| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAccepted-AOC | ₹13.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.3 LRejected-Finance | ₹13.3 L | L2 | Rejected-Finance L2 |
| 3 | L3₹13.7 LRejected-Finance | ₹13.7 L | L3 | Rejected-Finance L3 |
| 4 | L4₹14.0 LRejected-Finance | ₹14.0 L | L4 | Rejected-Finance L4 |
| 5 | L5₹14.8 LRejected-Finance | ₹14.8 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S Keshav Construction L3 | M/S VED PRAKASH L6 | DINESH KUMAR NIGAM THEKEDAR L4 | M/s V.S. Construction and Suppliers L1 | M/S VIGHNAHARTA ENTERPRISES AND CONSTRUCTION L5 | M/s BALENDRA SINGH BHADAURIA L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earht Work in excavation of foundation in Mar, Rankar and Kankar mixed soils including lift upto 1.5m and lead upto 30m including filling,watering, ramming of excavated earth into the trenches or upto the space and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer - in - charge upto a distance of 30m from the foundation trenches | 371.92 | Cum | 88 ₹32,728.96 | 97.5 ₹36,262.20 | 90.54 ₹33,673.64 | 84.77 ₹31,527.66 | 21.5 ₹7,996.28 | 86.45 ₹32,152.48 |
| 2.00 | Sand filling in foundation including all cost of material, labour and T&P etc. | 20.88 | Cum | 962 ₹20,086.56 | 1,421 ₹29,670.48 | 1,319.88 ₹27,559.09 | 1,235.81 ₹25,803.71 | 3,000 ₹62,640 | 1,260.1 ₹26,310.89 |
| 3.00 | Laying C.C. 1:3:6 with 20-40mm gauge stone ballast including all cost of material, labour and T&P etc. | 41.75 | Cum | 4,128 ₹1.7 L | 4,649.34 ₹1.9 L | 4,318.06 ₹1.8 L | 4,043.02 ₹1.7 L | 5,415 ₹2.3 L | 4,122.5 ₹1.7 L |
| 4.00 | Providing & Laying R.C.R. Stone masonary with 1:4 cement sand mortar including all cost of material, labour and T&P etc. | 173.67 | Cum | 5,196 ₹9.0 L | 5,672 ₹9.9 L | 5,267.91 ₹9.1 L | 4,932.37 ₹8.6 L | 5,390 ₹9.4 L | 5,029.35 ₹8.7 L |
| 5.00 | Struck raised pointing on stone masonary with 1:2 cement sand mortor including all cost of material, labour and T&P etc. | 280.75 | Cum | 114 ₹32,005.50 | 127.9 ₹35,907.93 | 118.78 ₹33,347.49 | 111.22 ₹31,225.02 | 230 ₹64,572.50 | 113.4 ₹31,837.05 |
| 6.00 | Supply and laying C.C 1:2:4 with cement,coarse sand and 11.20-19 mm stone grit including all cost of material,labour and T&P etc all complete | 10.66 | Cum | 5,562 ₹59,290.92 | 5,548 ₹59,141.68 | 5,152.85 ₹54,929.38 | 4,824.64 ₹51,430.66 | 6,615 ₹70,515.90 | 4,919.5 ₹52,441.87 |
| 7.00 | Providing & Laying 50mm coping with CC 1:1.5:3 on top of RCR with 11.20 -19 mm stone grit and coarse sand including all cost of material ,labour and T&P etc complete. | 6.07 | Cum | 5,644 ₹34,259.08 | 6,099.59 ₹37,024.51 | 5,664.97 ₹34,386.37 | 5,304.14 ₹32,196.13 | 6,988 ₹42,417.16 | 5,408.4 ₹32,828.99 |
| 8.00 | Supply and Laying of 1200 mm dia RCC Hume pipe per RM with loading,unloading and carriage etc and including all cost of material, labour and t&p etc. complete. | 17.5 | Sqm | 6,454 ₹1.1 L | 7,301 ₹1.3 L | 6,781.01 ₹1.2 L | 6,349.09 ₹1.1 L | 3,815 ₹66,762.50 | 6,473.9 ₹1.1 L |
Updated dates
Tender Value
₹16.7 L
EMD Value
₹34,000
Closing Date
11 May 2026, 3:00 pmClosed
EXECUTIVE ENGINEER KEN CANAL DIVISION BANDA
KEN CANAL DIVISION BANDA
Reconstruction of Syphon at Km 26.150 of Alona Dy.
2026_UPIDC_1144515_1
01/EE/2026-27
Open Tender
Civil Works
Alona Dy. Km. 26.150
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,104
₹34,000
5 Jun 2026
4 May 2026
11 May 2026
4 May 2026
11 May 2026
4 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earht Work in excavation of foundation in Mar, Rankar and Kankar mixed soils including lift upto 1.5m and lead upto 30m including filling,watering, ramming of excavated earth into the trenches or upto the space and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer - in - charge upto a distance of 30m from the foundation trenches | 371.92 | Cum | 108.2 | ₹40,241.74 | itemH1Code1 |
| 2 | Sand filling in foundation including all cost of material, labour and T&P etc. | 20.88 | Cum | 1,577.3 | ₹32,934.02 | code1.02 |
| 3 | Laying C.C. 1:3:6 with 20-40mm gauge stone ballast including all cost of material, labour and T&P etc. | 41.75 | Cum | 5,160.2 | ₹2,15,438.35 | itemH1Code2 |
| 4 | Providing & Laying R.C.R. Stone masonary with 1:4 cement sand mortar including all cost of material, labour and T&P etc. | 173.67 | Cum | 6,295.3 | ₹10,93,304.75 | itemH1Code3 |
| 5 | Struck raised pointing on stone masonary with 1:2 cement sand mortor including all cost of material, labour and T&P etc. | 280.75 | Cum | 141.95 | ₹39,852.46 | itemH1Code4 |
| 6 | Supply and laying C.C 1:2:4 with cement,coarse sand and 11.20-19 mm stone grit including all cost of material,labour and T&P etc all complete | 10.66 | Cum | 6,157.8 | ₹65,642.15 | itemH1Code5 |
| 7 | Providing & Laying 50mm coping with CC 1:1.5:3 on top of RCR with 11.20 -19 mm stone grit and coarse sand including all cost of material ,labour and T&P etc complete. | 6.07 | Cum | 6,769.8 | ₹41,092.69 | itemH2Code1 |
| 8 | Supply and Laying of 1200 mm dia RCC Hume pipe per RM with loading,unloading and carriage etc and including all cost of material, labour and t&p etc. complete. | 17.5 | Sqm | 8,103.5 | ₹1,41,811.25 | itemH2Code2 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_2138521.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid