| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹4.5 L+₹11,240 (2.57%)Admitted-Finance 0 DHARAMBUGH KRALPORA BAGI MEHTAB B K PORA BUDGAM JAMMU KASHMIR 190019 | SRINAGAR | JAMMU AND KASHMIR | 190019 | L2 | Admitted-Finance | |
| 3 | L3₹4.7 L+₹36,620 (8.39%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹4.8 L+₹45,020 (10.3%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹4.8 L+₹47,088 (10.8%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MIR IRFAN ELECTRICAL/SUPPLIERS L2 | M/S QADRI ELECTRICALS L7 | HARMUKH INFRASTRUCTURE PRIVATE LIMITED L8 | Laiba electrical Suppliers and mechanical work L9 | M/S HIBBA ELECTRICALS L3 | GEC ELECTRICALS L1 | BUDOO ELECTRICALS AND SUPPLIERS L5 | RIM ELECTRICALS & SUPPLIERS L4 | Max Marketing L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Supply installation testing and commissioning of 100KVA, 6.6-11 /.433 KV (dual ratio) Level-2 (Al wound) | 1 | No | 2,10,000 ₹2,10,000 | 2,00,000 ₹2,00,000 | 1,79,000 ₹1,79,000 | 2,10,000 ₹2,10,000 | 2,21,000 ₹2,21,000 | 1,70,000 ₹1,70,000 Lowest | 2,50,000 ₹2,50,000 | 1,90,000 ₹1,90,000 | 2,00,000 ₹2,00,000 |
| 1.02 | Supply installation testing and commissioning of9 Mtr. Long Pole(ST-410 SP33) | 2 | No | 30,200 ₹30,200 | 32,000 ₹32,000 | 36,000 ₹36,000 | 36,000 ₹36,000 | 29,000 ₹29,000 Lowest | 36,600 ₹36,600 | 40,000 ₹40,000 | 36,000 ₹36,000 | 38,000 ₹38,000 |
| 1.03 | Supply installation testing and commissioning of 0.05 ACSR Conductor | 0.1 | Km | 2,000 ₹2,000 | 5,500 ₹5,500 | 400 ₹400 Lowest | 68,000 ₹68,000 | 5,600 ₹5,600 | 3,600 ₹3,600 | 5,000 ₹5,000 | 4,000 ₹4,000 | 6,500 ₹6,500 |
| 1.04 | Providing and fixing of G.I. Channel/ Angle/ X-arm including clamps and braces (S/Stn part complete) | 320 | Kg | 59,200 ₹59,200 | 48,000 ₹48,000 | 38,080 ₹38,080 | 47,360 ₹47,360 | 38,400 ₹38,400 | 40,000 ₹40,000 | 22,400 ₹22,400 Lowest | 43,200 ₹43,200 | 49,600 ₹49,600 |
| 1.05 | Supply installation testing and commissioning of 11 KV GO AB switch 3 pole 200 Amp | 2 | Set | 21,000 ₹21,000 | 26,000 ₹26,000 | 22,000 ₹22,000 | 22,000 ₹22,000 | 22,000 ₹22,000 | 22,000 ₹22,000 | 30,000 ₹30,000 | 20,000 ₹20,000 Lowest | 22,000 ₹22,000 |
| 1.06 | Supply installation testing and commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A | 1 | Set | 4,500 ₹4,500 | 4,500 ₹4,500 | 2,999 ₹2,999 Lowest | 4,000 ₹4,000 | 3,000 ₹3,000 | 3,900 ₹3,900 | 5,000 ₹5,000 | 3,500 ₹3,500 | 4,500 ₹4,500 |
| 1.07 | Supply installation testing and commissioning of 11 KV LA (9KV,10KA,station type) | 1 | Set | 3,200 ₹3,200 | 5,500 ₹5,500 | 2,999 ₹2,999 | 3,500 ₹3,500 | 4,000 ₹4,000 | 4,000 ₹4,000 | 5,000 ₹5,000 | 2,500 ₹2,500 Lowest | 4,000 ₹4,000 |
| 1.08 | Supply installation testing and commissioning of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm with fitting | 6 | No | 1,200 ₹1,200 | 1,800 ₹1,800 | 2,994 ₹2,994 | 2,400 ₹2,400 | 2,700 ₹2,700 | 1,500 ₹1,500 | 600 ₹600 Lowest | 6,000 ₹6,000 | 3,600 ₹3,600 |
| 1.09 | Supply installation testing and commissioning of 35 mm² AB (LT) Cable ( 3 x 35 + 1 x 16 + 1 x 25 insulated) mm² XLPE (1.1kV, 3+1 C, Al) | 75 | Mtr | 11,250 ₹11,250 | 7,500 ₹7,500 Lowest | 39,000 ₹39,000 | 26,250 ₹26,250 | 34,500 ₹34,500 | 41,250 ₹41,250 | 15,000 ₹15,000 | 45,000 ₹45,000 | 45,000 ₹45,000 |
| 1.10 | Supply installation testing and commissioning of 35mm Sq Indoor/ Outdoor cable kits | 2 | Set | 4,400 ₹4,400 | 7,000 ₹7,000 | 3,800 ₹3,800 | 6,000 ₹6,000 | 4,800 ₹4,800 | 3,900 ₹3,900 | 200 ₹200 Lowest | 6,000 ₹6,000 | 6,000 ₹6,000 |
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
10 Oct 2025, 4:00 pmClosed
Executive Engineer ED I
Office of Ex Engineer EDI Basantbagh
Creation of 100 KVA 6.6 11 433KV double ratio substation alongwith HT line for providing power supply to M/s Indian Oil Corporation Limited at Khunmoh outlet for Echarging
2025_PDD_288952_1
E NIT NO 028 OF ED-I
Open Tender
Electrical and Maintenance Works
Lump-sum
25 days
Office of Executive Engineer ED I
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
Yes
Executive Engineer ED I
₹12,000
Yes
6 Nov 2025
19 Sept 2025
11 Oct 2025
19 Sept 2025
10 Oct 2025
19 Sept 2025
19 Sept 2025 - 20 Sept 2025
Supply installation testing and commissioning of 100KVA, 6.6-11 /.433 KV (dual ratio) Level-2 (Al wound)
Supply installation testing and commissioning of9 Mtr. Long Pole(ST-410 SP33)
Supply installation testing and commissioning of 0.05 ACSR Conductor
Providing and fixing of G.I. Channel/ Angle/ X-arm including clamps and braces (S/Stn part complete)
Supply installation testing and commissioning of 11 KV GO AB switch 3 pole 200 Amp
Supply installation testing and commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
Supply installation testing and commissioning of 11 KV LA (9KV,10KA,station type)
Supply installation testing and commissioning of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm with fitting
Supply installation testing and commissioning of 35 mm² AB (LT) Cable ( 3 x 35 + 1 x 16 + 1 x 25 insulated) mm² XLPE (1.1kV, 3+1 C, Al)
Supply installation testing and commissioning of 35mm Sq Indoor/ Outdoor cable kits
Providing and fixing of Galvanized Nuts & Bolts of sizes
Supply installation testing and commissioning of LT Distribution Box for:- 200 kVA DTR with 315 Amp MCCB 3P 25 kA for incomer & 160 Amp MCCB 3P 16 kA 3 No.s for Outgoing Circuits.
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Supply installation testing and commissioning of 120mm² single core Cable,1.1kV Grade, XLPE Insulated Stranded Conductor FRLS type
Providing and laying of Earthing Complete by GI Pipe 40 mm 3 mtr long through GI Strip 25x3 mm
Painting of poles with Al Paint
Painting of poles with Red Oxide Primer
Providing and layong of Cement bottoming 1:2:4 mix 9 Mt ST Poles (0.48 cum/pole)
Providing and fixing of Sundry items like Aluminium lugs, Jumpers, Binding Tape
Providing and fixing of SL Clamps of Sizes
Providing and fixing of Wedge Connectors / PG Clamps
Providing and fixing of Danger Plates with Clamps
Painting of poles with GI Barbed Wire for Anti Climbing
Providing and fixing of HDPE Pipe Outer Dia 50 mm Inner Dia 38 mm for laying of 11kV XLPE Cable
Supply installation testing and commissioning of 3-Ø, 4-Wire Prodigy with suitable ring type CT 200 Amp
MIR IRFAN ELECTRICAL/SUPPLIERS (BID ID -2586003)
M/S HIBBA ELECTRICALS (BID ID -2546953)
RIM ELECTRICALS & SUPPLIERS (BID ID -2584101)
BUDOO ELECTRICALS AND SUPPLIERS (BID ID -2587868)
Max Marketing (BID ID -2584535)
M/S QADRI ELECTRICALS (BID ID -2586930)
HARMUKH INFRASTRUCTURE PRIVATE LIMITED (BID ID -2588106)
Laiba electrical Suppliers and mechanical work (BID ID -2580071)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .