| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹46.2 LAccepted-AOC | 1 | Accepted-AOC being lowest and reasonable | |
| 2 | 2₹47.0 L+₹31,108 (0.67%)Rejected-Finance PLOT NO 28 SANTOSHIMA COLONY WEST MARREDPALLY SECUNDERABAD 500026 | HYDERABAD | TELANGANA | 500026 | 2 | Rejected-Finance Not being the lowest bidder | |
| 3 | 3₹49.1 L+₹2.4 L (5.13%)Rejected-Finance | 3 | Rejected-Finance Not being the lowest bidder | |
| 4 | 4₹49.5 L+₹2.9 L (6.12%)Rejected-Finance | 4 | Rejected-Finance Not being the lowest bidder | |
| 5 | 5₹49.7 L+₹3.1 L (6.60%)Rejected-Finance | 5 | Rejected-Finance Not being the lowest bidder |
Tender Value
₹47 L
EMD Value
₹94,000
Closing Date
24 Jul 2023, 6:00 pmClosed
GE(I) R AND D RCI, HYDERABAD
GE(I) RND RCI, MILITARY ENGINEER SERVICES, VIGNYANAKANCHA, RCI, HYDERABAD
REPAIR MAINTENANCE OF RECIPROCATING AND OPEN TYPE COMPRESSORS, CONDENSERS AND CHILLERS, CONNECTED PIPE AND PUMPS AT RCI UNDER GE I RND RCI HYDERABAD
2023_MES_604678_1
8852
Open Tender
Electrical and Maintenance Works
Item Rate
210 days
GE(I) R AND D RCI
MES enlisted Class D category c i and Un enlisted Meeting enlistment criteria of D class in MES and having no recovery pending. For further details ref NIT
8 documents required · 8 mandatory
₹500
Yes
GE(I) R AND D RCI, HYDERABAD
₹94,000
Yes
1 Sept 2023
21 Jun 2023
26 Jul 2023
21 Jun 2023
24 Jul 2023
5 Jul 2023
Amount
Disconnect and remove the un-serviceble micro process based control panel of chiller package AC plant MAKE BLUE STAR / voltas / Carrier / dhanbush of various capacities and remove the unserviceble PCB and supply and fix new PCB to micro process based control panel and refixing to chiller package and programing to the entire panel to run the smooth functioning, testing complete all as directed (work should be carried out through OEM)
Disconnection of existing module adaptive control clear language display keyboard, supply and fixing with testing new of module adaptive control clear language display keyboard of TRANE R series chiller at EHSV/MEMS plants. Works will be executed through OEM of make Trane ( Note : It is deemed to be understood contractor has visited the site before quoting the rate.)
Leak testing of the system with nitrogen (N2) pressure after evacuating of the existing gas from the system in to empty cylinder by separating the entire system like compressors, condensers, cooling coil and refrigerant lines and rectifying of the leakage including cutting welding, brazing etc and reconnecting with ‘O’ rings, washers, gaskets etc flushing out the Nitrogen and vaccumising, recharging the taken out refrigerant gas complete all as directed to AC plant of various capacity AC plant.
Descaling of condenser of various capacity by circulating descaling agent (HCL) through condensers by forced feed method removing the end covers of the condensers, cleaning the each tube of condenser thoroughly by brushing fixing back the end covers of the rubber gasket, nuts bolts, washers and testing complete all as directed.
Disconnecting and isolating the compressor of YORK and bluestat make and following model No JS-44FN50B of 60TR from the system by placing dummy plates to suction and discharge valves opening the compressor removing all internal parts cleaning of all parts thoroughly, overhauling of compressers, supply and replacing the worn out parts viz piston pins, lock rings, piston rings, oil rings, DV/SV springs, DV washers, DV lock plates valve lifter spring, Nylon nuts, gasket sets etc with new ones and refixing/reassembling the compressor unit, oil charging, testing for oil pressure removing the dummy plates leak testing of the compressor and testing the compressor complete all as directed by Engineer-in-Charge
Disconnecting & isolating the compressor of YORK make and model JS 84F-T50B of 120TR from the system,at CSL AC plant evacuation of gas flushing out the system with Nitrogen, separating suction, discharge, liquid lines opening the compressor removing all internal parts & cleaning thoroughly with soap solution replacing the worn out parts viz piston pins, lock rings, piston rings, oil rings, DV/SV springs, DV washers, DV lock plates valve lifter spring, Nylon nuts, gasket sets etc with new ones and reassembling the compressor unit, checking of electrical and electronic controls, set points and adjust to the facory levels gas/ oil charging, testing for oil pressure leak testing of the compressor and testing the compressor complete all as directed.
Disconnecting and isolating the compressor of the Kirloskar make and model No MCQUAY-904 Screw sealed of 50 TR capacity from the system by placing dummy plates to suction and discharge valves opening the compressor removing all the internal parts, cleaning of all parts thoroughly supply and replacing the worn out parts of piston pins, lock rings, piston rings, oil rings, DV/SV springs, DV washers, DV lock plates valve lifter spring, Nylon nuts, gasket sets etc with new ones and refixing/reassembling the compressor unit, oil charging, testing for oil pressure removing the dummy plates leak testing of the compressor and testing the compressor complete all as directed by Engineer-in-Charge
Disconnecting and isolating the compressor of the Blue star/YORK make and model JS43F-N50B, of 50 TR capacity from the system by placing dummy plates to suction and discharge valves opening the compressor removing all internal parts cleaning of all parts thoroughly supply and replacing the worn out parts of piston pins, lock rings, piston rings, oil rings, DV/SV springs, DV washers, DV lock plates valve lifter spring, Nylon nuts, gasket sets etc with new ones and refixing/reassembling the compressor unit, oil charging, testing for oil pressure removing the dummy plates leak testing of the compressor and testing the compressor complete to the entire satisfaction all as directed by Engineer-in-Charge. NOTES for ser item No 9 to 12: Repalced parts will be measured and paid for separately as supply only and labour elements for fixing the same is deemed to be included in the unit rate quoted. 2. All consumable items like cleaning oil, grease and tools for testing are to be provided by the tenderer and cost of the same shall be deemed to be included in in the quoted rates 3 :works shall be executed through Rep of OEM and authorities letter of OEM shall be produced by the contractor to this effect before commencement of works. Supply and charging of oil & Refrigerant gas will be measured and paid for seperately under relevant items.
Rewinding, varnishing, insulation, ovening, greasing of compressor motor suitable for model DXS24LA-A46/50/MCQUAY /JS43F-N50B JS 94 of 120TR Compressor of AC plants 50/60/120 TR capacity all as directed
Remetling grinding, polishing of crank shaft model DXS24LA-A46/50/MCQUAY /JS43F-N50B JS 94 of 120TR Compressor of AC plants 50/60/120 TR capacity all as directed
Supply only gasket set for compressor of Models/makes :- (A) YORK Make : DXS24LA-A46/50 (B) Kirloskar make MCQUAY /JS43F-N50B
All as per item No. 11 above but Piston
All as per item No. 11 above but Suction valve assembly
All as per item No. 11 above but Discharge valve assembly
All as per item No. 11 above but Connecting rod assembly
All as per item No. 11 above but Bearings
All as per item No. 11 above but Piston rings
All as per item No. 11 above but Thrust washer
All as per item No. 11 above but Discharge reeds
All as per item No. 11 above but Suction reeds
All as per item No. 11 above but Spring set suction
All as per item No. 11 above but Spring set discharge
All as per item No. 11 above but Cylinder sleeve
All as per item No. 11 above but Unloader assembly
All as per item No. 11 above but Pin lift unloader
All as per item No. 11 above but Springs for pin lift unloder
All as per item No. 11 above but Springs retainer clips for lift unloader
All as per item No. 11 above but Oil pump
Disconnecting and isolating the screw compressors (model AFHX85, 30GX 180,30GX-092/ 37.50/ 47.50TR/75TR capacity) electrically and mechanically from the system after pumping down the system, opening othe end cover gear system, checking of the high speed gears, low speed gears, male & female rotors( asymetric rotor), bearings, overhauling of the same, replacing of the wornout, unserviceable spares like trust anchor, roller, tapers, Gasket set etc with new ones, reassembling, refixing back to the system, flushing of the system with dry nitrogen (N2), charging of the oil checking of the oil pressure, leak testing and gas charging complete all as directed. Note : ( a) Supply and charging of compressor oil and Refrigerna gas will be measured and paid for separately. (b) Spares replaced will be measured and paid for separately as supply only. Labour elements for fixing of spares shall be deemed to be included in the unit rate quoted.
All as per item No.29 above but screw compressors of make TRANE ( Model DXS 24 LA/DXS 36LA/RTAA 100K-YQ01A0COB/ RTAA 125K-YR01A0COB of 50/75/80 TR capacity)
Suply only Thrust taper bearings of screw comprssor YORK make of (Model AFHX85, DXS 24LA/DXS 36LA/30GX/60GX :-
All as per item No. 31 above but Rotor bearing
All as per item No. 31 above but Screw balance bearing
All as per item No. 31 above but Slide valve bearing
All as per item No. 31 above but Gasket set
Disconnecting and opening of screw compressor of any make and model after pumping down of the system, varnishing for improvement of insulation resistance inspecting of the cables of the motor end and control panel end of the terminations of the screw compressor (Heli rotor), Inspecting of the conductor, cutting and removing of the burntout end portions, reterminating, rewinding of compressor motors as required, connecting back of the compressor motor connections at both ends of TRANE, YORK, Dunham bush, Carrier series of capacity 37.TR to 80 TR all as directed.
Supply and filling synthetic oil RL 220. Make : RL
Draining out the old existing used compressor oil from the various compressor and supply and Charging of compressor oil of make York C oil complete all as directed by Engineer-in-charge.
Supply and filling compressor oil DB 18/SG 160Z all as directed.
Supply and filling compressor frezol 68 all as directed.
Supply and filling charging any type of Refrigerant gas R-22 /134A/407 C all as directed.
Disconnecting of unserviceable water pressure cut out, IPS-70 and supply and fix new water pressure cut out IPS-70 all as directed. Make : Indofoss/Donfoss
Disconnecting and removing of unserviceable leaking condenser safety valve after making system pumping down and supply and fix new condenser safety valve 0 to 300/0 to 400 PSI all as directed. Make : HENRY/BAP/CASTLE
Disconnecting and removing of unserviceable snap activiation switch from the chiller and supply and fix new snap activiation switch 0.10 to 1 Kg/Cm2 pressure all as directed. Make :- Indofoss/Donfoss
Disconnecting and removing of unserviceable damaged loading unloading coil from the existing position after making system pumping down and supply and fix new loading unloading coil of the compressors of 25 TR to 50 TR capacity complete all as directed. Make : Donfoss or Equivalent in Sahalan
Disconnecting and removing of unserviceable loading unloading coil from the existing position after making system pumping down and supply and fix new loading unloading coil of the compressors of above 50TR to 120 TR complete all as directed. Make : Donfoss or Equivalent in Sahalan
Disconnecting and removing of unserviceable loading unloading coil from the existing position after making system pumping down and supply and fix new loading unloading coil of the compressors of model AKS32R all as directed. Make : Donfoss or Equivalent in Sahalan
Disconnecting and removing of unserviceable damaged loading unloading coil from the existing position after making system pumping down and supply and fix new loading unloading coil of the compressors of model NM 22-021 all as directed. Make : PARKER or Equivalent in in Donfoss
Disconnecting and removing of unserviceable crank case heater and supply and fix nex crank case heater fix of York/screw of compressers.
Disconnecting and removing of unserviceable flow switch from the system and supply and fix new flow switch model M9109-GGA-4 all as directed Make : Johnson Controls/Rapid controls/Penn
Disconnecting and removing of chilled water sensor from the existing positon and supply and fix new chilled water sensor for Trane series, Dhan bush, carrier,York,MCQUAY chillers all as directed. Make : Danfoss/ALERTON
Disconnecting of the unserviceable low pressure cut out, supply and fixing new low pressure cut out MP1 all as directed Make : Indofoss/Danfoss/YORK
All as per item No 52 but high pressure cutout MP-5
All as per item No 52 but high pressure cutout MP-15
All as per item No 52 but high pressure cutout MP-55
All as per item No 52 but water pressure cut out IP-70
Disconnection and removing of the unserviceable checked CATCH-ALL drier filter pumping down the system, supply and replacing with new CATCH-ALL drier filter or liquid line filter/ strainer model of suitable model and make of AC plants.
Disconnecting and removing of the unserviceable pressure gauge of any rating 0 to 150/0 to 300 PSI or equivalent in Kgs/Cm2, supply and fixing new pressure gauges all as directed. Make : Fiebig/H-Guru/KI
Disconnecting and removing of the unserviceable electronic expansion valve after pumping down the system,supply and fixing new electronic expansion valve any model of AC plants all as directed. Make : Danfoss/indofass
Opening of the screws, covers of the aircooled condensing units, Descaling of the aircooled condensing units to bring down the high pressure, Cleaning of the dust particles formed on the coil system with diluted 'ASFOCLEAN' chemical, Costic Soda by pouring on the coil with leg pump or mechanical system till the clearing of the dust on the coil as primary wash and detergent powder or surf water as final wash and testing complete from capacity 10 TR to 35 TR condensing units all as specified and directed.
Opening of the screws, covers of the aircooled condensing units, Descaling of the aircooled condensing units to bring down the high pressure, Cleaning of the dust particles formed on the coil system with diluted 'ASFOCLEAN' chemical, Costic Soda by pouring on the coil with leg pump or mechanical system till the clearing of the dust on the coil as primary wash and detergent powder or surf water as final wash and testing complete from capacity 45 / 48 TR condensing units all as specified and directed.
Opening of the screws, covers of the aircooled condensing units, Descaling of the aircooled condensing units to bring down the high pressure, Cleaning of the dust particles formed on the coil system with diluted 'ASFOCLEAN' chemical, Costic Soda by pouring on the coil with leg pump or mechanical system till the clearing of the dust on the coil as primary wash and detergent powder or surf water as final wash and testing complete from capacity 65 / 66 TR condensing units all as specified and directed.
Opening of the screws, covers of the aircooled condensing units, Descaling of the aircooled condensing units to bring down the high pressure, Cleaning of the dust particles formed on the coil system with diluted 'ASFOCLEAN' chemical, Costic Soda by pouring on the coil with leg pump or mechanical system till the clearing of the dust on the coil as primary wash and detergent powder or surf water as final wash and testing complete from capacity 75 TR condensing units all as specified and directed.
Opening of the screws, covers of the aircooled condensing units, Descaling of the aircooled condensing units to bring down the high pressure, Cleaning of the dust particles formed on the coil system with diluted 'ASFOCLEAN' chemical, Costic Soda by pouring on the coil with leg pump or mechanical system till the clearing of the dust on the coil as primary wash and detergent powder or surf water as final wash and testing complete from capacity 90 TR condensing units all as specified and directed.
Opening of the screws, covers of the aircooled condensing units, Descaling of the aircooled condensing units to bring down the high pressure, Cleaning of the dust particle formed on the coil system with diluted 'ASFOCLEAN' chemical, Costic Soda by pouring on the coil with leg pump or mechanical system till the clearing of the dust on the coil as primary wash and detergent powder or surf water as final wash and testing complete from capacity 100 to 160 TR condensing units all as specified and directed.
Opening of the condensing unit system by removing the covers nuts, bolts, opening of the fan system, servicing to the fan motors, cleaning of the blades, shafts, lubricating to the motors 1 to 2HP capacity, greesing to the bearing, checking of the electrical control system, wiring, switches, relays, contractors, tightening of the losse contacts, rectifying of the defects, faults, refixing of the fan motors with blades in the original position, reconnecting, fixing of the covers all as specified and directed of capacity 2 Nos fan motors of 5.5 TR (11 TR) capacity.
Opening of the condensing unit system by removing the covers nuts, bolts, opening of the fan system, servicing to the fan motors, cleaning of the blades, shafts, lubricating to the motors 1 to 2HP capacity, greesing to the bearing, checking of the electrical control system, wiring, switches, relays, contractors, tightening of the losse contacts, rectifying of the defects, faults, refixing of the fan motors with blades in the original position, reconnecting, fixing of the covers all as specified and directed of capacity 2 Nos fan motors of 17.5 TR (35 TR) capacity.
Opening of the condensing unit system by removing the covers nuts, bolts, opening of the fan system, servicing to the fan motors, cleaning of the blades, shafts, lubricating to the motors 1 to 2HP capacity, greesing to the bearing, checking of the electrical control system, wiring, switches, relays, contractors, tightening of the losse contacts, rectifying of the defects, faults, refixing of the fan motors with blades in the original position, reconnecting, fixing of the covers all as specified and directed of capacity 4 Nos fan motors of 12 TR (48 TR) capacity.
Opening of the condensing unit system by removing the covers nuts, bolts, opening of the fan system, servicing to the fan motors, cleaning of the blades, shafts, lubricating to the motors 1 to 2HP capacity, greesing to the bearing, checking of the electrical control system, wiring, switches, relays, contractors, tightening of the losse contacts, rectifying of the defects, faults, refixing of the fan motors with blades in the original position, reconnecting, fixing of the covers all as specified and directed of capacity 6 Nos fan motors of 11 TR (65/66 TR) capacity.
Opening of the condensing unit system by removing the covers nuts, bolts, opening of the fan system, servicing to the fan motors, cleaning of the blades, shafts, lubricating to the motors 1 to 2HP capacity, greesing to the bearing, checking of the electrical control system, wiring, switches, relays, contractors, tightening of the losse contacts, rectifying of the defects, faults, refixing of the fan motors with blades in the original position, reconnecting, fixing of the covers all as specified and directed of capacity 4 Nos fan motors of 19 TR (75/76 TR) capacity.
Opening of the condensing unit system by removing the covers nuts, bolts, opening of the fan system, servicing to the fan motors, cleaning of the blades, shafts, lubricating to the motors 1 to 2HP capacity, greesing to the bearing, checking of the electrical control system, wiring, switches, relays, contractors, tightening of the losse contacts, rectifying of the defects, faults, refixing of the fan motors with blades in the original position, reconnecting, fixing of the covers all as specified and directed of capacity 6 Nos fan motors of 16 TR (95/96 TR) capacity.
Opening of the condensing unit system by removing the covers nuts, bolts, opening of the fan system, servicing to the fan motors, cleaning of the blades, shafts, lubricating to the motors 1 to 2HP capacity, greesing to the bearing, checking of the electrical control system, wiring, switches, relays, contractors, tightening of the losse contacts, rectifying of the defects, faults, refixing of the fan motors with blades in the original position, reconnecting, fixing of the covers all as specified and directed of capacity 8 Nos fan motors of 20 TR (160 TR) capacity.
Opening of the condensing unit system of any capacity by removing the covers nuts, bolts, opening of the unserviceable fan motors 1 to 2 HP capacity, transporting to work shop, cutting and removing of the burnt out winding conductors, rewinding of the same with same size and gauges of super enamelled copper conducotr, insulating, varnishing, greasing, bringing back to site, refixing back in the original position, reconnecting back and testing complete all as directed
Opening of the condensing unit system of any capacity by removing of the covers nuts, bolts, opening of the fan motor system, removing of the unserviceable, wornout, jammed bearing, supply and replacing of the new bearing refixing back, reconnecting back and testing complete all as directed.
Disconnecting and removing of the unserviceable 3 pole power contractor CLO2, from the existing position, supply and fixing new CLO2, 25 Amps power contactor and testing complete all as directed . Make:- GE or Equivalent in SIEMENS
Disconnecting and removing of the unserviceable 3 pole power contractor SCO3 (II), from the existing position, supply and fixing new SCO3 (II) , 20 Amps power contactor and testing complete all as directed . Make:- Fuji electronics or Equivalent in GE
Disconnecting and removing of the unserviceable 3 pole power contractor 10E, 3RT1015-1A BOI, from the existing position, supply and fixing new 10E, 3RT1015-1A BOI, 25 Amps power contactor and testing complete all as directed. Make:- Siemens or Equivalent in GE
Disconnecting and removing of the unserviceable 3 pole power contractor C25 DND 30, from the existing position, supply and fixing new C25 DND 30, 30 Amps power contactor and testing complete all as directed Make:- BCH or Equivalent in L&T
Disconnecting and removing of the unserviceable 3 pole power contractor CM15DN3, from the existing position, supply and fixing new CM15DN3, 27 Amps power contactor and testing complete all as directed . Make:- BCH or Equivalent in L&T
Disconnecting and removing of the unserviceable 3 pole power contractor 10E3RT1015- 1A BOI, from the existing position, supply and fixing new 10E3RT1015- 1A BOI, 25 Amps power contactor and testing complete all as directed . Make:- Siemens or Equivalent in GE
Disconnecting and removing of the unserviceable fused dual element time delay fuse, supply and fixing new dual element time delay fuse unit TR S30R, 30 Amps, 600v AC, 330V DC all as directed Make : FERRAZ SHAWN / FUSETRON
Removing unserveaceble blade of any size, sweep and any size of shaft ( as per existing ) make Voltas, blue star , carrier ,train, York , Dhunham bush etc and supply ,fixing and testing of blade of conderser fan of any capacity of air cooled chiller units as specified and directed of Engr in charge ( fan blade required as per recommendation of OEM / authorised responsible person of OEM and certificate will be produced of OEM )
Disconnecting and removing of unserviceble condesing motor both mechanically and electrically and Supply and fix with modification alongwith required contactors and auxilliary contactor of condensing motor unit motor capacity above 2 HP up to 3 HP, 440 volts with existing / new blades and bracket etc as specified and directed Engineer in charge
Supply and fix dial type temperature gauge range ( 0 to 100 ) degree centigrade .
Disconnecting and removing of the unserviceable butterfly valve of size DN 20 after pumping down of the system, supply ande fixing incl. leak testing of new butter fly valve of size DN 20 and leak testing complete all as directed. Make : Audco/Castle
All as per item No 85 above but DN 25 size.
All as per item No 85 above but DN 32size.
All as per item No 85 above but DN 40size.
Universal refrigeration and Engineering Company
CHITRA ENGINEERING CORPORATION
S.S.ENGINEERING CORPORATION
SRI SAI ENTERPRISES
Maruthi international
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .