Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.5 LAccepted-Finance A 4 SIDCO INDUSTRIAL ESTATE METTUR DAM 636402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | 1 | Accepted-Finance Satisfied | |
| 2 | 2₹13.2 L+₹68,847.50 (5.49%)Accepted-Finance M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 2 | Accepted-Finance Satisfied |
Tender Value
Refer Docs
EMD Value
₹16,300
Closing Date
23 Nov 2022, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit III Boiler Pressure parts Replacing the overheated HRH coil header stub bends inside the pent house and allied works
2022_EB_264993_1
CE / MTPS-I / SE / M-I / BM / OT.280 / 2022-23
Open Tender
Power/Energy Projects/Products
Works
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹16,300
Yes
25 Nov 2022
17 Nov 2022
24 Nov 2022
17 Nov 2022
23 Nov 2022
17 Nov 2022
Amount
Charges for removal of Pent house side wall skin casing sheets, insulation for an area of 3m2 and removal of inner wall door 2m2 by removing bolt and nuts for pent house cooling and carry out repair works in pent house and refixing the same after completion of work.
Renewal and repairing of damaged insulation and refixing skin casing inclusive of necessary scaffolding arrangements
Charges for disposal of ash in and around the HRH coil header inside the pent house to the ground floor ash trench.
Charges for cutting the HRH header connection tube of size OD 47.63mmx 5mm thick removal of existing defective boiler tube from the header stub by grinding, the new tube edge preparation, positioning and tube welding includes two layer tig welding and 4 layer arc welding by IBR welder
Charges for renewal of defective boiler tubes of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test / Vaccum test
Charges for post heating and stress relieving of welded area of HRH header and connecting bends. This work involves post heating and stress relieving
Welding electrode Chromotherm - 2 2.5mm
Cutting Gas
Argon gas
T & Ps and consumables
THIAGARAJAN ENGINEERING CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .