| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC P O DHUSSARA TEHSIL AMB DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | ₹5.2 L | L1 | Accepted-AOC L-1 |
| 2 | L2₹5.3 LRejected-Finance CHANDRONA TEHSIL NOHRADHAR DISTRICT SIRMOUR H P | ₹5.3 L | L2 | Rejected-Finance Bid rejected due to Higher side rates |
| 3 | L3₹5.3 LRejected-Finance | ₹5.3 L | L3 | Rejected-Finance Bid rejected due to Higher side rates |
Tender Value
₹5.0 L
EMD Value
₹4,973
Closing Date
7 Mar 2026, 2:30 pmClosed
Sr.Xen
(Er.Rahul Puri) Sr. Executive Engineer, Electrical Division, HPSEBL Haroli
HED/406/2025-26
2026_HPSEB_130028_1
NO/HED/406/2025-26
Open Tender
Electrical Works
14 days
ED Haroli
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹4,973
13 Mar 2026
28 Feb 2026
7 Mar 2026
28 Feb 2026
7 Mar 2026
28 Feb 2026
Erection Part of HT Line
Erection of new Steel Tubular Pole 11 mtr. Long Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
Re-Erection of Tilted Steel Tubular Double Pole 11 mtr. Long Digging of Pit,fixing of insulator, disc and erection of pole, filling of Pit, and ramming complete in all respect.
Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
De-stringing & dismentalling of existing HT conductor i.e. Removal of Conductor & G I Wire From Insulator, De -Stringing complete in all respect
Re-Stringing and Re-sagging conductor:-:- Laying of conductor, striging, sagging and biding with insulator with ACSR wolf condcutor (150 Sq mm) of 11 KV HT line complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Erection Part of 3-Phase LT Line
Erection of LT line:-Digging of pit of stay, Erection ofsteel Pole 8/9 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Re-Erection of Tilted LT line Pole:-Digging of pit of stay, Erection of STP/ Pole 8/9 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
Stringing and sagging conductor:- Laying of conductor AAAC 7/3.15 (55mm2) stringing and sagging, binding with insulator complete in all respect (3-Phase L.T Line).
Stringing and sagging conductor:- Laying of conductor AAAC 7/3.15 (55mm2) stringing and sagging, binding with insulator complete in all respect (1-Phase L.T Line)
Dismentalling of existing L.T conductor i.e. Removal of Conductor & GI Wire From Insulator, De -Stringing complete in all respect
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Supply Part of 11 KV HT Line
Prov. Steel Tubular Poles 11 Mtr Long along with base plate complete in all respect(SUPPLY BY HPSEBL 5each)
Prov. RCC Muff with concrete filling
Prov. 11 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure
Prov.Nuts and Bolts of Various Sizes
Prov.MS Half Clamp
Prov.MS Full Clamp/stay
Prov.Barbed Wire
Prov.Eye/Earth Hook
Prov.11kv Stay set complete in all respect
Prov. Stay Wire HT (10 kg. per Stay Set)
Prov.11kv Earthing set complete in all respect.
Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m
Prov. Aluminium Paint.
Prov. Red Oxide
Supply Part 3-Phase LT Line
Prov. Steel Tubular Poles 9 Mtr Long along with base plate complete in all respect(SUPPLY BY HPSEBL 2each)
Prov. RCC Muff with concrete filling
Prov. Channel Iron (75x40x4.8) [Length- 1.50 Mtr + 0.2 Mtr]( 2 Nos for Height Piece)
Prov. Shackle Insulator (16 Kn)
Prov. D-Iron (U-Clamps)
Prov. Earth Knob
Prov. LT Stay Set (i/c Stay clamp)
Prov. Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set
Prov. Full Clamps [ 2 No for A.I + 1 No for Stay Set]
Prov. Earthing Set complete
Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Spiral PVC Spacer
Prov. Aluminium Paint.
Prov. Red Oxide
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_192215.xls
BOQ • 0.74 MB
termandcondition.pdf
Tender Documents • 0.82 MB
additionaltermandcondition.pdf
Additional Documents • 0.54 MB
Download all tender documents and submit your bid