Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.5 L+₹33,634.88 (3.67%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | MRP Infratech Private Limited L1 | S.ANBU L2 |
|---|---|---|---|---|---|
| 1.00Name of Work: Filling Pot holes of Damal to Kilar Road Km 0/0 - 3/420 (R-107) at Damal Panchayat in Kancheepuram Panchayat Union of Kancheepuram District for the Year 2025 -26 Under Maintenance of VP & PU Road / 2025-26 Estimate Amount . 9.41 Lakhs | |||||
| 2.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 3,078 | Sqm | 6 ₹18,468 Lowest | 11.36 ₹34,966.08 |
| 3.00 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 923.4 | Cum | 140.2 ₹1,29,460.68 Lowest | 145.4 ₹1,34,262.36 |
| 4.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site | |||||
| 5.00 | KM 0/0 - 1/0 | 21.53 | Sqm | 4,207 ₹90,576.71 Lowest | 4,212 ₹90,684.36 |
| 6.00 | KM 1/0 - 2/0 | 16.45 | Sqm | 4,224.5 ₹69,493.02 Lowest | 4,229 ₹69,567.05 |
| 7.00 | KM 2/0 - 3/0 | 2.07 | Sqm | 4,224.5 ₹8,744.72 Lowest | 4,229 ₹8,754.03 |
| 8.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site | |||||
| 9.00 | KM 0/0 - 1/0 | 1.34 | Cum | 4,890 ₹6,552.6 Lowest | 4,895 ₹6,559.3 |
| 10.00 | KM 1/0 - 2/0 | 5.81 | Cum | 4,907 ₹28,509.67 Lowest | 4,912 ₹28,538.72 |
Tender Value
₹9.4 L
EMD Value
₹9,410
Closing Date
24 Oct 2025, 3:00 pmClosed
BLock Development Officer BP Kancheepuram
Block Development Office Kancheepuram
Filling Pot holes of Damal to Kilar Road Km 0/0 - 3/420 (R-107) at Damal Panchayat in Kancheepuram Panchayat Union of Kancheepuram District for the Year 2025 -26 Under Maintenance of VP and PU Road / 2025-26 Est Amt.9.41 Lakhs
2025_RDTN_615073_1
RC No.E-3690506/2025/A15 Dt.07.10.2025
Open Tender
Civil Works - Roads
Item Rate
90 days
Kancheepuram Union
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,410
8 Oct 2026
17 Oct 2025
24 Oct 2025
17 Oct 2025
24 Oct 2025
17 Oct 2025
Amount
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S.ANBU (BID ID -1495326)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_734874.xls
BOQ • 0.24 MB
Tender_Document.pdf
Tender Documents • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .