| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 CrAccepted-AOC 213 TAJOPUR PASCHIMPURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 UDYAM UP 55 0009322 | MAU | UTTAR PRADESH | 275101 | ₹2.4 Cr | 1 | Accepted-AOC 1st lowest |
| 2 | 2₹2.4 CrRejected-Finance | ₹2.4 Cr | 2 | Rejected-Finance 2ND LOWEST |
| 3 | 3₹2.5 CrRejected-Finance 121004 | ₹2.5 Cr | 3 | Rejected-Finance 3RD LOWEST |
| 4 | 4₹2.5 CrRejected-Finance | ₹2.5 Cr | 4 | Rejected-Finance 4TH LOWEST |
| 5 | 5₹2.5 CrRejected-Finance | ₹2.5 Cr | 5 | Rejected-Finance 5TH LOWEST |
| Sl No | Description | Qty | Unit | M/S Sushila Enterprises L3 | M/S Singh Construction L1 | M/S VAISHNAVI CONSTRUCTION COMPANY L5 | M/S UNITE ENTERPRISES L7 | M/S Ravindra Pratap Singh L6 | M/S SHRI KANT MISHRA CONTRACTOR L8 | ARUN CONSTRUCTION L2 | M/S PRABHAT TRADERS L4 | VIVEK NARAYAN PANDEY CONTRACTOR L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing thick jungle and thorney bushes without uprooting. Above 500cusec | 36,615.6 | sqm | 5.96 ₹2,18,228.98 | 5 ₹1,83,078 | 7 ₹2,56,309.2 | 5.4 ₹1,97,724.24 | 4 ₹1,46,462.4 | 6.96 ₹2,54,844.58 | 4 ₹1,46,462.4 | 3 ₹1,09,846.8 Lowest | 7.22 ₹2,64,364.63 |
| 2.00 | Earth work in Power transport for a lead upto 3.0 km. Including Excavation, Loading, Unloading, Royalty, with Manual compaction and dressing including all lift etc. | 1,06,498.11 | m³ | 226.15 ₹2,40,84,547.58 | 216 ₹2,30,03,591.76 Lowest | 230 ₹2,44,94,565.3 | 252 ₹2,68,37,523.72 | 240 ₹2,55,59,546.4 | 264.6 ₹2,81,79,399.91 | 220 ₹2,34,29,584.2 | 230 ₹2,44,94,565.3 | 274.51 ₹2,92,34,796.18 |
| 3.00 | Earth work in excavation including lead upto 30M & Lift upto 1.5M,excluding mechanical compaction but including manual compaction and dressing to profile . | 54 | m³ | 112 ₹6,048 | 40 ₹2,160 Lowest | 125 ₹6,750 | 75 ₹4,050 | 80 ₹4,320 | 130.9 ₹7,068.6 | 100 ₹5,400 | 50 ₹2,700 | 135.8 ₹7,333.2 |
| 4.00 | Centering and shuttering for RCC work including rent of shuttering,material,labour and T&P required for proper completion of work . | 222 | sqm | 528.06 ₹1,17,229.32 | 500 ₹1,11,000 | 588 ₹1,30,536 | 345 ₹76,590 | 330 ₹73,260 Lowest | 617.1 ₹1,36,996.2 | 550 ₹1,22,100 | 600 ₹1,33,200 | 640.2 ₹1,42,124.4 |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)) | 43.2 | m³ | 6,192.5 ₹2,67,516 Lowest | 6,800 ₹2,93,760 | 7,500 ₹3,24,000 | 6,545 ₹2,82,744 | 7,000 ₹3,02,400 | 7,375.28 ₹3,18,612.1 | 6,500 ₹2,80,800 | 9,000 ₹3,88,800 | 7,651.36 ₹3,30,538.75 |
| 6.00 | Grassing with selection No. 1 Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately). In rows 5 cm apart in both directions | 19,294.25 | sqm | 10.38 ₹2,00,274.32 | 9 ₹1,73,648.25 | 11 ₹2,12,236.75 | 5.4 ₹1,04,188.95 | 10 ₹1,92,942.5 | 12.15 ₹2,34,425.14 | 10 ₹1,92,942.5 | 5 ₹96,471.25 Lowest | 12.61 ₹2,43,300.49 |
Tender Value
₹3.1 Cr
EMD Value
₹6.2 L
Closing Date
11 May 2026, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
AS PER TENDER NOTICE LOT 5
2026_UPIDC_1145685_5
01/SE-XII/2026-27.
Open Tender
Civil Works
Fixed-rate
210 days
SITAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,036
₹6.2 L
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
17 Jul 2026
6 May 2026
11 May 2026
6 May 2026
11 May 2026
6 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing thick jungle and thorney bushes without uprooting. Above 500cusec | 36,615.6 | sqm | - | - |
| 2 | Earth work in Power transport for a lead upto 3.0 km. Including Excavation, Loading, Unloading, Royalty, with Manual compaction and dressing including all lift etc. | 1,06,498.11 | m³ | - | - |
| 3 | Earth work in excavation including lead upto 30M & Lift upto 1.5M,excluding mechanical compaction but including manual compaction and dressing to profile . | 54 | m³ | - | - |
| 4 | Centering and shuttering for RCC work including rent of shuttering,material,labour and T&P required for proper completion of work . | 222 | sqm | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)) | 43.2 | m³ | - | - |
| 6 | Grassing with selection No. 1 Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately). In rows 5 cm apart in both directions | 19,294.25 | sqm | - | - |
stage.html
html • 0.08 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
TD5.pdf
Tender Documents • 2.28 MB
BOQ_2141897.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].