Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
23 Jun 2026, 1:00 pmClosed
Executive Engineer, KSHD, PWD
KIT Building, 2nd Floor, P-16, India Exchange Place Extension, Kolkata-700073
IPGMER-SSKM Hospital ---- Providing PUF panel ceiling along with Anti-Microbial Paint in the OT of Ananyo Building during the year 2026-2027. (Civil work)
2026_WBPWD_5015072_1
WBPWD/KSHD/EE/NIQ-03 OF 2026-2027
Open Tender
CIVIL WORKS
Item Rate
30 days
IPGMER-SSKM Hospital
Please refer Tender documents.
5 documents required · 5 mandatory
₹20,000
Yes
6 Aug 2026
5 Jun 2026
25 Jun 2026
9 Jun 2026
23 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 50 mm thick Modular Monoblock ceiling & wall PUF Panel for Modular O.T:-
Providing & fixing ceiling and wall panels made of Modular Monoblock panels having front side of 0.5 mm G.I sheet & backside of 0.5 mm G.I sheet, both side should be factory pre painted to prevent from rusting. Panel should be injected with Poly Urethine Foam (PUF) with a minimun density of 40 Kg/m³ & should be sealed with Aluminium Extrusion etc. complete in all respect as per direction, instruction & approval of the Engineer-in-charge. | 79.95 | Sq.m | - | - |
| 2 | Anti-microbial paint for ceiling/wall GI PUF Panel for Modular O.T:-
Providing & installation of spray painting 2 coats with a water based aseptic & self sterilizing ceiling coating system of 300 microns with priming after necessary filling of all joints to provide a jointless finish. These product hygiene coating start the biocidal action as soon as the micro organism touches the surface & prevents the growth of mould, bacteria & yeasts for the last 5 years. The rate includes the cost of all materials, fixtures, labour, installation transportation cost etc complete in all respect as per direction, instruction & approval of the Engineer-in-charge. | 79.95 | Sq.m | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.88 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
2911.pdf
Tender Documents • 0.89 MB
BOQ_5083634.xls
BOQ • 0.27 MB
Corrigendum1.pdf
PDF • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .