Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC GIJROLI DY LIKELY RELATED TO THE WORK LOCATION MENTIONED SPECIFIC ADDRESS NOT PROVIDED FOR THE CONTRACTOR | DAMAN | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396210 | ₹1.5 Cr | L1 | Accepted-AOC L1 |
| 2 | Not Admitted-Finance A 52 CHANAKYA PLACE NEW DELHI BRANCH OFFICE B 175 NANDGRAM GHAZIABAD PIN CODE 110045 | NEW DELHI | NEW DELHI | DELHI | 110045 | - | - | Not Admitted-Finance Not qualified for AOC |
| 3 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
Refer Docs
EMD Value
₹4.2 L
Closing Date
27 Nov 2021, 12:00 pmClosed
S.E. MGCCC-1 Meerut
Office of S.E. MGCCC-1 Meerut
02/SE/MRT/2021-22(Lot15)
2021_UPIDC_645443_15
02/SE/MRT/2021-22
Open Tender
Civil Works
Item Rate
90 days
MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹4.2 L
Yes
18 Jan 2022
22 Nov 2021
27 Nov 2021
22 Nov 2021
27 Nov 2021
22 Nov 2021
Amount
Earth work in foundation in dry soil ( loam clay or sand) including lift upto 1.50 mtr and lead upto 30 mtr and including back filling , watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by Engineer - in - Charge.
Laying cement concrete (M-10 grade) 1:3:6 in under Rcc Floor , etc including all material labour T&P etc
Laying cement concrete (M-15 grade) 1:2:4(with Skin Reinfocement) in wall , Transition sleepers Lining etc including all material labour T&P etc
Laying RCC (M20 Grade) 1:1.5:3 (with Skin Reinfocement) in Floor ,transition wall etc including all material labour T&P etc
Laying R.C.C.in (M-25 grade) 1:1:2 in Wearing coat including all material labour T&P etc
Centring & Shuttering for C.C works in ,Transition,cc floor including cost of all mterials, labour and T&P for proper complition of work.
Centring & Shuttering for R.C.C works in Pier Abutment ,Floor ,wing wall etc including cost of all mterials, labour and T&P for proper complition of work.
Laying of Reinforcement in R.C.C. including cutting, bending, binding and placing in position including cost of all mterials, labour and T&P for proper complition of work.
S/Laying Boulder 20-40 kg in Apron including cost of all mterials, labour and T&P for proper complition of work.
S/F 100 mm dia P.V.C.pipe in draining spout including cost of all mterials, labour and T&P for proper complition of work.
Laying Non Cohesive/Cohesion less (ordinary sand) back filling including cost of all mterials, labour and T&P for proper complition of work.
Supplying & laying of Graded Gravel (Sgingle) in filter(20-40 mm) in layer i/c all cost of labour material T&P etc complete
Supplying & laying of Graded Gravel (Sgingle) in filter(4-20 mm) in layer i/c all cost of labour material T&P etc complete
Supplying & laying of Coarse sand in filter in layer i/c all cost of labour material T&P etc complete
Earth work in Spreading i/c all lead upto 200m &lift 1.50 m.i/c all cost of labour material T&P for proper complition of work
Filling up sealing compound or making contraction joint including cost of all mterials, labour and T&P for proper complition of work.
M-150 Brick work in 1:4 cement mortar in profile wall, etc including cost of all mterials, labour and T&P for proper complition of work.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .