| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 CrAccepted-Finance 213 TAJOPUR PASCHIMPURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 UDYAM UP 55 0009322 | MAU | UTTAR PRADESH | 275101 | ₹2.4 Cr | 1 | Accepted-Finance 1ST LOWEST |
| 2 | 2₹2.4 CrRejected-Finance | ₹2.4 Cr | 2 | Rejected-Finance 2ND LOWEST |
| 3 | 3₹2.5 CrRejected-Finance 121004 | ₹2.5 Cr | 3 | Rejected-Finance 3RD LOWEST |
| 4 | 4₹2.5 CrRejected-Finance | ₹2.5 Cr | 4 | Rejected-Finance 4TH LOWEST |
| 5 | 5₹2.5 CrRejected-Finance | ₹2.5 Cr | 5 | Rejected-Finance 5TH LOWEST |
| Sl No | Description | Qty | Unit | M/S Sushila Enterprises L3 | M/S Singh Construction L1 | M/S VAISHNAVI CONSTRUCTION COMPANY L5 | M/S UNITE ENTERPRISES L7 | M/S Ravindra Pratap Singh L6 | M/S SHRI KANT MISHRA CONTRACTOR L8 | ARUN CONSTRUCTION L2 | M/S PRABHAT TRADERS L4 | VIVEK NARAYAN PANDEY CONTRACTOR L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing thick jungle and thorney bushes without uprooting. Above 500cusec | 36,615.6 | sqm | 5.96 ₹2.2 L | 5 ₹1.8 L | 7 ₹2.6 L | 5.4 ₹2.0 L | 4 ₹1.5 L | 6.96 ₹2.5 L | 4 ₹1.5 L | 3 ₹1.1 L | 7.22 ₹2.6 L |
| 2.00 | Earth work in Power transport for a lead upto 3.0 km. Including Excavation, Loading, Unloading, Royalty, with Manual compaction and dressing including all lift etc. | 1,06,498.11 | m³ | 226.15 ₹2.4 Cr | 216 ₹2.3 Cr | 230 ₹2.4 Cr | 252 ₹2.7 Cr | 240 ₹2.6 Cr | 264.6 ₹2.8 Cr | 220 ₹2.3 Cr | 230 ₹2.4 Cr | 274.51 ₹2.9 Cr |
| 3.00 | Earth work in excavation including lead upto 30M & Lift upto 1.5M,excluding mechanical compaction but including manual compaction and dressing to profile . | 54 | m³ | 112 ₹6,048 | 40 ₹2,160 | 125 ₹6,750 | 75 ₹4,050 | 80 ₹4,320 | 130.9 ₹7,068.60 | 100 ₹5,400 | 50 ₹2,700 | 135.8 ₹7,333.20 |
| 4.00 | Centering and shuttering for RCC work including rent of shuttering,material,labour and T&P required for proper completion of work . | 222 | sqm | 528.06 ₹1.2 L | 500 ₹1.1 L | 588 ₹1.3 L | 345 ₹76,590 | 330 ₹73,260 | 617.1 ₹1.4 L | 550 ₹1.2 L | 600 ₹1.3 L | 640.2 ₹1.4 L |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)) | 43.2 | m³ | 6,192.5 ₹2.7 L | 6,800 ₹2.9 L | 7,500 ₹3.2 L | 6,545 ₹2.8 L | 7,000 ₹3.0 L | 7,375.28 ₹3.2 L | 6,500 ₹2.8 L | 9,000 ₹3.9 L | 7,651.36 ₹3.3 L |
| 6.00 | Grassing with selection No. 1 Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately). In rows 5 cm apart in both directions | 19,294.25 | sqm | 10.38 ₹2.0 L | 9 ₹1.7 L | 11 ₹2.1 L | 5.4 ₹1.0 L | 10 ₹1.9 L | 12.15 ₹2.3 L | 10 ₹1.9 L | 5 ₹96,471.25 | 12.61 ₹2.4 L |
Tender Value
₹3.1 Cr
EMD Value
₹6.2 L
Closing Date
11 May 2026, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
AS PER TENDER NOTICE LOT 5
2026_UPIDC_1145685_5
01/SE-XII/2026-27.
Open Tender
Civil Works
210 days
SITAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,036
₹6.2 L
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
9 Jun 2026
6 May 2026
11 May 2026
6 May 2026
11 May 2026
6 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Clearing thick jungle and thorney bushes without uprooting. Above 500cusec | 36,615.6 | sqm | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Earth work in Power transport for a lead upto 3.0 km. Including Excavation, Loading, Unloading, Royalty, with Manual compaction and dressing including all lift etc. | 1,06,498.11 | m³ | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Earth work in excavation including lead upto 30M & Lift upto 1.5M,excluding mechanical compaction but including manual compaction and dressing to profile . | 54 | m³ | - | - | BI01010001010000000000000515BI0100001114 |
| 4 | Centering and shuttering for RCC work including rent of shuttering,material,labour and T&P required for proper completion of work . | 222 | sqm | - | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)) | 43.2 | m³ | - | - | - |
| 6 | Grassing with selection No. 1 Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately). In rows 5 cm apart in both directions | 19,294.25 | sqm | - | - | BI01010001010000000000000515BI0100001115 |
stage.html
html • 0.08 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
TD5.pdf
Tender Documents • 2.28 MB
BOQ_2141897.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid