Loading…
Loading…
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
2 Sept 2026, 6:00 pm
Executive Engineer Sgr Core
Office of the Executive Engineer Sgr Core
Construction of 2nd Floor, Truss and allied works for Girls Hostel Building for GCW Nawakadal at Eidgah Srinagar (Phase 2nd).
2026_PWDJK_321782_2
39 of RNB//Sgr-Core/2026-27
Open Tender
Civil Works
Percentage
240 days
Srinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,600
Executive Engineer Sgr Core
₹3.3 L
21 Aug 2026
21 Aug 2026
3 Sept 2026
21 Aug 2026
2 Sept 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil part | |||||
| 1.01 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer- in - charge. Note: - Cement content considered in this item is @ 330 kg/ cum. Excess/ less cement used as per design mix is payable/ recoverable separately. All works upto plinth level | 79.59 | cum | 9,911.1 | ₹7,88,824.45 |
| 1.02 | Centering and shuttering including strutting, propping etc. and removal of form for:
Columns, pillars piers, abutments, posts and struts | 130.2 | sqm | 742.55 | ₹96,680.01 |
| 1.03 | Stairs, (excluding landings) except spiral staircases : | 55.2 | sqm | 851.15 | ₹46,983.48 |
| 1.04 | Lintels, beams, plinth beams, griders, bressumers and cantilevers | 220.27 | sqm | 577.55 | ₹1,27,216.94 |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access plateform | 300.19 | Sqm | 718.2 | ₹2,15,596.46 |
| 1.06 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 144.18 | cum | 9,027.2 | ₹13,01,541.7 |
| 1.07 | Half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in foundations and plinth including curing in :
6.15.1 Cement mortar 1:3 ( 1 cement : 3 coarse sand) | 83.83 | sqm | 1,141.15 | ₹95,662.6 |
| 1.08 | Providing wood work in frames of doors, windows, clerestory windows andother frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): First class kail wood | 3.56 | cum | 1,08,897.35 | ₹3,87,674.57 |
| 1.09 | Providing and fixing wire gauze shutters using galvanized M.S. wire gauze of average width for aperture 1.4 mm in both directions with wire of dia. 0.63 mm for doors, windows and clerestory windows with ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws as per direction of Engineer-in-charge :
First class kail wood | 32.27 | sqm | 3,797.4 | ₹1,22,542.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1075984.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].