| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.3 CrAccepted-AOC | ₹5.3 Cr | 1 | Accepted-AOC Okay |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not Fulfilling the Criteria of NIT |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Fulfilling the Criteria of NIT |
| 4 | Rejected-Technical HOUSE NO 108 SADILPUR P O PANDU P S JALUKBARI DIST KAMRUP M ASSAM PIN 781012 | KAMRUP METRO | ASSAM | 781012 | - | - | Rejected-Technical Not Fulfilling the Criteria of NIT |
Tender Value
₹4.6 Cr
EMD Value
₹9.1 L
Closing Date
29 Aug 2022, 5:00 pmClosed
As per NIT
As per NIT
Civil Works Pertaining to Restoration Repairing of HRT under Khandong Water Conductor System KHPS Dima Hasao Assam
2022_NEEPC_123201_1
NEEPCO KHPS CnP NIT No. 468 dated 21.07.2022
Open Tender
Civil Works
Works
60 days
As per NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Yes
As per NIT
₹9.1 L
Yes
3 Jan 2023
21 Jul 2022
31 Aug 2022
22 Jul 2022
29 Aug 2022
23 Jul 2022
Amount
Dewatering
Dewatering of Surface/ Underground Construction Sites including all construction works, labour plant and materials necessary to keep the construction sites including all construction works, labour, plant and materials necessary for dewatering. Complete in all respect as per technical specification, drawings and as directed by the Engineer-in-Charge
Dewatering of Surface Construction Sites including all labour, plant, materials, installation, operation, power supply, maintenance and removal of pumping equipments from site
Dewatering of Underground Construction Sites including all labour, plant, materials, installation, operation, power supply, maintenance and removal of pumping equipments from site
Concreting
2nd Stage Reinforced Cement Concrete in Saddle Supports: Reinforced Cement Concrete as per drawing and Technical Specification including Steel Shuttering Formwork With Plasticiser RCC Grade M25 Using Concrete Mixer
Steel Reinforcement
Supplying, fitting and placing TMT conforming to IS: 1786 Fe 500D reinforcement including splicing complete as per drawing and technical specifications TMT- IS 1786 (Fe 500D)
Non-shrin Grouting
Non- Shrink Grouting: Providing & injecting approved grout in proportion recommended by the manufacturer at location as directed by the Engineer-in-Charge by suitable gun/pump at required pressure including cutting of nipples after curing, etc. complete as per the technical specification or as directed by the Engineer-in-Charge
Repair of existing damaged concrete
Installation of injection system for epoxy grout/ non- shrink grout: Installation of non-returnable Packers fixed at required interval including drilling of holes upto a depth of approx. 1/3rd depth of the concrete thickness using a heavy duty drill machine, cleaning of holes, fixing of packers with structural mortar or epoxy mortar, etc. complete in all respect including all materials, labours, tools & plants, etc. as per the technical specification or as directed by the Engineer-in-Charge.
Cutting both sides of construction joints in V Groove of size as directed by the Engineer-in-Charge along the construction lift joints for application of high grade dual shrinkage compensated epoxy mortar complete in all respect including labours, tools & plants, etc. as per the technical specification or as directed by the Engineer-in-Charge
Placing of high grade dual shrinkage compensated epoxy repair mortar for repair of designated locations as directed by the Engineer-in-Charge with high flow, single component, dual shrinkage compensated, cementious micor concrete that acheives a comprehensive strength of minimum 50 MPa in 3 days and 70MPa in 28 days, complete in all respect with all materials, labours, tools & plants, etc. as per the technical specification or as directed by the Engineer-in-Charge
Application of Epoxy Grout: Application of low viscous, high swelling, thermosetting epoxy grout with hardner solution through already fixed non-returnable packers along the cracks/ construction joints using medium to high pressure special injection pumps. The mixing should be done as per the manufacturer's specification and using specialized applicator. The amount of hardner per litre depends on the required pot life at present ambient temperature, the epoxy hardner shall be mixed until the colour gets uniform and application shall be carried out within the pot life. Complete in all respect with all materials, labours, tools & plants, etc. as per the technical specification or as directed by the Engineer-in-Charge
Reinforced Cement Concrete in HRT: Plain Cement Concrete complete as per drawings & Technical Specification including steel shuttering formworks With Plasticiser / bonding additives PCC Grade M20
15mm thick Cement plaster finished with afloating coat of neat cement of mix: 1:3 (1 cement : 3 sand)
Treatment of HR Tunnel Invert
Chipping and breaking/ cutting of lose concrete, mortars, etc. using Electrical Chipping Hammers to the satisfaction of the Engineer- in-Charge for successful execution of the subsequent rehabillation works at all heights with all leads, lifts, etc. comnplete with all tools and machineries required for the job, operator, applicator, labour, scaffolding for staging and supervision, etc
Before laying of the Micro Concrete, the substrate shall be coated with a bonding agent, Nitobond EP Std./ Sikadur- 32 LP or equivalent product and the micro concrete shall be poured within 6 hrs/ 4hrs or as applicable of the application of the Bonding Agent
Supply, transportation and application of Hydraulic abrasion resistance mortar conforming to EN 1503-3 R4 in repair / rebuilding of damaged PCC/RCC to it's original size by hand or spray application complete in all respect with all materials, labours, tools & plants, etc. as per the technical specification or as directed by the Engineer-in-Charge
Supply, transportation of aggregate of size 10mm down and mixing with hydraulic abrasion resistance mortar complete in all respect with all materials, labours, tools & plants, etc. as per the technical specification or as directed by the Engineer-in-Charge
Seepage Routing
Supply and Fixing of SS NRV of various dia ranging fromm 25mm to 40mm including all manpower, materials, equipments/machinery, necessary scaffolding to complete the job as specification and direction of EIC complete.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .