| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 Cr+₹2.1 L (0.98%)Admitted-Finance | ₹2.2 Cr+₹2.1 L (0.98%) | L2 | Admitted-Finance |
| 3 | L3₹2.2 Cr+₹5.1 L (2.40%)Admitted-Finance | ₹2.2 Cr+₹5.1 L (2.40%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not qualified |
| 5 | Rejected-Technical 113 114 SHUBHLAXMI SHOPPING CENTER SECTOR 9 VASANT NAGARI THANE MAHARASHTRA 401208 INDIA | PALGHAR | MAHARASHTRA | 401208 | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | M/S DATTATRAY CONSTRUCTION L1 | VIJAY S PIMPLE L3 | Kores Sanitation L2 |
|---|---|---|---|---|---|---|
| 1.00Dismantling Bituminous road including stacking of serviceable materails and disposal of unserviceable materials within 200 m lead | ||||||
| 1.10 | Bituminous Road | 36 | Cu.m | 300 ₹10,800 Lowest | 350 ₹12,600 | 300 ₹10,800 Lowest |
| 2.00 | Dismantling of RCC works including Cutting and stacking of steel reinforcement bars and disposal of unserviceable materials within 100 m lead as per direction of Engineer-in-charge | 23 | Cu.m | 1,000 ₹23,000 | 570 ₹13,110 | 550 ₹12,650 Lowest |
| 3.00Lead charges for Lead Exceeding 1 KM but not exceeding 2 KM, by mechanical transport including loading, unloading, stacking / levelling etc. | ||||||
| 3.10 | Debris Beyond 1 Km but up to and including 2 km | 59 | Cu.m | 75 ₹4,425 Lowest | 80 ₹4,720 | 100 ₹5,900 |
| 4.00Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge | ||||||
| 4.10 | From 0.0 to 1.5 m depth below average G.L. | 2,885 | Cu.m | 95 ₹2,74,075 | 80 ₹2,30,800 Lowest | 200 ₹5,77,000 |
| 4.20 | From 1.5 to 3.00 m depth below average G.L. | 654 | Cu.m | 105 ₹68,670 Lowest | 125 ₹81,750 | 300 ₹1,96,200 |
| 5.00Lead charges for Lead Exceeding 1 KM but not exceeding 2 KM, by mechanical transport including loading, unloading, stacking / levelling etc. | ||||||
| 5.10 | For soil Note: The rates in respect of Item Nos. 1 are applicable for the NET Quantities arrived at after making deductions for oids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. | 2,831 | Cu.m | 75 ₹2,12,325 Lowest | 150 ₹4,24,650 | 90 ₹2,54,790 |
Tender Value
₹2.8 Cr
EMD Value
₹5.6 L
Closing Date
26 Aug 2022, 3:00 pmClosed
PM, INRPO
BARC,Tarapur
Civil works of fire hydrant system at SWMF
2022_NRB_704539_1
BARC/NRB/INRPO/SWMF39/2022/178
Open Tender
Civil Works
Item Rate
365 days
BARC, Tarapur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5.6 L
Yes
22 Nov 2022
4 Aug 2022
29 Aug 2022
4 Aug 2022
26 Aug 2022
16 Aug 2022
Amount
Dismantling Bituminous road including stacking of serviceable materails and disposal of unserviceable materials within 200 m lead
Bituminous Road
Dismantling of RCC works including Cutting and stacking of steel reinforcement bars and disposal of unserviceable materials within 100 m lead as per direction of Engineer-in-charge
Lead charges for Lead Exceeding 1 KM but not exceeding 2 KM, by mechanical transport including loading, unloading, stacking / levelling etc.
Debris Beyond 1 Km but up to and including 2 km
From 0.0 to 1.5 m depth below average G.L.
From 1.5 to 3.00 m depth below average G.L.
Lead charges for Lead Exceeding 1 KM but not exceeding 2 KM, by mechanical transport including loading, unloading, stacking / levelling etc.
For soil Note: The rates in respect of Item Nos. 1 are applicable for the NET Quantities arrived at after making deductions for oids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements.
Providing and laying in position cement concrete of 1:3:6 (1 cement, 3 crushed sand, 6 graded stone aggregate of maximum size 20 mm) including consolidation, finishing, curing etc. complete as per specificationsand drawings but excluding the cost of Form work shuttering, centering Complete at all levels
Providing and laying in position Reinforced Cement Concrete (RCC) of grade M-30 using 20mm maximum size aggregates and crushed sand of approved quality including admixtures of approved brand and quality (plasticiser or super plasticiser) if required, including weigh batching, mechanical mixing, transporting, placing, vibrating, consolidation, finishing, curing etc. complete but excluding the cost of centering, shuttering and reinforcement complete as per specifications up to Plinth Level. Note: (1) Form work & reinforcement steel shall be measured and paid for separately under relevant item.
In sub-structure (up to plinth level)
In super-structure (above plinth level up to 20 m height.)
Extra for RCC Using Ready Mix Concrete from outside Project area including transporting and Pumping from approved Batching plants .
Providing, fabricating and erecting form work (For Plant buildings and mass reinforced concrete work only) at all levels and places wherever needed/specified as per drawing including striking with 12mm Plastic coated, marine resistant waterproof ply with adjustable steel props of acceptable Staging system and with sufficient bracing as approved by Engineer in charge. Cost to include designing of proper form work and staging system to suit the requirements,Submission of design calculations and shop drawings for approval,sealing the joints with heavy duty brown self adhesive tape, aligning to line and levels including M.S. Ties, PVC Spacer, Providing openings/ cutouts/ pockets, applying deshuttering chemical, Deshuttering as per specification and instruction of Engineer in charge etc., complete including cost of material ,labour and staging/scaffolding at all levels, heights and profiles
Providing and removing centering, shuttering, strutting, propping etc., and removal of formwork for foundations, footings, bases of column, Walls, (any thickness) and beams including attached pilasters, butteresses, plinth and string courses etc. , for mass concrete including cost of all materials, labour. complete as per specifications. all upto plinth level (Applicable for mass reinforced concrete work only)
Providing and fixing centering and shuttering and removing for concrete work ( reinforced concrete only) including strutting, propping, bracing, bolting tie bolt / spring coil / plastic cone, wedging, easing, striking, removal and for coating with approved mineral shutering oil ( REEBOL of FOSROC / equivalent ) to prevent adhesion etc, complete. ( All works above plinth level upto floor height of 4.50 meter.)
Providing Reinforcement Steel for reinforced cement concrete at all levels including supplying, preparation of bar bending schedules, cutting, bending, transporting, fixing, tieing in position with PVC coated G.I binding wire, all labour charges, cost of cover blocks in specified grade of concrete etc. complete as per specifications and drawings. Steel Supplied by the Contractor Using TMT bars of specified grades of all sizes. TMT bars to be supplied by the contractor from the own plants of SAIL, RINL or TATA make only using virgin materials
Providing Structural steel work using angles, channels, joists and other sections, welded and / or bolted in built up sections for trusses , structural steel floors, frame works, monorails and other structures including supplying, cutting, welding, fabricating, hoisting, fixing in position, applying a priming coat of approved steel primer etc. complete all as per specifications, drawings and Providing Structural steel work in M.S Plain Plates and chequrred Plates for Embedded Parts, Trench Covers, Connection plates etc.including cutting, hoisting, fixing in position and applying a priming coat of approved zinc chromate steel primer etc.including cost of structural steel Plates, welding all labour charges etc.complete as per drawings and specifications as directed by the Engineer in charge .
Up to and including 300 mm Joists, 350 mm channels, and below sections using materials produced by SAIL / RINL (Vizag Steel) / TATA. All test reports to be provided along with the supply of the materials
Provding and constructing brick work in Cement mortar using standard bricks of approved class/ quality, make or brand in foundation and plinth including curing, raking out joints, simultaneous pointing below plinth level if specified, complete as per drawings, specifications and as directed by the Engineer-in-charge
Brick work in C.M 1:4 using crushed sand
Providing and constructing brick work in cement mortar using Standard bricks of approved quality / class, make / brand in super structure above plinth up to Floor-II level in all shapes and sizes including curing, raking out joints complete as per specifications and as directed by the Engineer-in-charge
Brickwork in super structure with standard bricks in C.M 1:4 using crushed Sand
Murum Filling under floors of specified thick in layers of not more than 150 mm thick including supplying required materials and consolidation etc. complete ( Murrum to be brought from out side campus of BARC)
Supplying, stacking and laying of 230 mm thick rubble soling stones as under floor base including packing with smaller stone and compacting, ramming including spreading and consolidation of blinding material, moorum etc. complete all as per specifications and as directed by the Engineer-in-charge
Providing 20 mm thick water proof plastering in cement mortar 1:3 (using river sand) finsihed smooth with a floating coat of neat cement including approved water proofing compound added @ 2% by weight of cement or as per manufacturer's specifications, sieving of sand to required fineness, preparation of surface, scaffolding at all heights, curing all as per specifications, drawings and as directed at site.
Extra for cement punning for all types of mixes complete all as per specifications and as directed
Providing 20 mm thick plastering using Ready mix external plastering compound of approved make for external faces of brickwork / concrete surfaces including preparation of the surface, curing, cleaning scaffolding up to 10 metres height complete.all as per specifications including forming drip moulds wherever necessary and as directed by the Engineer-in-charge
Providing 15 mm thick plastering using Ready mix internal plastering compound of approved make for internal faces of brickwork / concrete surfaces including preparation of the surface, curing, cleaning, scaffolding complete all as per specifications and as directed at site by the Engineer-in-charge
Providing and fixing at all levels precast members using cement concrete of Grade M-30 in copings and / or bed blocks, plain window sills, shelves, louvers, steps, staircases, trench covers, drain covers etc. including hoisting and setting in position with C.M 1:3 (using crushed sand) cost of required centering, shuttering and finishing smooth with 6 mm thick cement plaster 1:3 (using crushed sand) on exposed surfaces complete as per specifications and as directed by the Engineer-in-charge
Providing and laying non pressure NP2 class RCC Hume pipes of approved make, with collars jointed with stiff mixture of cement mortar in the proportion of 1:2, laying to the levels, slopes and as per the drawings and specifications and as directed by the Engineer-in-charge including testing of joints etc. complete.
450 mm Dia RCC Hume pipe class Np2
600 mm Dia RCC Hume pipe class Np2
Providing and Painting two coats of synthetic enamel paint on steel surfaces of approved brand and manufacture to give an even shade over a primer coat.including preparation of the surfaces, scaffolding complete. as per specifications and as directed by the Engineer-in-charge
Kores Sanitation
VIJAY S PIMPLE
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.35 MB
BOQ_741259.xls
BOQ • 0.26 MB
technicalbid.xls
Additional Documents • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .