Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹64,062.95Admitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹86,699.33+₹22,636.38 (35.3%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.1 L
EMD Value
₹2,200
Closing Date
9 Jan 2026, 6:55 pmClosed
Executive Engineer
Executive Engineer RCC Lower Division Hiranagar
Clearance of silt jungle from Ujh Canal from RD 6200 to 8120M Down strem Bein Nallah
2025_IFC_299161_13
e-NIT No. 06 of 2025-26
Open Tender
Civil Works - Canal
Percentage
10 days
Hiranagar
As per NIT
2 documents required · 2 mandatory
₹600
Executive Engineer RCC Lower Division Hiranagar
₹2,200
Executive Engineer RCC Lower Division Hiranagar
22 Jan 2026
29 Dec 2025
10 Jan 2026
29 Dec 2025
9 Jan 2026
29 Dec 2025
29 Dec 2025 - 31 Dec 2025
31 Dec 2025
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Dry
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Wet
Disposal of Silt/Mulbe Av. 1 KM by MT
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_970489.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .