Loading…
Loading…
Tender Value
₹18.4 Cr
EMD Value
₹36.8 L
Closing Date
29 Jul 2026, 12:00 pmClosed
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
Above/Below/Par
CE/CON/S
15 conditions · 4 needing a document upload
Submit the scanned copy (In PDF Form) of the documents as per the requirement of financial eligibility criteria of the tender [Refer para 2.3 of tender document {Para 2.3 for tenderer(s) participating as JV firm}]. TENDERS NOT ACCOMPANIED BY THESE DOCUMENTS WILL BE SUMMARILY REJECTED.
Submit the scanned copy (In PDF Form) of the documents for evaluating the Bid Capacity (Please refer Clause 12.25 of tender document). This is applicable in all works contract having tender value of Rs. 10.00 Crore and above. TENDERS NOT ACCOMPANIED BY THESE DOCUMENTS WILL BE SUMMARILY REJECTED.
Any fabrication and erection work of steel structures in construction of Foot Over Bridges/ Workshops/ Sheds/ Platform Shelters/ Bridges/ Road Over Bridges. Note: Fabrication of steel structure are to be done under RDSO approved fabrication yard of RDSO approved vendor only.
27 conditions · 15 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Notes for all schedules: Standard Schedule of Rates (SSOR) Items: Any item of work carried out by the Contractor on the instructions of the Engineer which is not included in the accepted Bill(s) of Quantities but figures in the Standard Schedule of Rates (SSOR), shall be executed at the rates set forth in the "Standard Schedule of Rates (SSOR)" modified by the tender percentage as accepted in the contract for that chapter of Standard Schedule of Rates (SSOR). However, the cumulative value of all such extra item(s) together (modified by the respective tender percentage) shall not exceed 10 % of the original contract value.
Option of Payment through Letter of Credit (L.C.): Tenderer(s) may submit option for taking payment through Letter of Credit (L.C.). [Refer para 7.1 of tender document].
Credentials if submitted in foreign currency shall be converted into Indian currency i.e., Indian Rupee as under: The conversion rate of US Dollars into Rupees shall be the daily representative exchange rates published by the Reserve Bank of India for the relevant date. Where, relevant date shall be as on the last day of month previous to the one in which tender is invited. In case of any other currency, the same shall first be converted to US Dollars as on the last day of month previous to the one in which tender is invited, and the amount so derived in US Dollars shall be converted into Rupees at the aforesaid rate. The conversion rate of such currencies shall be the daily representative exchange rates published by the International Monetary Fund for the relevant date.
Electronic Reverse Auction (eRA) is applicable in works tender valued more than Rs 50 crore in each case. [Refer para 7.2 of tender document].
Contract under EBR (IF): It is agreed by and between the parties that Railway shall continue to be held responsible for all obligations, risk and liabilities, whatsoever, arising out of or in connection with the Principal agreement and this novation agreement, whether during the progress of the work or after its completion. It is further agreed and understood by and between the parties that IRFC shall be the owner of assets, if any, arising out of execution of works as defined in the Principal Agreement, except the land whose ownership shall continue with Railway. Accordingly, the invoices shall be issued by capturing GSTIN of contractor (as the supplier) and GSTIN of IRFC (as bill to party). Also, the contractor shall submit the invoice, issued in the name of IRFC, to railway for processing payment by Railway to contractor subject to applicable TDS under the Income Tax, GST or any other applicable laws. It is further agreed by and between the Parties that IRFC shall be responsible to comply with Income Tax and GST laws in relation to filling of returns.
There are several changes in the tender document after the new GCC April 2022 is issued. Tenderer(s) are requested to go through the tender document & GCC carefully before the submission of the offer.
Clarification of Bids: To assist in the examination, evaluation & comparison and pre-qualification of the Tender, the Railway may, at its discretion, ask any Bidder for a clarification of its Bid. Any clarification submitted by a Bidder that is not in response to a request by the Railway shall not be entertained or considered. The Railway request for clarification and the response of the bidder in this regard shall be in writing. However, if a Bidder does not provide clarification of its bid by the date and time communicated in the Railway request for clarification, the bid shall be evaluated as per the documents submitted along with the bid.
All General Instructions are available in the uploaded tender document.
Construction of ROH Depot-2 at Bondamunda under the jurisdiction of Dy. Chief Engineer /Con/Rourkela, South Eastern Railway. Estimate No 2061W/2026
388523-DCE-C-ROU-02-2026
388523-DCE-C-ROU-02-2026
Open
Works - General
12 Months
Unknown (Unspecified Location)
₹0
₹36.8 L
4 Jul 2026
4 Jul 2026
15 Jul 2026
91 items across 3 schedules · ₹17,02,25,989.48 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | cum | — | 3075 | 177.5 | 5,45,812.5 |
| 2 | cum | — | 210 | 498.9 | 1,04,769 |
| 3 | cum | — | 630 | 126.8 | 79,884 |
| 4 | cum | — | 21 | 227.4 | 4,775.4 |
| 5 | cum | — | 390 | 2,123.75 | 8,28,262.5 |
| 6 | Sqm | — | 9000 | 17.6 | 1,58,400 |
| 7 | cum | — | 2520 | 308.2 | 7,76,664 |
| 8 | cum | — | 406 | 8,340.85 | 33,86,385.1 |
| 9 | cum | — | 465 | 7,294.7 | 33,92,035.5 |
| 10 | cum | — | 490 | 7,178.75 | 35,17,587.5 |
| 11 | Sqm | — | 2256 | 392.15 | 8,84,690.4 |
| 12 | Sqm | — | 1535 | 842.5 | 12,93,237.5 |
| 13 | Kg | — | 104319 | 107.85 | 1,12,50,804.15 |
| 14 | cum | — | 555 | 9,504.75 | 52,75,136.25 |
| 15 | Sqm | — | 1470 | 5,207.45 | 76,54,951.5 |
| 16 | Kg | — | 15000 | 117.35 | 17,60,250 |
| 17 | Kg | — | 730530 | 133.7 | 9,76,71,861 |
| 18 | Kg | — | 4536 | 97.2 | 4,40,899.2 |
| 19 | Kg | — | 8530 | 172.6 | 14,72,278 |
| 20 | Sqm | — | 3500 | 1,056.15 | 36,96,525 |
| 21 | Metre | — | 288 | 377.4 | 1,08,691.2 |
| 22 | Each | — | 32 | 150.35 | 4,811.2 |
| 23 | Sqm | — | 7718 | 738.65 | 57,00,900.7 |
| 24 | Metre | — | 150 | 532.35 | 79,852.5 |
| 25 | Metre | — | 300 | 1,313.7 | 3,94,110 |
| 26 | Sqm | — | 17665 | 146.8 | 25,93,222 |
| 27 | cum | — | 100 | 2,434.25 | 2,43,425 |
| 28 | cum | — | 150 | 3,551.25 | 5,32,687.5 |
| 29 | cum | — | 200 | 2,060.2 | 4,12,040 |
| 30 | Kg | — | 10000 | 5.65 | 56,500 |
| 31 | Sqm | — | 1680 | 218.9 | 3,67,752 |
| 32 | cum | — | 168 | 2,098.4 | 3,52,531.2 |
| 33 | cum | — | 168 | 1,636.05 | 2,74,856.4 |
| 34 | cum | — | 71 | 768.25 | 54,545.75 |
| 35 | cum | — | 1680 | 1,046.95 | 17,58,876 |
| 36 | cum | — | 320 | 10,529.35 | 33,69,392 |
| 37 | cum | — | 50 | 11,098.45 | 5,54,922.5 |
| 38 | Sqm | — | 1000 | 972 | 9,72,000 |
| 39 | Sqm | — | 3230 | 76.3 | 2,46,449 |
| Schedule total | ₹16,22,72,773.45 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
BarChart22062026.pdf
ATTACHMENT
GCCApril-2022.pdf
ATTACHMENT
Tender Document
ATTACHMENT
GCC 2022 Correction slip
ATTACHMENT
CorrectionSlips1to-11_compressed.pdf
ATTACHMENT
TenderDocumentsROHDepot-2_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .