Loading…
Loading…
Tender Value
₹93.3 L
EMD Value
₹1.9 L
Closing Date
8 Oct 2026, 5:00 pmClosed
VIKAS KUMAR
SASARAM MUNICIPAL COMMISSIONER
G.T. ROAD SASARAM
VIKAS KUMAR
SASARAM MUNICIPAL COMMISSIONER
Construction Of R.C.C Drain From Bauliya mod to Kushwaha Bhawan via Shahu cenema at ward 18 Under Nagar Nigam Sasaram, Rohtas
140426
NNSSMNIT19/2026-27_GR_03
Open Tender
CIVIL
Rohtas
• PAN NUMBER
• GST REGISTRATION NUMBER
• FIRM REGISTRATION CERTIFICATE
• AFFIDAVIT
• CHARACTOR CERTIFICATE
• TOOL AND PLANTS
• EXISTING CERTIFICATE
• OTHERS AS PER NIT
CIVIL
PERCENTAGE
L1
1
8 documents required · 8 mandatory
₹10,000
Processing Fee: 5900
₹1.9 L
30 Sept 2026
30 Sept 2026
10 Oct 2026
3 Oct 2026
8 Oct 2026
3 Oct 2026
Name Of Scheme:- Construction Of R.C.C Drain From Bauliya mod to Kushwaha Bhawan via Shahu cenema at ward 18 Under Nagar Nigam Sasaram, Rohtas
DETAILS ESTIMATE
S.No. BCD 2022 Items of Work Nos. L B D Quantity Unit Rate Amount Rs.
1 15.7.4 Demolishing brick work including stacking of serviceable material and disposal of unserviceable material within 50 meters lead: In cement mortar
2 2.8.1 Earth work in excavation in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m . including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
3 2.28 Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete.
total 1373.75 cft
4 11.72 Providing designation 100 A one brick flat soling joints filled with local sand ..do…do. All compt
total 5495.00 sft
5 4.1.3 Providing and laying in position cement concrete of specified grade exluding the cost of centring and shuttering-all work upto plinth level. 1:2:4(1 Cement: 2 coarse sand:4 graded stone aggregate 20 mm nominal size)
6 5.1.2 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-All work puto plinth level 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size)
total 16076.80 cft
7 5.22 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
5.22.7C 12mm TMT Bar
Wall -(U-shaped)- 150mm c/c 1570 21.50 33755.00 Ft
Wall -( L- shaped) 150mm c/c (both side) 1570 10.00 15700.00 Ft
slab- Main Bar (Double Layer) 125mm c/c 1870 13.50 25245.00 Ft
total 90400.00 Ft
5.22.7b 10mm dia -150mm c/c
wall layer 32 785.00 25120.00 Ft
slab- Distribution Bar (Double Layer) 2x14 785.00 21980.00 Ft
total 83210.00 Ft
8 19.19.4.1 Providing and fixing in position pre-cast R.C.C. manhole cover and frame of required shape and approved quality
Circular shape 560 mm internal dia 33.00 Each 1393.20 45975.60
9 5.9 Providing Centring and shuttering including strutting,propping etc. and removal of form
A 5.9.2 Walls (any thickness) including attached pilasters. Butteresses, plinth and string courses etc.
B 5.9.3 Suspended floors, roots, landings, balcnies and access platform.
total 3925.00 sft
C 5.9.1 Foundations, footings, bases of columns etc. for mass concrete.
slab side 2 785.00 0.67 1051.90 sft
toal 2229.40 sft
10 2.26 filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth: consolidating each deposited layer by ramming and watering lead
25% Of Qnty Vide item No. 01 244.55 cum 123.90 30299.53
Total (A) Rs. 7659248.04
11 Cariage cost of materials
Local sand 46.57 cum 310.50 14458.66
Coarse sand 210.82 cum 1020.00 215033.64
Stone chips 421.63 cum 2043.39 861563.91
12 Difference cost of materials
Total (B) Rs. 1161781.17
Total (A+B) Rs. 8821029.22
Add GST ( increase 12% to 18% ) as Factor 5.36% . 472807.17
Add Scheme Board L.S 0.00
Total (C) Rs. 9293836.38
13 Add Seigniorage Fee
Local sand 46.57 cum 14.19 660.77
Coarse sand 210.82 cum 17.58 3706.17
Stone Chips -20mm 421.63 cum 59.54 25104.12
Total (D) Rs. 37804.72
Gross Total (C+D) Rs. 9331641.10
Nagar Nigam Sasaram Nagar Nigam Sasaram Nagar Vikash Pramandal Sasaram
Name Of Scheme:- Construction Of R.C.C Drain From Bauliya mod to Kushwaha Bhawan via Shahu cenema at ward 18 Under Nagar Nigam Sasaram, Rohtas
DETAILS ESTIMATE
S.No. BCD 2022 Items of Work Nos. L B D Quantity Unit Rate Amount Rs.
1 15.7.4 Demolishing brick work including stacking of serviceable material and disposal of unserviceable material within 50 meters lead: In cement mortar
2 2.8.1 Earth work in excavation in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m . including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
3 2.28 Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete.
total 1373.75 cft
4 11.72 Providing designation 100 A one brick flat soling joints filled with local sand ..do…do. All compt
total 5495.00 sft
5 4.1.3 Providing and laying in position cement concrete of specified grade exluding the cost of centring and shuttering-all work upto plinth level. 1:2:4(1 Cement: 2 coarse sand:4 graded stone aggregate 20 mm nominal size)
6 5.1.2 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-All work puto plinth level 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size)
total 16076.80 cft
7 5.22 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
5.22.7C 12mm TMT Bar
Wall -(U-shaped)- 150mm c/c 1570 21.50 33755.00 Ft
Wall -( L- shaped) 150mm c/c (both side) 1570 10.00 15700.00 Ft
slab- Main Bar (Double Layer) 125mm c/c 1870 13.50 25245.00 Ft
total 90400.00 Ft
5.22.7b 10mm dia -150mm c/c
wall layer 32 785.00 25120.00 Ft
slab- Distribution Bar (Double Layer) 2x14 785.00 21980.00 Ft
total 83210.00 Ft
8 19.19.4.1 Providing and fixing in position pre-cast R.C.C. manhole cover and frame of required shape and approved quality
Circular shape 560 mm internal dia 33.00 Each 1393.20 45975.60
9 5.9 Providing Centring and shuttering including strutting,propping etc. and removal of form
A 5.9.2 Walls (any thickness) including attached pilasters. Butteresses, plinth and string courses etc.
B 5.9.3 Suspended floors, roots, landings, balcnies and access platform.
total 3925.00 sft
C 5.9.1 Foundations, footings, bases of columns etc. for mass concrete.
slab side 2 785.00 0.67 1051.90 sft
toal 2229.40 sft
10 2.26 filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth: consolidating each deposited layer by ramming and watering lead
25% Of Qnty Vide item No. 01 244.55 cum 123.90 30299.53
Total (A) Rs. 7659248.04
11 Cariage cost of materials
Local sand 46.57 cum 310.50 14458.66
Coarse sand 210.82 cum 1020.00 215033.64
Stone chips 421.63 cum 2043.39 861563.91
12 Difference cost of materials
Total (B) Rs. 1161781.17
Total (A+B) Rs. 8821029.22
Add GST ( increase 12% to 18% ) as Factor 5.36% . 472807.17
Add Scheme Board L.S 0.00
Total (C) Rs. 9293836.38
13 Add Seigniorage Fee
Local sand 46.57 cum 14.19 660.77
Coarse sand 210.82 cum 17.58 3706.17
Stone Chips -20mm 421.63 cum 59.54 25104.12
Total (D) Rs. 37804.72
Gross Total (C+D) Rs. 9331641.10
Nagar Nigam Sasaram Nagar Nigam Sasaram Nagar Vikash Pramandal Sasaram
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT_19_2026-27_Notice.pdf
NIT • 1.93 MB
NIT_19_2026-27_GR_03.xlsx
NIT • 0.02 MB
NIT_19_2026-27_GR_03-2.xlsx
NIT • 0.02 MB
C1 NIT_19_2026-27_GR_03.xlsx
Corrigendum • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .