Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.5 LAccepted-AOC | ₹8.5 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹8.5 L+₹3,184.97 (0.38%)Rejected-AOC | ₹8.5 L+₹3,184.97 (0.38%) | 2 | Rejected-AOC Rejected |
| 3 | 3₹8.6 L+₹11,885.57 (1.40%)Rejected-AOC | ₹8.6 L+₹11,885.57 (1.40%) | 3 | Rejected-AOC Rejected |
| 4 | 4₹8.7 L+₹20,511.52 (2.42%)Rejected-AOC | ₹8.7 L+₹20,511.52 (2.42%) | 4 | Rejected-AOC Rejected |
| 5 | 5₹8.8 L+₹29,087.84 (3.43%)Rejected-AOC D NO 50 41 ALAGAR NAGAR 5TH STREET K PUDUR MADURAI 625007 | MADURAI | MADURAI | TAMIL NADU | 625007 | ₹8.8 L+₹29,087.84 (3.43%) | 5 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M.Natarajan L5 | velmurugan.s L4 | SRI GANAPATHI CONSTRUCTIONS L2 | V MURUGESAN CONTRACTOR L7 | SANTHOSHKUMAR CONTRACTOR L3 | MOHAMED BILAL A L1 | R SELVARAJ L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Name of work : Construction of Kitchen Shed with Store room at Eriyodu Panchayat Union Middle School in Eriyodu Town panchayat in Vedasandur Block Estimate amount:Rs.9.35 Lakhs | ||||||||||
| 2.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 12.76 | cum | 262 ₹3,343.12 | 263 ₹3,355.88 | 260 ₹3,317.6 | 264 ₹3,368.64 | 260 ₹3,317.6 | 241.96 ₹3,087.41 Lowest | 263 ₹3,355.88 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 2.7 | cum | 1,922 ₹5,189.4 | 1,678 ₹4,530.6 | 1,920 ₹5,184 | 1,670 ₹4,509 | 1,800 ₹4,860 | 303.6 ₹819.72 Lowest | 1,678 ₹4,530.6 |
| 4.00 | Cement Concrete 1:4:8 (One Cement, Four sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 5.37 | cum | 5,430 ₹29,159.1 | 5,000 ₹26,850 Lowest | 5,400 ₹28,998 | 5,280 ₹28,353.6 | 5,250 ₹28,192.5 | 5,124.4 ₹27,518.03 | 5,271 ₹28,305.27 |
| 5.00 | Brick work in Cement Mortar1:5 (one cement and five sand) using best quality of country bricks of size 8-3/4" x 4-1/4" x 2-1/4" for foundation and basement including curing, etc., complete complying with standard specifiction. | 20.32 | cum | 6,175 ₹1,25,476 | 5,995 ₹1,21,818.4 Lowest | 6,000 ₹1,21,920 | 6,050 ₹1,22,936 | 6,160 ₹1,25,171.2 | 6,806.62 ₹1,38,310.52 | 6,047 ₹1,22,875.04 |
| 6.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification | 5.4 | cum | 40.5 ₹218.7 | 40 ₹216 Lowest | 40 ₹216 Lowest | 46 ₹248.4 | 40 ₹216 Lowest | 42.18 ₹227.77 | 45 ₹243 |
| 7.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton | 114.94 | Sqm | 1,000 ₹1,14,940 | 950 ₹1,09,193 | 950 ₹1,09,193 | 1,096 ₹1,25,974.24 | 850 ₹97,699 Lowest | 935.64 ₹1,07,542.46 | 1,095 ₹1,25,859.3 |
| 8.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. | 1.4 | mt | 90,000 ₹1,26,000 | 91,000 ₹1,27,400 | 88,500 ₹1,23,900 | 91,905 ₹1,28,667 | 88,000 ₹1,23,200 | 85,532.4 ₹1,19,745.36 Lowest | 91,895 ₹1,28,653 |
| 9.00 | Reinforced Cement Concrete 1:1.5:3 (One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 14.57 | cum | 7,550 ₹1,10,003.5 | 8,670 ₹1,26,321.9 | 7,500 ₹1,09,275 Lowest | 8,892 ₹1,29,556.44 | 8,400 ₹1,22,388 | 7,636 ₹1,11,256.52 | 8,891 ₹1,29,541.87 |
| 10.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 32.82 | Sqm | 310 ₹10,174.2 | 300 ₹9,846 Lowest | 300 ₹9,846 Lowest | 309 ₹10,141.38 | 300 ₹9,846 Lowest | 302.68 ₹9,933.96 | 308 ₹10,108.56 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
21 Aug 2026, 3:00 pmClosed
Block Development Officer(BP)
Panchayat Union Office, Vedasandur
Construction of Kitchenshed with Store room at Eriyodu Panchayat Union Middle School in Eriyodu Town Panchayat
2026_RDTN_690136_1
1303/2026/A6
Open Tender
Civil Works - Buildings
Item Wise
90 days
Vedasandur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,000
16 Sept 2026
1 Aug 2026
21 Aug 2026
1 Aug 2026
21 Aug 2026
1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of work : Construction of Kitchen Shed with Store room at Eriyodu Panchayat Union Middle School in Eriyodu Town panchayat in Vedasandur Block
Estimate amount:Rs.9.35 Lakhs | - | - | - | - |
| 2 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 12.76 | cum | - | - |
| 3 | Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 2.7 | cum | - | - |
| 4 | Cement Concrete 1:4:8 (One Cement, Four sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 5.37 | cum | - | - |
| 5 | Brick work in Cement Mortar1:5 (one cement and five sand) using best quality of country bricks of size 8-3/4" x 4-1/4" x 2-1/4" for foundation and basement including curing, etc., complete complying with standard specifiction. | 20.32 | cum | - | - |
| 6 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification | 5.4 | cum | - | - |
| 7 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton | 114.94 | Sqm | - | - |
| 8 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. | 1.4 | mt | - | - |
| 9 | Reinforced Cement Concrete 1:1.5:3 (One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 14.57 | cum | - | - |
| 10 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 32.82 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
Tendernotice_2.pdf
PDF • 0.54 MB
BOQ_829581.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .