Loading…
Loading…
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
24 Sept 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER(VP)
BLOCK DEVELOPMENT OFFICER (VP) SRIVAIKUNDAM Panchayat Union Office,SrivaikundamBlock,Thoothukudi District
Construction of Drainage with cover slab and Horizontal Soak pit at Pattandivilai to Mullanvilai Main Road in Nattathi Village Panchayat in Srivaikundam Panchayat Union under the Scheme of Model Village Fund 2021-22
2026_RDTN_699153_1
SrivaiLr.No.jp4/015/2023 Dt 28.08.2026
Open Tender
Civil Works
Item Rate
90 days
srivaikundam block
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹10,000
24 Sept 2026
28 Aug 2026
24 Sept 2026
28 Aug 2026
24 Sept 2026
28 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work: Construction of Drainage with cover slab and Horizontal Soak pit at Pattandivilai to Mullanvilai Main Road in Nattathi Village Panchayat in Srivaikundam Panchayat Union | - | - | - | - |
| 2 | Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification. | 125.72 | cum | - | - |
| 3 | Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification. | 22.19 | cum | - | - |
| 4 | Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification. | 51.48 | cum | - | - |
| 5 | Centering charges for sides and soffits of R.C.C.works including labour etc., complete as per standard specification. | 331.2 | cum | - | - |
| 6 | Supplying and fabrication of steel including cost and conveyance and all charges etc. complete | 1 | KG | - | - |
| 7 | RCC 1:1.5:3 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification. | 1.15 | cum | - | - |
| 8 | Plastering with CM 1:5 , 12m thick including cost and conveyance and all labour charges etc complete | 41.1 | SQM | - | - |
| 9 | SUB ESTIMATE - HORIZONTAL SOAK PIT | - | - | - | - |
| 10 | Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification. | 19.36 | cum | - | - |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
TechnicalBid.pdf
Tender Documents • 0.72 MB
BOQ_840472.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .