Tender Value
₹23.6 L
EMD Value
₹47,300
Closing Date
20 Jul 2026, 6:00 pm2d left
EXECUTIVE OFFICER
LAXMANGARH SIKAR
construction of rain water harvestering structure and pump house at coart coumpes laxmangarh
2026_DLB_573604_1
ETENDER/1273-74
Open Tender
Civil Works
Percentage
120 days
LAXMANGARH SIKAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EXECUTIVE OFFICER
₹47,300
Yes
8 Jul 2026
8 Jul 2026
21 Jul 2026
8 Jul 2026
20 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m HWR, PUMP, TRENCH | 72.13 | cum | 229.5 | ₹16,553.84 |
| 2 | Add extra for overall depth of excavation above 1.5 m and upto 3.0 m over item no 4.10.1.1 | 84 | cum | 229.5 | ₹19,278 |
| 3 | Add extra for over all depth of excavation above 1.5 m and upto 3.0 m over item no 17.1.1.1 | 84 | cum | 245.6 | ₹20,630.4 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40
mm nominal size). HWR, PUMP, TRENCH | 6.59 | cum | 4,575 | ₹30,149.25 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size) | 1.84 | cum | 5,510 | ₹10,138.4 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 149.44 | cum | 6,340 | ₹9,47,449.6 |
| 7 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform. | 46.2 | sqm | 456 | ₹21,067.2 |
| 8 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 65.68 | sqm | 367 | ₹24,104.56 |
| 9 | Providing, lowering, laying in trenches, aligning, fixing in position and jointing socketed rubber gasket type ISI marked uPVC pipes of Class III (6 Kg/sqcm) suitable for potable water with rubber ring joints (as per IS 4985-2000) of following outer dia with all accessories (excluding specials) complete including all material,
labour, hydraulic testing and commissioning as per Technical Specifications and as per direction of Engineer. Note : E/w to be measured and paid separately. 160 mm dia | 50 | mtr | 605 | ₹30,250 |
| 10 | Construction of Tube-well upto 100 Meter depth and above in all type of rocks by DTH system and over burden to accommodate casing pipe of following sizes in all types of soils and over burden including lowering of casing pipes but excluding cost of casing pipes
as per IS : 2800 (Part I & II) 1979 specifications. The work would be completed after obtaining sand free water. The tube well should have a throughout bore as per nominal dia of casing pipe: 200 mm dia Nominal bore | 120 | mtr | 1,407 | ₹1,68,840 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_1020347.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid