| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.0 CrAccepted-Finance | ₹3.0 Cr | 1 | Accepted-Finance 1ST LOWEST |
| 2 | 2₹3.2 CrRejected-Finance | ₹3.2 Cr | 2 | Rejected-Finance 2ND LOWEST |
| 3 | 3₹3.2 CrRejected-Finance | ₹3.2 Cr | 3 | Rejected-Finance 3RD LOWEST |
| 4 | 4₹3.3 CrRejected-Finance VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | ₹3.3 Cr | 4 | Rejected-Finance 4TH LOWEST |
| 5 | 5₹3.4 CrRejected-Finance | ₹3.4 Cr | 5 | Rejected-Finance 5TH LOWEST |
| Sl No | Description | Qty | Unit | M/S ADITYA CONSTRUCTION COMPANY L4 | M/S PRABHAT TRADERS L5 | M/S RAGHVENDRA PRATAP SINGH L1 | Yash Enterprises L2 | RAM NARAYAN YADAV L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning thick jungle and thorney bushes without uprooting (above 500 cusec) | 15,159.62 | Nos | 5 ₹75,798.1 | 2 ₹30,319.24 Lowest | 4 ₹60,638.48 | 3 ₹45,478.86 | 3 ₹45,478.86 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 54.24 | Cum. | 190 ₹10,305.6 | 150 ₹8,136 | 105 ₹5,695.2 Lowest | 130 ₹7,051.2 | 130 ₹7,051.2 |
| 3.00 | 1:3:6 (1 Cement : 3 coarse sand (zone-lll) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 28.35 | Cum. | 5,200 ₹1,47,420 | 5,500 ₹1,55,925 | 4,600 ₹1,30,410 | 4,200 ₹1,19,070 Lowest | 4,200 ₹1,19,070 Lowest |
| 4.00 | Excavation of earth for making pile Bore of 300 mm dia and 1.5 m depth including all labour , T&P etc. complete in all respect . as per direction of engineer in charge. | 975 | Nos | 350 ₹3,41,250 | 400 ₹3,90,000 | 250 ₹2,43,750 Lowest | 390 ₹3,80,250 | 395 ₹3,85,125 |
| 5.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. / above plinth level.(Thermo-Mechanically Treated bars of grade Fe-500D or more.) | 33,539.42 | kg | 70 ₹23,47,759.4 | 80 ₹26,83,153.6 | 68 ₹22,80,680.56 Lowest | 72 ₹24,14,838.24 | 72 ₹24,14,838.24 |
| 6.00 | Centering and shuttering for R.C.C. Work including rent of shuttering, material, labour and T&P required for proper completion of work for slab, and wall etc. (ii) Centering for lintels sumshade and columns etc. | 3,870.99 | Sqm. | 500 ₹19,35,495 Lowest | 500 ₹19,35,495 Lowest | 650 ₹25,16,143.5 | 500 ₹19,35,495 Lowest | 550 ₹21,29,044.5 |
| 7.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size ). | 355.43 | Cum. | 7,800 ₹27,72,354 | 8,500 ₹30,21,155 | 6,850 ₹24,34,695.5 Lowest | 7,100 ₹25,23,553 | 7,100 ₹25,23,553 |
| 8.00 | Brick work with common burnt clay (non modular) bricks of class -150 in superstructure above plinth level up to floor V Level in all shapes and size in : Cement morter 1:4 (1 cement : 4 coarse sand) | 452.77 | Cum. | 4,900 ₹22,18,573 | 5,500 ₹24,90,235 | 4,650 ₹21,05,380.5 Lowest | 5,700 ₹25,80,789 | 5,700 ₹25,80,789 |
| 9.00 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) | 10,346.84 | Sqm. | 170 ₹17,58,962.8 Lowest | 250 ₹25,86,710 | 200 ₹20,69,368 | 240 ₹24,83,241.6 | 240 ₹24,83,241.6 |
| 10.00 | Providing and applying white cement based putty of average thickness 1 mm, of pproved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 10,346.84 | Sqm. | 90 ₹9,31,215.6 | 115 ₹11,89,886.6 | 86 ₹8,89,828.24 Lowest | 120 ₹12,41,620.8 | 120 ₹12,41,620.8 |
Tender Value
₹4.0 Cr
EMD Value
₹8.0 L
Closing Date
20 Jul 2026, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
AS PER TENDER NOTICE LOT 07
2026_UPIDC_1168704_7
04/SE-XII/2026-27
Open Tender
Civil Works
Fixed-rate
180 days
LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,451
₹8.0 L
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
24 Aug 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning thick jungle and thorney bushes without uprooting (above 500 cusec) | 15,159.62 | Nos | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 54.24 | Cum. | - | - |
| 3 | 1:3:6 (1 Cement : 3 coarse sand (zone-lll) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 28.35 | Cum. | - | - |
| 4 | Excavation of earth for making pile Bore of 300 mm dia and 1.5 m depth including all labour , T&P etc. complete in all respect . as per direction of engineer in charge. | 975 | Nos | - | - |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. / above plinth level.(Thermo-Mechanically Treated bars of grade Fe-500D or more.) | 33,539.42 | kg | - | - |
| 6 | Centering and shuttering for R.C.C. Work including rent of shuttering, material, labour and T&P required for proper completion of work for slab, and wall etc. (ii) Centering for lintels sumshade and columns etc. | 3,870.99 | Sqm. | - | - |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size ). | 355.43 | Cum. | - | - |
| 8 | Brick work with common burnt clay (non modular) bricks of class -150 in superstructure above plinth level up to floor V Level in all shapes and size in : Cement morter 1:4 (1 cement : 4 coarse sand) | 452.77 | Cum. | - | - |
| 9 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) | 10,346.84 | Sqm. | - | - |
| 10 | Providing and applying white cement based putty of average thickness 1 mm, of pproved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 10,346.84 | Sqm. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_2192771.xls
BOQ • 0.31 MB
TD7.pdf
Tender Documents • 2.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].