EXECUTIVE ENGINEER PHE GROUND WATER DIVISION SRINA
EXECUTIVE ENGINEER PHE GROUND WATER DIVISION SRINAGAR
Construction of Gravel Packed Production Tube Well at Malikpora Baramulla.
2021_PHE_113441_2
e-NIT No-PHE/GWDS 48 of 01/2021
Open Tender
Drilling Works
Item Rate
30 days
BARAMULLA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
EXECUTIVE ENGINEER PHE GROUND WATER DIVISION SRINA
Exempted
23 Feb 2021
15 Feb 2021
22 Feb 2021
15 Feb 2021
22 Feb 2021
15 Feb 2021
15 Feb 2021 - 21 Feb 2021
Amount
PART "A" Drilling/ boring of exploratory test bore well at mentioned site for construction of production tube wells. The job shall be inclusive of all logistic support in terms of men, machinery and stores at site. Job includes providing, fitting & lowering of 125 mm Dia Heavy Duty MS Pipe as casing of minimum thickness 5.4 mm for the well. The charges on account of loading/ unloading, shifting of men & machinery shall be arranged by the firm. The strata sampling is to be carried out along with drilling and the samples collected in the transparent plastic boxes duly labeled. The exploratory bore has to be cased simultaneously vide drilling in case of ODEX drilling or cased at the completion of drilling in open drilling. Sample collection of strata to be collected for examination. After every 10 ft. The specifications of the bore well shall be as under; i. Max depth of the bore ……. 150 M ii. Acceptable Make of Pipe …… Jindal/Prakash Surya or Equivalent make Class of pipe …. C class conforming to IS:1239 (Part Ist ) 2004,equivalent to BS -1387/1985. Acceptable make for Pipe….. Jindal /Prakash-Surya /TATA The inspection at every stage shall be carried out by departmental experts to determine the aquifer zones. The construction of Production well shall be decided after analyzing the litho-logy of the test bore. This shall be duly authenticated by the Site engineers/ drilling staff including the contracting agency as well. The decision for construction of full-fledged production Bore hole shall be then taken with proper ascertaining of quality and quantity of water. Note: The pipe has to be provided by the firm and the rates quoted are inclusive of p/f of pipes
Description of Work / Item(s)
Amount
PART "B" (GRAVEL PACKED) Artificial Gravel Packed Production Well: Construction of production well based on results of exploration data by a suitable method of drilling viz Direct circulation method / Reverse circulation method up to the desired depth as per the relevant IS codes of practice for construction and testing of tube wells / Bore wells, with time to time amendments in all kinds of soils , Boulders , Rocks , Collapsible strata , saturated soils etc with the requisite accessories required there of including Bentonite mud , foam , water Lubricants etc. The drilled bore hole is reamed up for open drilling and completed to the desired depth. Dia of Well …….. ≥ 500/550 mm
Lowering of Heavy duty MS Casing pipe confirming to Relevant IS Codes with time to time amendments and the slotted / strainer pipes also confirming to Relevant IS Codes at the site of well Construction of well. The welding electrodes used for welding the casing pipes together are super bond / Esab /L&T only. The jigs and fixtures for lowering the casing pipe are provided by the firm. Min dia of Casing Pipe……..250 mm dia (for GRAVEL PACKED) The material MS Pipe shall be provided by the department
The annular space between the casing pipe and the well surface has to be filled with a gravel pack to act as a filter medium. The gravel pack used as pack in tube well is specified in Relevant IS Codes. (Quantity shall be subject to the actual measurements at site)
The well is to be developed using compressed air from an Air Compressor of adequate capacity and pressure rating. As the water becomes clear, surging or backwashing is done to make the development more perfect. The final discharge should be free from sand. The physic-chemical analysis of water sample tested has to be as per the specified IS Codes. After completion of development the well is tested for its performance that is yield characteristics and efficiency. The water has to be disinfected after completion of test for yield to ensure that the quality of water and as laid down as per specified IS Standards. The grouting and sealing of tube well has to be done to ensure safe sanitary conditions. An apron around the well (mix of M 10 grade) and slopping away from it to protect the well from pollution to be constructed to prevent contaminated water flowing back into it. The casing pipe has to be anchored within the apron by welding ISMC 150 steel bracing with cleats and sufficient welding area 2 meters length each bracing embedded within the apron (4 bracings). The complete well thus completed handed over to the territorial Mechanical Division for harnessing. The job includes P/F of bail plug as per site requirements. Technical Specifications: Minimum Run for compressor……40 Hrs. Yield Test for water (till desired Results)….. Min 30 Hrs. i. Apron Size = 2.5 mtr × 2.5 mtr. ii. Apron depth at skirt = 300 mm. iii. Apron depth at well casing = 350 mm.
M/S SHAKEEL UR REHMAN
M/S SHAKEEL UR REHMAN
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .