Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC AT WASHERY ROAD KATHARA BOKARO JHARKHAND 829116 | KATHARA | BOKARO | JHARKHAND | 829116 | L1 | Accepted-AOC Accepted as L1 as per NIT | |
| 2 | Rejected-Technical AT KHUDGADDA NEW BASTI SAWANG BOKARO JHARKHAND 829128 | BOKARO | BOKARO | JHARKHAND | 829128 | - | Rejected-Technical Rejected as per NIT | |
| 3 | Rejected-Technical AT KATHARA P O KATHARA BOKARO JHARKHAND 829116 | BOKARO | BOKARO | JHARKHAND | 829116 | - | Rejected-Technical Rejected as per NIT |
| Sl No | Description | Qty | Unit | M/S SHYAM ELECTRICALS L1 |
|---|---|---|---|---|
| 1.00 | A. Repairing/Rewinding of 01 no. 160KVA, 11KV/440V Transformer with S.No WPN, pr.S.no :- KTC/tr./11KV/160/2 installed at Bandh Basti jhirkey under Kathara Colliery. (put zero against this row in rate column) | 1 | Job | - |
| 1.01 | Cost of copper wire/Strip | 51.2 | Kg | 1,196 ₹61,235.2 Lowest |
| 1.02 | Cost of insulating material | 1 | LS | 20,450 ₹20,450 Lowest |
| 1.03 | Labour charges | 1 | LS | 20,000 ₹20,000 Lowest |
| 2.00 | B. Complete Rewinding/Repairing of 01no. 100KVA,11KV/440V transformer, S.No 1180.1964 installed at Dudhmatia Basti Jhirkey Under Kathara Colliery. (put zero against this row in rate column) | 1 | Job | - |
| 2.01 | Cost of copper wire/Strip | 32 | Kg | 1,196 ₹38,272 Lowest |
| 2.02 | Cost of insulating material | 1 | LS | 13,450 ₹13,450 Lowest |
| 2.03 | Labour charges | 1 | LS | 13,000 ₹13,000 Lowest |
| 2.04 | LT Bushing with stud with washer, nuts etc as per sample | 2 | Set | 6,600 ₹13,200 Lowest |
| 2.05 | HT Bushing with stud with washer, nuts etc.as per sample | 2 | Set | 6,500 ₹13,000 Lowest |
Tender Value
₹2.1 L
EMD Value
₹2,600
Closing Date
26 May 2025, 4:00 pmClosed
Colliery Manager (M), Manager(F), P.E(EnM)
Colliery Manager (M),Manager(F),Project Engineer(EnM)
Repairing/rewinding of 2NOs. transformer (A)160 KVA, 11KV/440V with Sl No. KTC/Tr./11KV/160/2 at Band Basti (B) 100KVA, 11KV/440V with Sl. No. 1180.1964 installed at Dudhmatiya Basti under Kathara Colliery.
2025_CCL_335417_1
KTC/PE/EnM/25-26/07 Date 14.05.2025
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Office of the Project Officer, PE (EnM), Kathara C
Repairing/rewinding of 2NOs. transformer (A)160 KVA, 11KV/440V with Sl No. KTC/Tr./11KV/160/2 at Band Basti (B) 100KVA, 11KV/440V with Sl. No. 1180.1964 installed at Dudhmatiya Basti under Kathara Colliery.
6 documents required · 6 mandatory
₹2,600
Yes
16 Sept 2025
14 May 2025
27 May 2025
15 May 2025
26 May 2025
15 May 2025
15 May 2025 - 22 May 2025
Amount
A. Repairing/Rewinding of 01 no. 160KVA, 11KV/440V Transformer with S.No WPN, pr.S.no :- KTC/tr./11KV/160/2 installed at Bandh Basti jhirkey under Kathara Colliery. (put zero against this row in rate column)
Cost of copper wire/Strip
Cost of insulating material
Labour charges
B. Complete Rewinding/Repairing of 01no. 100KVA,11KV/440V transformer, S.No 1180.1964 installed at Dudhmatia Basti Jhirkey Under Kathara Colliery. (put zero against this row in rate column)
Cost of copper wire/Strip
Cost of insulating material
Labour charges
LT Bushing with stud with washer, nuts etc as per sample
HT Bushing with stud with washer, nuts etc.as per sample
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .