| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.7 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹11.9 Cr+₹23.1 L (1.98%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹12.4 Cr+₹75.6 L (6.48%)Admitted-Finance 00 GIRDHAR GARDEN KE SAMNE KHARI PHATAK ROAD VIDISHA VIDISHA MADHYA PRADESH 464001 | VIDISHA | MADHYA PRADESH | 464001 | L3 | Admitted-Finance | ||
| 4 | L4₹13.0 Cr+₹1.3 Cr (11.2%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹13.4 Cr+₹1.8 Cr (15.2%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹12.5 Cr
EMD Value
₹25.0 L
Closing Date
26 Jun 2023, 6:00 pmClosed
ACE PWD ZONE KOTA
ACE PWD ZONE KOTA
Construction work of culvert (2 lane to four lane) on Barkheda (NH-27) to Anta-Sangod road in District Baran
2023_CEPWD_344932_4
ACE PWD ZONE KOTA NITNO-03-2023-24
Open Tender
Civil Works
Percentage
300 days
BARAN
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
10000 EE PWD DIV. MANGROL
₹25.0 L
Yes
7 Jul 2023
21 Jun 2023
28 Jun 2023
21 Jun 2023
26 Jun 2023
21 Jun 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, brush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable Material and stacking of serviceable Material upto 1000m from road boundary. (MoRTH Specification : Clause 201). BY MECHANICAL MEANS In area of Light Jungle | 1.45 | Hectare | 16,093 | ₹23,334.85 |
| 2 | Dismantling of flexible pavements and disposal of dismantled Materials upto a lead of 1000 mtrs. Stacking serviceable and unserviceable Materials separately. (MoRTH specification : Clause 202) BY MECHANICAL MEANS Bituminous Courses | 783.75 | Cum | 189 | ₹1,48,128.75 |
| 3 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock pilling at designated locations and disposal of dismantled Materials upto a lead of 1000 mtrs. stacking serviceable and unserviceable Materials separately. (MoRTH specification : Clause 202) | 577.5 | Cum | 746 | ₹4,30,815 |
| 4 | Earthwork in excavation for roadway in soil, including stacking / disposal of surplus Material exclusive of compensation of earth (MoRTH specification : clause 301 to 305). By Hydraulic Excavator CK-90 of 0.9 cum bucket capacity and tipper with disposal upto 1000 mtrs. | 2,134.5 | Cum | 37 | ₹78,976.5 |
| 5 | Construction of embankment with approved Materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted by vibratory roller 8-10 tonne to meet requirement of Tale 300-2 as per MoRTH specification : Clause No. 305 | 2,134.5 | Cum | 73 | ₹1,55,818.5 |
| 6 | Construction of embankment with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of Table 300-2 including cost of compensation for earth taken from private land with lead upto 1 km as per MoRTH Specification : Clause No. 305. | 1,429.5 | Cum | 122 | ₹1,74,399 |
| 7 | Providing, laying and spreading and compacting specified graded crushed stone in sub-base course including premixing the Material at OMC in mechanical mixer (Pug mill), carriage of mixed Material, laying in uniform layers with Motor Grader, F.E. Loader, on a prepared surface and compacting with Vibratory Compactor to achieve the desired density including all Material, labour, machinery, lighting barricading and maintenance of Driversion complete. (MoRTH specification clause 401). with all lead & lift | 4,399 | Cum | 1,327 | ₹58,37,473 |
| 8 | Dry lean cement concrete sub - base. Construction of dry lean cement concrete 1:3:6 sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blening to be as per Table 600-1, cement content not to be less than 200 Kg/Cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonne vibratory roller, finishing and curing. | 2,271.4 | Cum | 3,159 | ₹71,75,352.6 |
| 9 | Providing and Laying un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub-base with 43 grade cement, coarse and fine aggregate conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or Fix form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures and vacuum processing pump as approved, curing compound, finishing to lines and grades as per drawing as per MoRTH Specification : Clause No. 602, 112. Using Cement concrete M-30 pavement Grade | 6,898.2 | Cum | 5,881 | ₹4,05,68,314.2 |
| 10 | Earthwork in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layer, ramming, watering and disposal of surplus soil within a lead of 1000 meters, as per drawing and technical Earth in excavation for foundation of specification. [MoRTH Specification : Clause 304]. In ordinary soil [MoRTH Specification : clause 301] BY MECHANICAL MEANS Depth upto 3m | 9,807.55 | Cum | 74 | ₹7,25,758.7 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.47 MB
Tendernotice_2.pdf
PDF • 16.66 MB
Tendernotice_3.pdf
PDF • 8.19 MB
BOQ_612613.xls
BOQ • 0.31 MB
POST-QUALIFICATION-04.pdf
Tender Documents • 1.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .