| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 LAccepted-Finance | ₹5.0 L | 1 | Accepted-Finance Lowest Amount Quoted |
| 2 | 2₹5.2 LRejected-Finance | ₹5.2 L | 2 | Rejected-Finance QUOTED AMOUNT ABOVE THE TENDER |
| Sl No | Description | Qty | Unit | A MURUGAN L1 | MR.V.GANESAN, CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete | 18.95 | m3 | 263 ₹4,983.85 | 300 ₹5,685 |
| 2.00 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 9.02 | m3 | 5,644 ₹50,908.88 | 5,650 ₹50,963 |
| 3.00 | Refilling with excavated earth as per standard specifications etc complete | 12.15 | m3 | 45 ₹546.75 | 50 ₹607.50 |
| 4.00 | Random rubble masonry in Cement mortar 1 : 5 mix using new rough stones with symultaneous pointing including cost and conveyance of all materials to site and labour charges etc complete. | 21.06 | m3 | 6,037 ₹1.3 L | 6,050 ₹1.3 L |
| 5.00 | Brick work in cement Mortor 1:5 (One cement and five sand) using second class Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete. | 9.13 | m3 | 6,138 ₹56,039.94 | 6,150 ₹56,149.50 |
| 6.00 | Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations g | 33.55 | m2 | 1,095 ₹36,737.25 | 1,100 ₹36,905 |
| 7.00 | R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete | 9.8 | m3 | 9,255 ₹90,699 | 9,300 ₹91,140 |
| 8.00 | Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS ro | 400 | Kg | 91.8 ₹36,720 | 100 ₹40,000 |
| 9.00 | Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete. | 61.88 | m2 | 285 ₹17,635.80 | 300 ₹18,564 |
| 10.00 | Painting two coats with Plastic Emulsion Paint over new plastered including cost and conveyance of all materials to site and all labour charges etc comoplete | 40.15 | m2 | 262 ₹10,519.30 | 300 ₹12,045 |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
25 Feb 2026, 4:00 pmClosed
BDO(VPT) Ambasamudram Panchayat union
BDO(VPT) Ambasamudram Panchayat union
Construction of GLR at Mela Street in Vagaikulam Panchayat in Ambasamudram Panchayat Union
2026_RDTN_660712_34
B3/10/2026
Open Tender
Civil Works
Ambasamudram Panchayat union
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,000
Yes
26 Feb 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Refilling with excavated earth as per standard specifications etc complete
Random rubble masonry in Cement mortar 1 : 5 mix using new rough stones with symultaneous pointing including cost and conveyance of all materials to site and labour charges etc complete.
Brick work in cement Mortor 1:5 (One cement and five sand) using second class Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete.
Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations g
R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS ro
Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Painting two coats with Plastic Emulsion Paint over new plastered including cost and conveyance of all materials to site and all labour charges etc comoplete
Earth Work Excavation in all Classes of Soil For Pipeline including all cost and Conveyance etc Complete
Supply and Delivery of 75mm 4KSC PVC Pipe including all cost and Conveyance etc Complete
Laying and Jointing of PVC Pipe including all cost and Conveyance etc Complete
Refilling Charges including all cost and Conveyance etc Complete
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_794994.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.39 MB
BOQ_794994.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid