Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-Finance 00 BHADAR TIKARMAFI BAZAR SULTANPUR UTTAR PRADESH 227413 | AMETHI | UTTAR PRADESH | 227413 | ₹2.5 L | L1 | Accepted-Finance Qualified AOC |
| 2 | L2₹2.7 LRejected-Finance | ₹2.7 L | L2 | Rejected-Finance Not Qualified AOC |
Tender Value
₹3.4 L
EMD Value
₹34,000
Closing Date
11 May 2026, 12:00 pmClosed
Executive Engineer
EE PD GHAZIPUR
Renovation Work of the Guard Room located in revenue house number A03 Gorabazar Colony
2026_CEUVZ_1145060_3
1673/10 Lekha dt. 20.04.2026
Open Tender
Civil Works
3 days
Ghazipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹767
₹34,000
Yes
25 Jun 2026
4 May 2026
11 May 2026
4 May 2026
11 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Asbestos Cement sheet roofing including ridges, hips, valleys and gutters etc. and stacking the material within 50 metres lead (Including all materials, T&P and labour cess etc. But excluding GST) | 18 | Cum | 53 | ₹954 |
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In lime mortar with old mughal bricks (Including all materials, T&P and labour cess etc. But excluding GST) | 3 | Cum | 1,425 | ₹4,275 | |
Reinforced cement concrete work in beams, suspended floors, roofshaving slope up to 15° landings, balconies, shelves, chajjas, lintels,bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering,finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)(Including all materials, T&P and labour cess etc. But excluding GST) | 5.4 | Cum | 7,933 | ₹42,838.2 | |
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers (Including all materials, T&P and labour cess etc. But excluding GST) | 19.5 | Sqm | 499 | ₹9,730.5 | |
Centering and shuttering including strutting, propping etc. and removal of for Suspended floors, roofs, landings, balconies and access platform with water proof ply 12 mm thick (Including all materials, T&P and labour cess etc. But excluding GST) | 22.5 | Sqm | 703 | ₹15,817.5 | |
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. (Including all materials, T&P and labour cess etc. But excluding GST) | 550 | Kg | 71 | ₹39,050 | |
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (Including all materials, T&P and labour cess etc. But excluding GST) | 0.95 | Cum | 4,893 | ₹4,648.35 | |
Brick work with common burnt clay machine moulded perforated bricks of class designation 12.5 conforming to IS: 2222 in superstructure above plinth level up to floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) With F.P.S.(non modular) bricks (Including all materials, T&P and labour cess etc. But excluding GST) | 8.35 | Cum | 6,413 | ₹53,548.55 | |
Providing and fixing M.S. grills of required pattern in frames of windowsetc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete Fixed to steel windows by welding. (Including all materials, T&P and labour cess etc. But excluding GST) | 70 | Kg | 147 | ₹10,290 | |
12 mm cement plaster of mix 1:6 (1 cement: 6 fine sand ) (Including all materials, T&P and labour cess etc. But excluding GST) | 70 | Sqm | 228 | ₹15,960 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.95 MB
T1.pdf
Tender Documents • 0.32 MB
BOQ_2140109.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid