| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹4.2 L+₹5,788 (1.39%)Rejected-AOC COIMBATORE CORPORATION | COIMBATORE | COIMBATORE | TAMIL NADU | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M RAMARAJ L2 | RGR CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Removing and relaying of cut stone slab and RCC cover slab as per Instruction of departmental officers..including all initial lead and lift etc complete. | 30 | m2 | 600 ₹18,000 | 519 ₹15,570 Lowest |
| 2.00 | Desilting the exg drain as per Instruction of departmental officers..including all initial lead and lift etc complete. | 28 | m3 | 100 ₹2,800 | 97 ₹2,716 Lowest |
| 3.00 | Dismantling the damaged PCC Wall as per Instruction of departmental officers..including all initial lead and lift etc complete. | 28 | m3 | 500 ₹14,000 | 485 ₹13,580 Lowest |
| 4.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B | 27 | m3 | 125 ₹3,375 | 113 ₹3,051 Lowest |
| 5.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 8 | m3 | 5,338 ₹42,704 Lowest | 5,338 ₹42,704 Lowest |
| 6.00 | Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., | 204 | m2 | 281 ₹57,324 Lowest | 281 ₹57,324 Lowest |
| 7.00 | Plain Cement Concrete 1:3:6 (one cement, three fine aggregates and six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 41 | m3 | 6,037 ₹2,47,517 Lowest | 6,037 ₹2,47,517 Lowest |
| 8.00 | Plastering in Cement Mortar 1:5 mix 12mm thick etc complete | 68 | m2 | 315 ₹21,420 | 290 ₹19,720 Lowest |
| 9.00 | Conveying the excavated earth from the site from 0 to 15 km lead including loading and unloading charges etc., completed. | 83 | m3 | 175 ₹14,525 | 165 ₹13,695 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
1 Jul 2025, 3:00 pmClosed
Assistant Commisssioner,West Zone
West Zone, Coimbatore Corporation
Reconstruction of Storm Water Drain at VOC nagar 2nd street(South side) in Ward no 42 of West Zone
2025_MAWS_571307_21
E2/WestZone/2025
Open Tender
Civil Works
Works
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹5,000
25 Mar 2026
20 Jun 2025
1 Jul 2025
20 Jun 2025
1 Jul 2025
20 Jun 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
SWD.pdf
Tender Documents • 0.68 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_683082.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .