Tender Value
₹123.8 Cr
EMD Value
₹1.9 Cr
Closing Date
25 Nov 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager (CC-III)
General Manager (CC-III), Contracts-Civil Division, 2nd Floor, Jyoti Sadan, NHPC Office Complex, Sector-33, Faridabad-121003 (Haryana)
Lot 3 Package for Hydro-mechanical Works for All Gates and Pressure Shaft Liners for the implementation of the 260 MW Dulhasti Stage II HE Project, in Kishtwar District of UT of J and K, India
2025_NHPC_871264_1
NH/CCW/CC-III /CO-406/PR-10925/83
Open Tender
Power/Energy Projects/Products
Works
1338 days
kishtwar District
As per tender document
12 documents required · 12 mandatory
₹10,000
NHPC Limited
₹1.9 Cr
NHPC OFFICE COMPLEX, FARIDABAD
1 Dec 2025
31 Jul 2025
28 Nov 2025
31 Jul 2025
25 Nov 2025
10 Sept 2025
31 Jul 2025 - 19 Aug 2025
21 Aug 2025
Foreign Currency 2
Foreign Currency 1
Low Level Intake Gate & Hydraulic Hoist
Low Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
Hydraulic Cylinder (130T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.11.
Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.13.
Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
Monorail Hoist (min. 0.5T Cap.) with monorail beam and fixtures etc. complete in all respect common for lower and intermediate level intake gate (as per existing arrangement).
Mandatory Spare Parts (As per statement-1B)
Intermediate Level Intake Gate & Hydraulic Hoist
Low Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
Hydraulic Cylinder (85T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.21.
Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.23.
Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
Mandatory Spare Parts (As per statement-1B)
Upper Level Intake Gate & Hydraulic Hoist
Low Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
Hydraulic Cylinder (50T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.31.
Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.33.
Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
Monorail Hoist (min. 0.5T Cap.) with monorail beam and fixtures etc. complete in all respect.
Mandatory Spare Parts (As per statement-1B)
Low, Intermediate & Upper Level Intake Stoplogs (Slide type), one set for each intake (as per existing arrangement)
Monorail (2 x7T Cap.) hoist with lifting beam complete in all respect and control equipment for 2.1 to suit existing monorail beam
Mandatory Spare Parts (As per statement-1B)
Desilting Chamber Inlet Gate (Fixed wheel type)
First Stage Embedded Parts for 3.1
Second Stage Embedded Parts including dogging etc. for 3.1
Rope Drum Hoist complete in all respect and control equipment for 3.1
Hoist supporting structure & trestle etc. for 3.4.
Mandatory Spare Parts (As per statement-1B)
Desilting Chamber outlet Gate (Slide type)
First Stage Embedded Parts for 4.1 including air vent pipe (500mm dia.)
Second Stage Embedded Parts including dogging etc. for 4.1
EOT Crane including rails, fixtures etc. complete in all respect and control equipment for 4.1 with control equipment.
Mandatory Spare Parts (As per statement-1B)
Silt Flushing Tunnel Service & Emergency Gates (Slide Type)
First Stage Embedded Parts for 5.1 with 300mm dia. air- vent pipe, steel liner, bonnet and bonnet cover, hoist supporting structure and dogging arrangement.
Hydraulic cylinder (double acting) with arrangement for gate position indication and control equipment complete in all respect for 5.1
Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 5.3
Mandatory Spare Parts (As per statement-1B)
Surge Shaft Gate (Fixed wheel type)
First Stage Embedded Parts with reception frame for 6.1 including air vent pipe (300mm dia.)
Second Stage Embedded Parts including dogging etc. for 6.1
Rope drum hoist complete in all respect and control equipment for 6.1 with hydraulic motor and Power Pack
Hoist supporting structure & trestle etc. for 6.4
Mandatory Spare Parts (As per statement-1B)
Steel transition of Pressure Shaft Steel Liner at D/s Surge shaft including matching piece with surge shaft reception frame
Dia 7.0m circular steel liner of upper horizontal portion
Dia 7.0m circular steel liner of upper vertical bend (UVB)
Dia 7.0m circular steel liner of vertical pressure shaft
Dia 7.0m circular steel liner lower vertical Bend (LVB)
7.0m circular steel liner lower Horizontal with Steel manifold (Bifurcation) with inlet dia. 7.0m bifurcating into two branch pipes of internal dia. 5.0m each (Upstream of MIV).
Circular reducer steel liner inlet dia 5.0m and outlet dia of 4m of lower horizontal portion
Dia 4.0m circular steel liner of lower horizontal portion (Downstream of MIV)
4.0m circular steel liner (extra /matching piece) of length 600mm.
Draft Tube Gates (Fixed wheel type)
First Stage Embedded Parts incl. 300mm dia Air Vent Pipe etc. for 8.1
Second Stage Embedded Parts including dogging etc. for 8.1
Rope Drum Hoist complete in all respect and control equipment etc. for 8.1
Hoist supporting structure & trestle etc for Draft Tube gates etc. for 8.4
Mandatory Spare Parts (As per statement-1B)
Tailrace Tunnel Gate (Fixed wheel type)
First Stage Embedded Parts incl. 300mm dia Air Vent Pipe etc. for 9.1
Second Stage Embedded Parts including dogging arrangement etc. for 9.1
Rope drum hoist complete in all respect and control equipment for 9.1
Hoist supporting structure & trestle etc for Tail Race gate for 9.4
Mandatory Spare Parts (As per statement 1B)
Adit Gates (Hinge type)
First Stage Embedded Parts for10.1
Second Stage Embedded Parts for 10.1
A). PLC based remote control system complete in all respects as described in GTS/ PTS. B). Following instruments shall also be provided at their respective locations complete in all respect and is not part of PLC system i. Three (3) Sets of non-contacting microwave type water level measuring and indication equipment at intake area (for balanced head measurement across intake trashrack & intake gates). ii. Two (2) sets of water level measuring system including guiding pipes to indicate balance head condition of Desilting Chamber Inlet Gates. iii. Two (2) sets of water level measuring system including guiding pipes to indicate balance head condition of Desilting Chamber Outlet Gates. iv. One (1) set of water level measuring system including guiding pipes to indicate balance head condition of Surge Shaft Gate. v. Two (2) set of water level measuring system including guiding pipes to indicate balance head condition of Draft Tube Gate. vi. One (1) set of water level measuring system including guiding pipes to indicate balance head condition of Tail race Gate C) Main Distribution Board D) Feeder pillar for all HM equipment.
Mandatory Spare Parts (As per statement-IB)
Diesel Generator Set (320 KVA) complete in all respect with Mounting Frame, acoustic enclosure, control panels and change-over system etc.
Mandatory spare parts (As per Statement 1B)
Oil Filter unit along with contamination checking kit & low vacuum dehydration and degasification unit
Mandatory spare parts (As per Statement 1B)
Mandatory Tools & Tackles (As per statement-1A)
Item Description
Low Level Intake Gate & Hydraulic Hoist
Low Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
Hydraulic Cylinder (130T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.11.
Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.13.
Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
Monorail Hoist (min. 0.5T Cap.) with monorail beam and fixtures etc. complete in all respect common for lower and intermediate level intake gate (as per existing arrangement).
Mandatory Spare Parts (As per statement-1B)
Intermediate Level Intake Gate & Hydraulic Hoist
Low Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
Hydraulic Cylinder (85T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.21.
Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.23.
Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
Mandatory Spare Parts (As per statement-1B)
Upper Level Intake Gate & Hydraulic Hoist
Low Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
Hydraulic Cylinder (50T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.31.
Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.33.
Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
Monorail Hoist (min. 0.5T Cap.) with monorail beam and fixtures etc. complete in all respect.
Mandatory Spare Parts (As per statement-1B)
Low, Intermediate & Upper Level Intake Stoplogs (Slide type), one set for each intake (as per existing arrangement)
Monorail (2 x7T Cap.) hoist with lifting beam complete in all respect and control equipment for 2.1 to suit existing monorail beam
Mandatory Spare Parts (As per statement-1B)
Desilting Chamber Inlet Gate (Fixed wheel type)
First Stage Embedded Parts for 3.1
Second Stage Embedded Parts including dogging etc. for 3.1
Rope Drum Hoist complete in all respect and control equipment for 3.1
Hoist supporting structure & trestle etc. for 3.4.
Mandatory Spare Parts (As per statement-1B)
Desilting Chamber outlet Gate (Slide type)
First Stage Embedded Parts for 4.1 including air vent pipe (500mm dia.)
Second Stage Embedded Parts including dogging etc. for 4.1
EOT Crane including rails, fixtures etc. complete in all respect and control equipment for 4.1 with control equipment.
Mandatory Spare Parts (As per statement-1B)
Silt Flushing Tunnel Service & Emergency Gates (Slide Type)
First Stage Embedded Parts for 5.1 with 300mm dia. air- vent pipe, steel liner, bonnet and bonnet cover, hoist supporting structure and dogging arrangement.
Hydraulic cylinder (double acting) with arrangement for gate position indication and control equipment complete in all respect for 5.1
Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 5.3
Mandatory Spare Parts (As per statement-1B)
Surge Shaft Gate (Fixed wheel type)
First Stage Embedded Parts with reception frame for 6.1 including air vent pipe (300mm dia.)
Second Stage Embedded Parts including dogging etc. for 6.1
Rope drum hoist complete in all respect and control equipment for 6.1 with hydraulic motor and Power Pack
Hoist supporting structure & trestle etc. for 6.4
Mandatory Spare Parts (As per statement-1B)
Steel transition of Pressure Shaft Steel Liner at D/s Surge shaft including matching piece with surge shaft reception frame
Dia 7.0m circular steel liner of upper horizontal portion
Dia 7.0m circular steel liner of upper vertical bend (UVB)
Dia 7.0m circular steel liner of vertical pressure shaft
Dia 7.0m circular steel liner lower vertical Bend (LVB)
7.0m circular steel liner lower Horizontal with Steel manifold (Bifurcation) with inlet dia. 7.0m bifurcating into two branch pipes of internal dia. 5.0m each (Upstream of MIV).
Circular reducer steel liner inlet dia 5.0m and outlet dia of 4m of lower horizontal portion
Dia 4.0m circular steel liner of lower horizontal portion (Downstream of MIV)
4.0m circular steel liner (extra /matching piece) of length 600mm.
Draft Tube Gates (Fixed wheel type)
First Stage Embedded Parts incl. 300mm dia Air Vent Pipe etc. for 8.1
Second Stage Embedded Parts including dogging etc. for 8.1
Rope Drum Hoist complete in all respect and control equipment etc. for 8.1
Hoist supporting structure & trestle etc for Draft Tube gates etc. for 8.4
Mandatory Spare Parts (As per statement-1B)
Tailrace Tunnel Gate (Fixed wheel type)
First Stage Embedded Parts incl. 300mm dia Air Vent Pipe etc. for 9.1
Second Stage Embedded Parts including dogging arrangement etc. for 9.1
Rope drum hoist complete in all respect and control equipment for 9.1
Hoist supporting structure & trestle etc for Tail Race gate for 9.4
Mandatory Spare Parts (As per statement 1B)
Adit Gates (Hinge type)
First Stage Embedded Parts for10.1
Second Stage Embedded Parts for 10.1
A). PLC based remote control system complete in all respects as described in GTS/ PTS. B). Following instruments shall also be provided at their respective locations complete in all respect and is not part of PLC system i. Three (3) Sets of non-contacting microwave type water level measuring and indication equipment at intake area (for balanced head measurement across intake trashrack & intake gates). ii. Two (2) sets of water level measuring system including guiding pipes to indicate balance head condition of Desilting Chamber Inlet Gates. iii. Two (2) sets of water level measuring system including guiding pipes to indicate balance head condition of Desilting Chamber Outlet Gates. iv. One (1) set of water level measuring system including guiding pipes to indicate balance head condition of Surge Shaft Gate. v. Two (2) set of water level measuring system including guiding pipes to indicate balance head condition of Draft Tube Gate. vi. One (1) set of water level measuring system including guiding pipes to indicate balance head condition of Tail race Gate C) Main Distribution Board D) Feeder pillar for all HM equipment.
Mandatory Spare Parts (As per statement-1B)
Diesel Generator Set (320 KVA) complete in all respect with Mounting Frame, acoustic enclosure, control panels and change-over system etc.
Mandatory spare parts (As per Statement 1B)
Oil Filter unit along with contamination checking kit & low vacuum dehydration and degasification unit
Mandatory spare parts (As per Statement 1B)
Mandatory Tools & Tackles (As per statement-1A)
Item Description
Low Level Intake Gate & Hydraulic Hoist
Low Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
Hydraulic Cylinder (130T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.11.
Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.13.
Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
Monorail Hoist (min. 0.5T Cap.) with monorail beam and fixtures etc. complete in all respect common for lower and intermediate level intake gate (as per existing arrangement).
Mandatory Spare Parts (As per statement-1B)
Intermediate Level Intake Gate & Hydraulic Hoist
Low Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
Hydraulic Cylinder (85T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.21.
Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.23.
Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
Mandatory Spare Parts (As per statement-1B)
Upper Level Intake Gate & Hydraulic Hoist
Low Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
Hydraulic Cylinder (50T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.31.
Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.33.
Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
Monorail Hoist (min. 0.5T Cap.) with monorail beam and fixtures etc. complete in all respect.
Mandatory Spare Parts (As per statement-1B)
Low, Intermediate & Upper Level Intake Stoplogs (Slide type), one set for each intake (as per existing arrangement)
Monorail (2 x7T Cap.) hoist with lifting beam complete in all respect and control equipment for 2.1 to suit existing monorail beam
Mandatory Spare Parts (As per statement-1B)
Desilting Chamber Inlet Gate (Fixed wheel type)
First Stage Embedded Parts for 3.1
Second Stage Embedded Parts including dogging etc. for 3.1
Rope Drum Hoist complete in all respect and control equipment for 3.1
Hoist supporting structure & trestle etc. for 3.4.
Mandatory Spare Parts (As per statement-1B)
Desilting Chamber outlet Gate (Slide type)
First Stage Embedded Parts for 4.1 including air vent pipe (500mm dia.)
Second Stage Embedded Parts including dogging etc. for 4.1
EOT Crane including rails, fixtures etc. complete in all respect and control equipment for 4.1 with control equipment.
Mandatory Spare Parts (As per statement-1B)
Silt Flushing Tunnel Service & Emergency Gates (Slide Type)
First Stage Embedded Parts for 5.1 with 300mm dia. air- vent pipe, steel liner, bonnet and bonnet cover, hoist supporting structure and dogging arrangement.
Hydraulic cylinder (double acting) with arrangement for gate position indication and control equipment complete in all respect for 5.1
Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 5.3
Mandatory Spare Parts (As per statement-1B)
Surge Shaft Gate (Fixed wheel type)
First Stage Embedded Parts with reception frame for 6.1 including air vent pipe (300mm dia.)
Second Stage Embedded Parts including dogging etc. for 6.1
Rope drum hoist complete in all respect and control equipment for 6.1 with hydraulic motor and Power Pack
Hoist supporting structure & trestle etc. for 6.4
Mandatory Spare Parts (As per statement-1B)
Steel transition of Pressure Shaft Steel Liner at D/s Surge shaft including matching piece with surge shaft reception frame
Dia 7.0m circular steel liner of upper horizontal portion
Dia 7.0m circular steel liner of upper vertical bend (UVB)
Dia 7.0m circular steel liner of vertical pressure shaft
Dia 7.0m circular steel liner lower vertical Bend (LVB)
7.0m circular steel liner lower Horizontal with Steel manifold (Bifurcation) with inlet dia. 7.0m bifurcating into two branch pipes of internal dia. 5.0m each (Upstream of MIV).
Circular reducer steel liner inlet dia 5.0m and outlet dia of 4m of lower horizontal portion
Dia 4.0m circular steel liner of lower horizontal portion (Downstream of MIV)
4.0m circular steel liner (extra /matching piece) of length 600mm.
Draft Tube Gates (Fixed wheel type)
First Stage Embedded Parts incl. 300mm dia Air Vent Pipe etc. for 8.1
Second Stage Embedded Parts including dogging etc. for 8.1
Rope Drum Hoist complete in all respect and control equipment etc. for 8.1
Hoist supporting structure & trestle etc for Draft Tube gates etc. for 8.4
Mandatory Spare Parts (As per statement-1B)
Tailrace Tunnel Gate (Fixed wheel type)
First Stage Embedded Parts incl. 300mm dia Air Vent Pipe etc. for 9.1
Second Stage Embedded Parts including dogging arrangement etc. for 9.1
Rope drum hoist complete in all respect and control equipment for 9.1
Hoist supporting structure & trestle etc for Tail Race gate for 9.4
Mandatory Spare Parts (As per statement 1B)
Adit Gates (Hinge type)
First Stage Embedded Parts for10.1
Second Stage Embedded Parts for 10.1
A). PLC based remote control system complete in all respects as described in GTS/ PTS. B). Following instruments shall also be provided at their respective locations complete in all respect and is not part of PLC system i. Three (3) Sets of non-contacting microwave type water level measuring and indication equipment at intake area (for balanced head measurement across intake trashrack & intake gates). ii. Two (2) sets of water level measuring system including guiding pipes to indicate balance head condition of Desilting Chamber Inlet Gates. iii. Two (2) sets of water level measuring system including guiding pipes to indicate balance head condition of Desilting Chamber Outlet Gates. iv. One (1) set of water level measuring system including guiding pipes to indicate balance head condition of Surge Shaft Gate. v. Two (2) set of water level measuring system including guiding pipes to indicate balance head condition of Draft Tube Gate. vi. One (1) set of water level measuring system including guiding pipes to indicate balance head condition of Tail race Gate C) Main Distribution Board D) Feeder pillar for all HM equipment.
Mandatory Spare Parts (As per statement-1B)
Diesel Generator Set (320 KVA) complete in all respect with Mounting Frame, acoustic enclosure, control panels and change-over system etc.
Mandatory spare parts (As per Statement 1B)
Oil Filter unit along with contamination checking kit & low vacuum dehydration and degasification unit
Mandatory spare parts (As per Statement 1B)
Mandatory Tools & Tackles (As per statement-1A)
Item Description
Low Level Intake Gate & Hydraulic Hoist
Low Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
Hydraulic Cylinder (130T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.11.
Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.13.
Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
Monorail Hoist (min. 0.5T Cap.) with monorail beam and fixtures etc. complete in all respect common for lower and intermediate level intake gate (as per existing arrangement).
Intermediate Level Intake Gate & Hydraulic Hoist
Low Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
Hydraulic Cylinder (85T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.21.
Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.23.
Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
Upper Level Intake Gate & Hydraulic Hoist
Low Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
Hydraulic Cylinder (50T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.31.
Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.33.
Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
Monorail Hoist (min. 0.5T Cap.) with monorail beam and fixtures etc. complete in all respect.
Low, Intermediate & Upper Level Intake Stoplogs (Slide type), one set for each intake (as per existing arrangement)
Monorail (2 x7T Cap.) hoist with lifting beam complete in all respect and control equipment for 2.1 to suit existing monorail beam
Desilting Chamber Inlet Gate (Fixed wheel type)
First Stage Embedded Parts for 3.1
Second Stage Embedded Parts including dogging etc. for 3.1
Rope Drum Hoist complete in all respect and control equipment for 3.1
Hoist supporting structure & trestle etc. for 3.4.
Desilting Chamber outlet Gate (Slide type)
First Stage Embedded Parts for 4.1 including air vent pipe (500mm dia.)
Second Stage Embedded Parts including dogging etc. for 4.1
EOT Crane including rails, fixtures etc. complete in all respect and control equipment for 4.1 with control equipment.
Silt Flushing Tunnel Service & Emergency Gates (Slide Type)
First Stage Embedded Parts for 5.1 with 300mm dia. air- vent pipe, steel liner, bonnet and bonnet cover, hoist supporting structure and dogging arrangement.
Hydraulic cylinder (double acting) with arrangement for gate position indication and control equipment complete in all respect for 5.1
Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 5.3
Surge Shaft Gate (Fixed wheel type)
First Stage Embedded Parts with reception frame for 6.1 including air vent pipe (300mm dia.)
Second Stage Embedded Parts including dogging etc. for 6.1
Rope drum hoist complete in all respect and control equipment for 6.1 with hydraulic motor and Power Pack
Hoist supporting structure & trestle etc. for 6.4
Steel transition of Pressure Shaft Steel Liner at D/s Surge shaft including matching piece with surge shaft reception frame
Dia 7.0m circular steel liner of upper horizontal portion
Dia 7.0m circular steel liner of upper vertical bend (UVB)
Dia 7.0m circular steel liner of vertical pressure shaft
Dia 7.0m circular steel liner lower vertical Bend (LVB)
7.0m circular steel liner lower Horizontal with Steel manifold (Bifurcation) with inlet dia. 7.0m bifurcating into two branch pipes of internal dia. 5.0m each (Upstream of MIV).
Circular reducer steel liner inlet dia 5.0m and outlet dia of 4m of lower horizontal portion
Dia 4.0m circular steel liner of lower horizontal portion (Downstream of MIV)
4.0m circular steel liner (extra /matching piece) of length 600mm.
Draft Tube Gates (Fixed wheel type)
First Stage Embedded Parts incl. 300mm dia Air Vent Pipe etc. for 8.1
Second Stage Embedded Parts including dogging etc. for 8.1
Rope Drum Hoist complete in all respect and control equipment etc. for 8.1
Hoist supporting structure & trestle etc for Draft Tube gates etc. for 8.4
Tailrace Tunnel Gate (Fixed wheel type)
First Stage Embedded Parts incl. 300mm dia Air Vent Pipe etc. for 9.1
Second Stage Embedded Parts including dogging arrangement etc. for 9.1
Rope drum hoist complete in all respect and control equipment for 9.1
Hoist supporting structure & trestle etc for Tail Race gate for 9.4
Adit Gates (Hinge type)
First Stage Embedded Parts for10.1
Second Stage Embedded Parts for 10.1
A). PLC based remote control system complete in all respects as described in GTS/ PTS. B). Following instruments shall also be provided at their respective locations complete in all respect and is not part of PLC system i. Three (3) Sets of non-contacting microwave type water level measuring and indication equipment at intake area (for balanced head measurement across intake trashrack & intake gates). ii. Two (2) sets of water level measuring system including guiding pipes to indicate balance head condition of Desilting Chamber Inlet Gates. iii. Two (2) sets of water level measuring system including guiding pipes to indicate balance head condition of Desilting Chamber Outlet Gates. iv. One (1) set of water level measuring system including guiding pipes to indicate balance head condition of Surge Shaft Gate. v. Two (2) set of water level measuring system including guiding pipes to indicate balance head condition of Draft Tube Gate. vi. One (1) set of water level measuring system including guiding pipes to indicate balance head condition of Tail race Gate C) Main Distribution Board D) Feeder pillar for all HM equipment.
Diesel Generator Set (320 KVA) complete in all respect with Mounting Frame, acoustic enclosure, control panels and change-over system etc.
Oil Filter unit along with contamination checking kit & low vacuum dehydration and degasification unit
Item Wise
Item Description
Total of Schedule 1: Plant, equipment and mandatory spare parts supplied from abroad
Total of Schedule 2: Plant, equipment and mandatory spare parts supplied from within the Employer's country
Total of Schedule3: Local Transportation including port clearance & port charges and inland insurance
Total of Schedule-4: Installation, Testing & Commissioning
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.08 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.44 MB
Tender_for_CPP.pdf
Tender Documents • 28.19 MB
BOQ_915890.xls
BOQ • 0.45 MB
BOQ.xls
BOQ • 0.45 MB
Tenderdocument.pdf
Tender Documents • 28.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .