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O RWALL FROM THE HO GULL MOHD MALIK ,NISAR AHMAD BHAT AT MALIKPORA CHITTERGUL
2026_RDPR_316703_2
ENIT68of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹2,940
28 Jul 2026
18 Jul 2026
28 Jul 2026
18 Jul 2026
27 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearence,Dewatering/diversion of nallah during exc. Of work labs | - | No | - | - |
| 2 | Earth work in excavation by manual in trenches for foundations, drains, pipes, cables etc. exceeding 30 cm in depth lift 1.5 mtrs i/c disposal of excavated earth upto 25 m beyond 1 mtr from cutting edge. | 1 | Cum | - | - |
| 3 | Providing and laying of stone soling tightly hand picked by tamping.incl. carriage by m.t lead 5 kms | 1 | Cum | 1 | ₹1 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | cum | - | - |
| 5 | 12mm Plaster with 1:6 mix mortar | 1 | sqm | 1 | ₹1 |
| 6 | P/F of Formwork incl. centering,shuttring , Struting,propping,and removal of Same etc- Complete Job | - | sqm | - | - |
| 7 | Carriage of sand/graded stone agg. By M.T lead 25 kms | 1 | Cum | 1 | ₹1 |
| 8 | Carriage cement s by M T.i/c loading unloading complete job. | - | trips | - | - |
| 9 | Add provision for PG/SB charges | - | LS | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1034453.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .