ACE PWD Zone i Udaipur
Office of the ACE PWD Zone i Udaipur
Construction of road from Nimbahera Karthana Fatak to Badolighata Shahbaad Road (8.50 km) Distt Chittorgarh
2026_CEPWD_600165_1
NIT-11-2026-27 ACE PWD Zone I Udaipur
Open Tender
Civil Works - Roads
Percentage
300 days
Chittorgarh
As per Bid Documents
3 documents required · 3 mandatory
₹5,000
Egras Challan - EE PWD Dn Nimbahera
₹16.9 L
Yes
Office of the ACE PWD Zone i Udaipur
25 Sept 2026
25 Sept 2026
16 Oct 2026
25 Sept 2026
14 Oct 2026
1 Oct 2026
25 Sept 2026 - 1 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201By Mechanical Means In area of Non - Thorny jungle | 7.12 | Hect. | 10,374 | ₹73,889.5 |
| - | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means Bituminous Courses & Granular Courses | 660.94 | Cum. | 69 | ₹45,604.69 |
| - | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 7,755 | Cum. | 25 | ₹1,93,875 |
| - | Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.35 | 7,755 | Cum. | 33 | ₹2,55,915 |
| - | Construction of Embankment with Material Obtained from Borrow PitsConstruction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 Lead For 5.00 KM | 14,940.86 | Cum. | 107.8 | ₹16,10,624.71 |
| - | Crusher Run Macadam Base Providing crushed run stone aggregate greading conforming to table 400-14 depositing on a prepared surface by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a three wheel 80-100 kN static roller as per MoRTH Specification Clause 407 to form a layer of sub-base/base By mixing plant method With 53 mm maximum size of aggregates | 2,805 | Cum. | 982 | ₹27,54,510 |
| - | Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406.By Mechanical Means with all lead | 6,792.5 | Cum. | 1,044 | ₹70,91,370 |
| - | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. By Mix in Place Method Grading-III | 7,245 | Cum. | 407 | ₹29,48,715 |
| - | Prime Coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 33,869 | Sqm. | 28 | ₹9,48,332 |
| - | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 33,869 | Sqm. | 10 | ₹3,38,690 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.55 MB
Potential-Karthana.pdf
Tender Documents • 25.03 MB
BOQ_1063796.xls
BOQ • 0.32 MB
Financial-Karthana.pdf
Tender Documents • 25.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .