| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | ₹2.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.2 L+₹29,558.50 (10.3%)Rejected-AOC | ₹3.2 L+₹29,558.50 (10.3%) | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹5,682
Closing Date
22 Sept 2022, 6:00 pmClosed
EE BSNL CD F/floor TE bldg Phase 11 Mohali
EE BSNL CD F/floor TE bldg Phase 11 Mohali
Re-construction of damaged boundary wall at staff quarters SBS Nagar Rajpura(Pb).
2022_BSNL_129088_1
18EEBSNLCDIICHD202223
Open Tender
Civil Works
Item Rate
30 days
E E BSNL CD-II Chandigarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Accounts Officer (Cash), O/o GMT, BSNL, patiala
₹5,682
28 Nov 2022
15 Sept 2022
30 Sept 2022
15 Sept 2022
22 Sept 2022
15 Sept 2022
Amount
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for :
Small lintels not exceeding 1.5m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto and above plinth level.
Thermo-Mechanically Treated bars.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
Cement mortar 1:6 (1 cement : 6 coarse sand) (Note: Old bricks shall be supplied by the deptt free of cost).
Cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix :
1:6 (1 cement: 6 coarse sand)
15 mm cement plaster on the rough side of single or half brick wall of mix :
1:6 (1 cement: 6 coarse sand)
Finishing walls with water proofing cement paint of required shade :
New work (Two or more coats applied @ 3.84 kg/10 sqm).
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge..
In cement mortar
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured):
From brick work in cement mortar
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all loads including all lifts involved.
Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires,between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately) :-Payment to be made per metre cost of total length of barbed wire used.
With Old G.I. barbed wire
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
vikram sachdeva
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .