Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
18 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
BUILDINGS
14 conditions · 3 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N orV whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of yearsprescribed for completion of work for which bids have been invited. The average annual contractual turnovershall be calculated as an average of "total contractual payments" in the previous three financial years, as perthe audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating averageannual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from CharteredAccountant duly supported by Audited Balance Sheet.
Technical Eligibility criteria: (a)The tenderer must have successfully completed or substantially completedany of the following during last 07 (seven) years, ending last day of month previous to the one in whichtender is invited: Three similar works each costing not less than the amount equal to 30% of advertised valueof the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value ofthe tender, or One similar work each costing not less than the amount equal to 60% of advertised value ofthe tender. (b) (i) In case of composite works (e.g. works involving more than one distinct component, suchas Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges -substructure, superstructure etc.), tenderer must have successfully completed or substantially completedany of the following during last 07 (seven) years, ending last day of month previous to the one in whichtender is invited: Three similar works each costing not less than the amount equal to 30% of advertised valueof each component of tender, or Two similar works each costing not less than the amount equal to 40% ofadvertised value of each component of tender, or One similar work each costing not less than the amountequal to 60% of advertised value of each component of tender. Note: Separate completed works of minimumrequired values shall also be considered for fulfillment of technical eligibility criteria for different components. Work experience certificate from private individual shall not be considered. However, in addition to workexperience certificates issued by any Govt. Organisation, work experience certificate issued by Public listedcompany having average annual turnover of Rs 500 crore and above in last 3 financial years excluding thecurrent financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registeredatleast 5 years prior to the date of closing of tender, shall also be considered provided the work experiencecertificate has been issued by a person authorized by the Public listed company to issue such certificates. Incase tenderer submits work experience certificate issued by public listed company, the tenderer shall alsosubmit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wisedetails of payment received duly certified by Chartered Accountant, TDS certificates for all paymentsreceived and copy of final/last bill paid by company in support of above work experience certificate.Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of thepresent contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract onContractor's default has been initiated. The credential certificate in this regard should have been issued notprior to 60 days of date of invitation of present tender.
Definition of Similar Work :- Any Civil Engineering works (excluding Track works/Zonal works).
18 conditions · 5 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tender value is including escalation of (-) 15% (minus fifteen percent) on CPWD DSR 2023 rates Tenderer should note this before quoting the rates.
All the instructions furnished in the Technical Compliance/ Commercial Compliance/ Custom/Undertakings/General Instructions/Undertakings are only indicative and not exhaustive. Thetenderer shall read the GCC/Tender documents for complete details.
The tenderer shall thoroughly go through the entire tender documents and strictly adhere to theinstructions and directions given therein.
The original Bank Guarantee (in lieu of Bid Security) should be delivered in person to the officialnominated (i.e.OS/Tenders/Engg/NED Division) within before closing date for submission of bids.(i.e.,excluding the last date of submission of Bids).
SW-I: Provision of Overhead water tank of capacity 200kL (2,00,000 Kiter) at Chhatrapati Sambhajinagar (CPSN) for quick watering system. SW-II: Parbhani Provision of 1.50 Lakh Liter Overhead Water Tank and connections at Parbhani Railway Station (Balance Work).SW-II: Parbhani Provision of 1.00 Lakh Liter Overhead Water Tank and connections at Gangakhed Railway Station (Balance Work).
T-202627-3-036~SCR
T-202627-3-036
Open
Works - General
9 Months
Nanded, Maharashtra
₹0
₹4.8 L
25 Aug 2026
25 Aug 2026
4 Sept 2026
97 items across 4 schedules · ₹2,70,13,424.94 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | 1km | cum | 133.27 | 217.55 | 28,992.89 |
| 2 | All kinds of soil | cum | 379.69 | 177.5 | 67,394.98 |
| 3 | Ordinary rock | cum | 126.56 | 498.9 | 63,140.78 |
| 4 | Hard rock (blasting prohibited) | cum | 126.56 | 1,432.95 | 1,81,354.15 |
| 5 | Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia | Metre | 886 | 352.15 | 3,12,004.9 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | cum | 499.54 | 196 | 97,909.84 |
| 7 | 1:3:6 (1 Cement : 3 coarse sand (zone- III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | cum | 22.69 | 7,178.75 | 1,62,885.84 |
| 8 | Extra for providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer's specification. | per bag of 50 kg cement used | 234.43 | 18.15 | 4,254.9 |
| 9 | Foundations, footings, bases of columns, etc. for mass concrete | Sqm | 276.66 | 392.15 | 1,08,492.22 |
| 10 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | Sqm | 252.59 | 842.5 | 2,12,807.08 |
| 11 | Suspended floors, roofs, landings, balconies and access platform | Sqm | 36.53 | 927.25 | 33,872.44 |
| 12 | Lintels, beams, plinth beams, girders, bressummers and cantilevers | Sqm | 320.48 | 736.4 | 2,36,001.47 |
| 13 | Columns, Pillars, Piers, Abutments, Posts and Struts | Sqm | 268.41 | 961.3 | 2,58,022.53 |
| 14 | Spiral staircases (including landing) | Sqm | 32.96 | 798.35 | 26,313.62 |
| 15 | Arches, domes, vaults up to 6 m span | Sqm | 132.37 | 2,154.35 | 2,85,171.31 |
| 16 | Extra for arches, domes, vaults exceeding 6 m span | Sqm | 132.37 | 608.15 | 80,500.82 |
| 17 | Under 20 cm wide | Metre | 55.44 | 208.55 | 11,562.01 |
| 18 | Suspended floors, roofs, landing, beams and balconies (Plan area to be measured) | Sqm | 1685.79 | 384.3 | 6,47,849.1 |
| 19 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | Kg | 3998.1 | 107.85 | 4,31,195.09 |
| 20 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | Kg | 21442.56 | 107.85 | 23,12,580.1 |
| 21 | Concrete of M25 grade with minimum cement content of 330 kg /cum | cum | 133.27 | 9,504.75 | 12,66,698.03 |
| 22 | Concrete of M30 grade with minimum cement content of 350 kg /cum | cum | 153.63 | 10,011.35 | 15,38,043.7 |
| 23 | Add for using extra cement in the items of design mix over and above the specified cement content therein. | Quintal | 37.33 | 733.5 | 27,381.56 |
| 24 | 1:6 (1 cement: 6 fine sand) | Sqm | 397.9 | 333.35 | 1,32,639.97 |
| 25 | 1:3 (1 cement: 3 fine sand) | Sqm | 76.01 | 494.3 | 37,571.74 |
| 26 | New work (two or more coats) over and including water thinnable priming coat with cement primer having VOC content less than 50 gram/litre | Sqm | 1087.93 | 185.65 | 2,01,974.2 |
| 27 | New work (Two or more coats applied @ 1.43 litre/ 10 sqm. Over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm. | Sqm | 737.21 | 181.25 | 1,33,619.31 |
| 28 | Two or more coats on new work | Sqm | 250 | 155.9 | 38,975 |
| 29 | With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre | Sqm | 990.94 | 73.95 | 73,280.01 |
| 30 | Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | cum | 5 | 2,434.25 | 12,171.25 |
| 31 | In cement mortar | cum | 5 | 2,060.2 | 10,301 |
| 32 | In cement mortar | cum | 5 | 2,458.95 | 12,294.75 |
| 33 | For thickness of tiles 10 mm to 25 mm | Sqm | 20 | 73.4 | 1,468 |
| 34 | Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. | cum | 5 | 2,818.9 | 14,094.5 |
| 35 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | cum | 20 | 263.95 | 5,279 |
| Schedule total | ₹90,68,098.09 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderBookletNEDNEW1.pdf
ATTACHMENT
TenderBookletNEDNEW2.pdf
ATTACHMENT
PVC condition
ATTACHMENT
ACS1to6.pdf
ATTACHMENT
AdvanceCorrectioSlip7-10forGCC.pdf
ATTACHMENT
ACS11.pdf
ATTACHMENT
InstructiontoMSE.pdf
ATTACHMENT
RevisedApprovedBrandlist-SCR.pdf
ATTACHMENT
MasterDocumentforHQGuidelines.pdf
ATTACHMENT
HQGuidelines.pdf
ATTACHMENT
BuildingConditions.pdf
ATTACHMENT
PVC-forthevalueoftheworkdoneincludingvariationinquantities._1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].