Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹44.8 LAdmitted-Finance NA | NEW DELHI | DELHI | 110001 | -20.00% | ₹44.8 L | L1 | Admitted-Finance |
| 2 | L2₹46.1 LAdmitted-Finance | -17.79% | ₹46.1 L | L2 | Admitted-Finance |
Tender Value
₹56.0 L
EMD Value
₹4.8 L
Closing Date
23 Jun 2026, 12:00 pmClosed
Project Officer
Duda Lko
Under Guru Nanak Nagar Y construction work of CC road and drain from Herald Public School in Mohd. Naya Sardari Kheda via Jeet Kumar Aroras house to the front of Makrads shop and in adjacent streets.
2026_SUDA_1157877_13
668/po/duda/2026-27 dt 6-6-2026
Open Tender
Civil Works
Percentage
90 days
Duda Lko
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
Director
₹4.8 L
Yes
7 Jul 2026
8 Jun 2026
23 Jun 2026
8 Jun 2026
23 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismanting R.C.C Ramp work manully and disposal of material with in 50 metres | 5.73 | cum | 2,805.32 | ₹16,074.48 |
| 2 | Dismantilling of old interlooking tiles from footpath | 2,236.36 | sqm | 104.07 | ₹2,32,737.99 |
| 3 | Dismantting brick work in time or cement mortar and including stacking of etc | 9.31 | cum | 1,627.5 | ₹15,152.03 |
| 4 | Earth work in cutting or drasing up to 30 cm depth etc. | 3,145.3 | sqm | 102.57 | ₹3,22,613.42 |
| 5 | Brick work with cement moter 1:4 (1 cement:4 csand) etc all complete work | 50.67 | cum | 6,715 | ₹3,40,249.05 |
| 6 | 12mm th. Plaster in 1:4 cement sand etc all comp. | 923.12 | sqm | 186 | ₹1,71,700.32 |
| 7 | S/L GSB etc all comp. | 371.5 | cum | 3,866.86 | ₹14,36,538.49 |
| 8 | P/L cc 1:2:4 cement etc all comp. | 16.25 | cum | 6,223.62 | ₹1,01,133.83 |
| 9 | P/L 125 micron polthene sheet etc all comp. | 3,095.8 | cum | 15 | ₹46,437 |
| 10 | P/L in Position specifide grade of cement concrete excluding the cost of cemtering shuttering 1:1. 5:3 etc all comp. | 471.8 | cum | 7,314 | ₹34,50,745.2 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.37 MB
BOQ_2170046.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].