Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.6 LAccepted-AOC AT RANAPUR PO RANAPUR DIST NAYAGARH | RANAPUR | NAYAGARH | ODISHA | ₹24.6 L | L1 | Accepted-AOC AOC |
| 2 | L2₹27.4 L+₹2.8 L (11.5%)Rejected-Finance VILL B NUAPALLI PO PS KODALA GANJAM | KODALA | GANJAM | ODISHA | ₹27.4 L+₹2.8 L (11.5%) | L2 | Rejected-Finance Not L1 |
| 3 | L3₹27.5 L+₹3.0 L (12.2%)Rejected-Finance | ₹27.5 L+₹3.0 L (12.2%) | L3 | Rejected-Finance Not L1 |
| 4 | L4₹28.3 L+₹3.7 L (15.1%)Rejected-Finance | ₹28.3 L+₹3.7 L (15.1%) | L4 | Rejected-Finance Not L1 |
| 5 | L5₹31.3 L+₹6.7 L (27.4%)Rejected-Finance | ₹31.3 L+₹6.7 L (27.4%) | L5 | Rejected-Finance Not L1 |
Tender Value
₹39.1 L
EMD Value
₹39,099
Closing Date
29 Jun 2026, 5:00 pmClosed
Superintending Engineer
O/o the S.E, RandB Division, Nayagarh
Construction of Kitchen cum dinning in OAV at Ranpur under Ranpur Block in the District of Nayagarh for the year 2025-26
2026_EICCL_132523_1
eTCN06 of 2026-2027
Open Tender
Civil Works - Buildings
Percentage
180 days
Nayagarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹39,099
Yes
19 Sept 2026
22 Jun 2026
30 Jun 2026
22 Jun 2026
29 Jun 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in foundation and trench in hard soil with initial lead of 50 mtr and 1.5 mtr lift, levelling and dressing the bed including cost of all labour, T & P etc complete. | 1 | Cum | 276.9 | ₹276.62 |
| 2 | Providing filling foundation and plinth with sand well watered and rammed with rammer including cost of all materials and labour T & P etc complete. | 1 | Cum | 1,188.6 | ₹1,187.41 |
| 3 | Cement concrete(1:3:6 ) using 40 mm size B.H.G C.B chips laying in layers niot exceeding 150mm ramming in rammer,watering and curing etc. | 1 | Cum | 5,933.7 | ₹5,927.77 |
| 4 | R.C.C-M-20 using 20mm and down graded chips laying & lowering concrete watering curing etc complete including cost of Centering and Shuttering all comp.
COLUMN BASE, FOOTING | 1 | Cum | 6,873.9 | ₹6,867.03 |
| 5 | GRADE BEAM | - | Cum | 6,683.1 | - |
| 6 | Lintel bend | - | Cum | 10,569.1 | - |
| 7 | Chajja | - | Sqm | 987.6 | - |
| 8 | Fins | - | Sqm | 1,593 | - |
| 9 | Column & Beam in Superstructure | - | Cum | 15,786.1 | - |
| 10 | Roof Slab | - | Cum | 11,468.1 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.16 MB
DTCN0601.pdf
Tender Documents • 1.21 MB
BOQ_597235.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .